Wavetube Double Counter Setup Guide

Assembly Instructions

  1. Assemble each frame by matching numbers and snapping together.

  2. Bolt the frames together using the supplied bolts and wing nuts. Ensure a spacer nut is installed between the frames.

  3. Install the graphic by pulling it on from the bottom up and zipping around the top. Be sure to align holes in the graphic with the holes in the frame.

  4. Set the counter top on the frame and secure by placing bolts through the graphic and frame. Secure with a wingnut from the inside of the frame.

Models: WTC88, Wavetube, WTC88 Wavetube Double Counter Setup, WTC88, Wavetube Double Counter Setup, Double Counter Setup, Counter Setup

PDF preview unavailable. Download the PDF instead.

Wide counter rev Adobe Illustrator 28.7 (Windows) Adobe PDF library 17.00