Instruction Manual for V-TAC models including: VT-5139 Battery Storage, VT-5139, Battery Storage, Storage
5kW/h jeb 5120W Akumulators ar elektronisku LED displeju,V-TAC zīmols,
File Info : application/pdf, 7 Pages, 3.49MB
DocumentDocumentINSTRUCTION MANUAL BATTERY STORAGE TECHNICAL DATA Battery type LFP Rated capacity of battery pack 100Ah Rated voltage of battery pack 51.2V Maximum charging voltage 57.6V Minimum discharge voltage 40V Rated charge/discharge current 100A Maximum charge/discharge current 120A Charging temperature range 0 to +45°C Discharge temperature range -20°C to +50°C Depth of discharge 80% Discharge magnification 1C Self-discharge (25°C) 3%/Month Cycle life 5000 times0.5C Interactive mode (APP) LCD+Button+Bluetooth Dimension 700*515*250mm (Error±2mm) Weight About 65KG Compatible with Solar Inverter [VT-66036103, VT-6605103, VT-12040] INTRODUCTION Thank you for selecting and buying V-TAC Product. V-TAC will serve you the best. Please read these instructions carefully & keep this user manual handy for future reference. If you have any another query, please contact our dealer or local vendor from whom you have purchased the product. They are trained and ready to serve you at the best. Multi-Language Manual QR CODE Please scan the QR code to access the manual in multiple languages. IN CASE OF ANY QUERY/ISSUE WITH THE PRODUCT, PLEASE REACH OUT TO US AT: SUPPORT@V-TAC.EU FOR MORE PRODUCTS RANGE, INQUIRY PLEASE CONTACT OUR DISTRIBUTOR OR NEAREST DEALERS. V-TAC EUROPE LTD. BULGARIA, PLOVDIV 4000, BUL.L.KARAVELOW 9B WARNING 1. Please make sure to turn off the power before starting the installation. 2. Installation must be performed by a qualified electrician. This marking indicates that this product should not be disposed of with other household wastes. Caution, risk of electric shock. 20 PAP CONTROL PANEL POWER BUTTON UP BUTTON DOWN BUTTON LCD SCREEN HUMAN-COMPUTER INTERACTION CONTENT Pro je ct Button Switch Functi on Rema rk When Powered on: 1. Short press: invalid 2. Long press (press for 4~6 seconds and release): power off POWER When powered off: 1. Short press: invalid 2. Long press (press for 4~6 seconds and release ): turn on UP Page up DOWN Page down DC OUTPUT Use the key to open the front panel before switching on and off HUMAN-COMPUTER INTERACTION CONTENT Project Functi on There are 6 display interfaces in total: 1. Main interface information (voltage/current/SOC/status code); 2. Secondary main interface information (maximum and minimum cell LCD voltage/maximum and minimum temperature); 3. Display 1~4cell voltage; 4. Display 5~8cell voltage; 5. Display 9~12cell voltage; E11: Level 1 alarm of module equipment failure E12: Module equipment failure secondary alarm E21: Level 1 alarm of module communication abnormality E22: Module communication abnormality secondary alarm E31: Module address is abnormal level 1 alarm E32: Module Address Abnormal Level 2 Alarm E41: Module balancing abnormal level 1 alarm E42: Module balance abnormal secondary alarm E51: Module total voltage overvoltage level 1 alarm E52: Module total voltage overvoltage secondary alarm E61: Level 1 alarm of module total voltage undervoltage E62: Second-level alarm of module total voltage undervoltage Error code E71: Module charging overcurrent level 1 alarm E72: Module charging overcurrent secondary alarm E81: Module discharge overcurrent level 1 alarm E82: Module discharge overcurrent secondary alarm E83: Module discharge load short circuit (serious) E91: Single battery overvoltage level 1 alarm E92: Single battery overvoltage secondary alarm E101: Single battery undervoltage level 1 alarm E102: Single battery undervoltage secondary alarm E111: Module battery high temperature level 1 alarm E112: Module battery high temperature secondary alarm E121: Module battery low temperature level 1 alarm E122: Module battery low temperature secondary alarm INTERFACE DEFINITION Port Battery interface Port type BAT NO Signal name 1 BAT+ 2 BAT- Remark Battery positive output interface Battery negative output interface Battery output switch Battery - Battery Battery output switch (control positive) INSTALLATION 1) Refer to the figure below to install the battery module, the fixing feet are on the ground, the module body is fixed on the wall, and the screws are 4~6mm combination screws. The reference tightening torque is 35 N.m. (unit mm) 2) Check whether the battery module is firm and safe. (Avoid damp, rain, and direct sunlight as much as possible) APP INSTALLATION Step 1: Scan the given QR code to download App then install the app. Step 2: Aer the installaon is complete, open the phone sengs - applicaon sengs authorizaon management, and authorize the Bluetooth and posioning of this APP. For ANDROID For IOS Step 3: Open the soware and click "BLE" to connect to Bluetooth Step 4: Click "Scan Devices" to scan the machine, find the device starng with "AT" and Click "connect" to connect. Step 5: Aer successfully pairing the device with the app, you can start reading the relevant data, including "CONNECTION, DEVICE INFO, LIVE DATA, HISTORY INFO, WARNING INFO, CONTACT" to switch (See the below pic).