Installation Guide for SUSSEX models including: VFMT Voda Floormount Mixer, VFMT, Voda Floormount Mixer, Floormount Mixer, Mixer

VFMHTSXFMMIK - Sussex - Installation Guide


File Info : application/pdf, 6 Pages, 1.64MB

PDF preview unavailable. Download the PDF instead.

4a7bbdf3ecb1c79c5ca70a8f651ec93e436053c3 SUSSEX VODA VFMHT floormount mixer with handheld Installation Guide 1
Voda
Floormount mixer Fixing distances

Product code: CBM

Product code

VFMT VFM200T VFM250T

Floormount mixer 160mm Floormount mixer 200mm Floormount mixer 250mm

VFMHT VFMMCT VFMBMCT

Floormount mixer with hand held Floormount mixer with curved outlet Floormount basin mixer curved

sussextaps.com.au

AS/NZS 3718:2005 LIC. 20081
Tapware is to be installed by a Licensed Plumber in accordance with AS/NZS 3500:2003 Recommended working water pressure 300-500 kpa. Maximum water temperature is 65 deg.c
Copyright © Sussex Taps.

Voda
Floormount mixer Concrete floor Rough-in

Product code: CBM

x .

ro m

40A0pmp

CONCRETE RECES REQUIREMENTS
FE EHDOCT4H/A0CpA0OmpNLrNoDmEx.L FE EHDOCTH/ CAONLNDEL

FIXINF AND CONNECTIONS (FIXING VALVE)

FIXED AND CONNECTED VALVE

BACK FILLED RECESS

*To install this floormount fixing valve, a 50mm step down (recess) is required in the concrete slab. The floormount fixing valve is supplied with end caps, pressure plate and fixing bolts. Leave intact until final fit off with the floormount mixer.

New concrete floor (pre-pour)
*To install the Floormount Fixing Valve a 50mm step down (recess) is required in the concrete surface where the floormount is to be located. - The recess area is to be a minimum of 200 x 300mm to allow enough room for the fixing valve to be fitted. NOTE: This can be a larger area if unsure of exact mounting position. Important: the recess area is required to be 50mm deep and must be flat and level.
Existing concrete floor
- Cut 400 x 400mm section through concrete slab where the floormount mixer is to be located (Fig. 1). - Remove cut section and drill for the appropriate concrete `tie-rods' into side walls of cavity. - Fit `tie-rods' and pour concrete to create a 50mm step down (recess) from the original concrete
floor surface (Fig. 1). NOTE: Recess area must be flat and level. - Hot and cold lines can be chased into the recessed area by cutting a minimum 50 x 50mm channel (Fig. 1).
Fixing and connections (Fig. 2 & 3)
- Connect 1/2" elbows (or male/female nipples) to Fixing Valve in preparation for the hot/cold water lines. - Postion fixing valve into concreted recess area. NOTE: Align "Front" to face bath or wash vessel. - Mark and drill for 8mm "dyna bolt" or other appropriate anchoring bolts (not supplied). - Fix Floormount Fixing Valve and complete hot and cold water line connections. - Ensure the valve is level and well anchored. - Tighten "end caps" and perform water testing, and ensure there are no water leaks. - Leave end caps, pressure plate and fixing bolts in the valve to protect the threads until final fit-off.
Back-filled recess (Fig. 4)
- Once all water connections are made and tested, fill in the recessed area and channelling up to the Fixing Valve with a mortar mix.
- After mortar has set, seal the area between mortar and the Fixing Valve.

sussextaps.com.au

AS/NZS 3718:2005 LIC. 20081

Voda
Floormount mixer Wooden floor Rough-in

Product code: CBM

CONCRETE RECES REQUIREMENTS

50mm

JOIST

100mm MIN

50mm TYP

NOGGIN

400mm

JOIST

FIXED AND CONNECTED VALVE
M8 BOLT

END CAPS

HOT COLD

JOIST

NOGGIN

JOIST

FIXINF AND CONNECTIONS (WOODEN) (FIXING VALVE)
END CAP (WITH SEAL)

M8 X4 0 BO LT PRESSURE PLATE

FLOORMOUNT MIXER ADAPTER PLATE

CONNECTING FITTING
FLOORMOUNT MIXER VALVE BODYE

FLOORMOUNT MIXER VALVE BASE PLATE

HOT

FRONT

SCREW AND WASHER (X 4) (NOT SUPPLIED)
LBOW (X2) (NOT SUPPLIED)
COLD

JOIST

NOGGIN

JOIST

50mm

BACK FILLED RECESS

TILE
GLUE
WATER PROOF
19mm PARTICLE
BOARD

40mm APPROX

Rough-in (Wooden floor)
- Fix a 100x50mm min noggin. 50mm below the top of the joists in the position where the floormount mixer is to be located (Fig. 1).
NOTE: the floormount mixer has been supplied to suit a concrete installation. Some parts need to be changed to suit a wooden floor. - To suit wooden flooring, remove the m8x25mm bolts and the pressure plate. Using a 6mm allen key, remove the
two connection fittings (O-ring sealed) and replace with the longer version (tighten well). - Add the Floormount Mixer Adapted Plate. Replace the Pressure Plate and loosely fit the M8x40mm bolts (Fig. 2). NOTE: the shorter connection fittings and M8x25mm bolts will not be required. - Add appropriate elbows or 1/2" BSP nipples to allow for hot/cold water connections (not supplied). - Secure Floormount Mixer Valve to coggin using appropriate wood screws (not supplied). NOTE: "FRONT" to face water vessel. - Complete hot/cold water connections. - Ensure the valve is level and well anchored.
Fixing and connections (Fig. 2 & 3)
- Connect 1/2" elbows (or male/female nipples) to Fixing Valve in preparation for the hot/cold water lines. - Postion fixing valve into concreted recess area. NOTE: Align "Front" to face bath or wash vessel. - Mark and drill for 8mm "dyna bolt" or other appropriate anchoring bolts (not supplied). - Fix Floormount Fixing Valve and complete hot and cold water line connections. - Ensure the valve is level and well anchored. - Tighten "end caps" and perform water testing, and ensure there are no water leaks. - Leave end caps, pressure plate and fixing bolts in the valve to protect the threads until final fit-off.
Back-filled recess (Fig. 4)
- Once all water connections are made and tested, fill in the recessed area and channelling up to the Fixing Valve with a mortar mix.
- After mortar has set, seal the area between mortar and the Fixing Valve.

sussextaps.com.au

AS/NZS 3718:2005 LIC. 20081

Voda
Floormount mixer Concrete floor Fit-off

Product code: CBM

FI G 5
LE VELLING SCREWS
20mm

SUSSEX FLOORMOUNT CMYILXINEDRER SUSSEX FLOORMOUNT COVER FLANGE
M8 BOLT (X4)

SUSSEX FLOORMOUNT FITTING

H

C

APPL Y SEAL ANT

TILE GLUE
WATER PROOF

PRESSURE PLATE

Fit-off (Concrete floor)
- Prior to installing, ensure floor around fixing valve is completely sealed. - Raise the floormount cover flange. - Remove "end caps" and retain if required. - Connect hot and cold hoses from Floormount Mixer (a second person may be required to assist). NOTE: the hose connection has a self sealing fitting. No sealant is required. - Tighten the hex nuts of the hose fittings using an appropriate spanner (tighten well). - Carefully lower the mixer to meet the pressure plate. NOTE: "Front" of Floormount Mixer must face the bath or wash vessel. - Align and fit supplied M8 bolts. - Before fully tightening, allow water flow and check for water leaks. - Tighten M8 bolts and check Floormount Mixer is level. If levelling is required, loosen M8 bolts and
adjust levelling screws as required. - To complete the installation, lower the cover flange until it meets the finished floor surface. - Check mixer function and look for any leaks.

FI G 6
NO TE : "FRONT " TO FACE WASH VESSEL
20mm APPROX

SUSSEX FLOORMOUNT CMYILXIENRDER
SUSSEX FLOORMOUNT COVER FLANGE FINI SHED FLOOR SURFACE

sussextaps.com.au

AS/NZS 3718:2005 LIC. 20081

Voda
Floormount mixer Wooden floor Fit-off

Product code: CBM

FI G 5

LEVELLING SCREW
APPLY SEALANT
H

FLOORMOUNT MIXER
FLOORMOUMT COVER FLANGE
M8 BOLT (X4)
FLOORMOUNT FITTING
C
40mm APPROX

TILE
GLUE
WATER PROOF 19mm PARTICLE BOARD

JOIST

NOGGIN

JOIST

Fit-off (Wooden floor)
- Prior to installing, ensure floor around fixing valve is completely sealed. - Raise the floormount cover flange. - Remove "end caps" and retain if required. - Connect hot and cold hoses from Floormount Mixer (a second person may be required to assist). NOTE: the hose connection has a self sealing fitting. No sealant is required. - Tighten the hex nuts of the hose fittings using an appropriate spanner (tighten well). - Carefully lower the mixer to meet the pressure plate. NOTE: "Front" of Floormount Mixer must face the bath or wash vessel. - Align and fit supplied M8 bolts. - Before fully tightening, allow water flow and check for water leaks. - Tighten M8 bolts and check Floormount Mixer is level. If levelling is required, loosen M8 bolts and
adjust levelling screws as required. - To complete the installation, lower the cover flange until it meets the finished floor surface. - Check mixer function and look for any leaks.

FI G 6
40mm APPROX

NOTE:
" FRONT" TO FACE WASH VESSEL

FLOORMOUNT MIXER
FLOORMOUNT COVER FLANGE
FINISHED FLOOR SURFACE
FR ONT

sussextaps.com.au

AS/NZS 3718:2005 LIC. 20081

Voda
Floormount mixer Installation kit Fit-off

Product code: CBM

F/MOUNT MIXER

F/MOUNT MIXER

F/MOUNT MIXER STRAIGHT

F/MOUNT MIXER STRAIGHT

F/MOUNT W/ HAND SHOWER
NOTE: Handpiece must be fixed to rear of the mixer body

F/MOUNT W/ HAND SHOWER
NOTE: Handpiece must be fixed to rear of the mixer body

F/MOUNT W/ HAND SHOWER
NOTE: Handpiece must be fixed to rear of the mixer body

F/MOUNT W/ HAND SHOWER
NOTE: Handpiece must be fixed to rear of the mixer body

FR ON T

FR ON T

FR ON T

FR ON T

FR ON T

FR ON T

FR ON T

FR ON T

sussextaps.com.au

AS/NZS 3718:2005 LIC. 20081



References

Adobe InDesign 17.1 (Macintosh) Adobe PDF Library 16.0.5