Introduction
Basic features
The DTSU666 CT Meter can achieve energy management together with SolaX three-phase inverters. It applies to 200A systems and below, measuring the import, export, and total power and energy.
System Diagram: A diagram shows a PV array connected to a SolaX inverter (INV), which is then connected to the Energy Meter (DTSU666-CT). The Energy Meter is also connected to the electrical grid and the LOAD.
Terminals and Dimension
Dimensions: The meter has dimensions of 100mm height, 72mm width, and 45mm depth. It features terminal blocks for various connections.
Terminal Layout: A diagram illustrates the terminal layout, showing connections for RS485 (ports 24, 25), Voltage wires (ports 2, 5, 8 for L, port 10 for N), and CT input ports (ports 1, 3, 4, 6, 7, 9).
Wiring Diagram: Detailed wiring diagrams are provided for both three-phase three-wire and three-phase four-wire systems, indicating connections for Grid, CT input, RS485, and Inverter.
Supported Cable Size:
- CT cable: ≥5AWG or ≤16mm²
- Communication cable: 17~23AWG or 0.25~1mm²
- AC power cable: 17~23AWG or 0.25~1mm²
Cable Withstand Voltage: 600V
Performance and Specification
Model | Voltage | Current | Type |
---|---|---|---|
DTSU666-CT | 3×220/380V...3×240/415V | 0-200A (Via transformer) | CT |
Meter Specifications:
- Frequency: 50/60Hz
- Impulse/kWh: 6400imp/kWh
- Current Range: 0.015-1.5(6)A
- Voltage Range: 3×220/380V...3×240/415V
- Standards: EN50470-11-3 Cl.C3K6
- Model Number: 0120/SG50435 EM19 0120
Installation
Step 1: RS485 terminal connection
- Prepare a communication cable.
- Strip the insulation from the communication cable.
- Connect the meter communication cable and inverter with reference to the inverter manual.
- Connect the other end of the communication cable to ports 24 and 25 of the meter.
Step 2: Voltage wire connection
- Connect the L wires with ports 2/5/8 of the meter.
- Connect the N wire with port 10 of the meter.
- Connect the L wires with CTs and insert the CT wires to ports 1/3/4/6/7/9 of the meter respectively.
Note: Use the same color communication cable for the same communication port identifier between the inverter and the meter.
Important: Only authorized personnel is allowed to set the connection.
LCD Description
Symbol | Meaning | Example | Meaning |
---|---|---|---|
Σ | The phase parameter indicates that the data displayed by LCD is a phase parameter. | L | The current running line is sensibility |
C | Current running line is capacitive | V | A unit of voltage indicating that the data displayed by the LCD is a voltage. |
U1 U2 U3 | Determine whether the current three phase voltage is missing (the corresponding Ux flickers). | A | The unit of current indicating that the data displayed by the LCD is current. |
kWh | The active power unit indicates that the data displayed by LCD is active power. | var | A reactive power unit indicating that the data displayed by LCD is reactive power. |
PF | Power factor, indicating that the data displayed by LCD is power factor. | Hz | A unit of frequency that indicates that the data displayed by the LCD is frequency. |
kvarh | A reactive power unit indicating that the data displayed by LCD is reactive power. | ||
[Quadrant Symbol] | Current running quadrant indication | [Time Period Symbol] | Current rate period |
[Missing Voltage Symbol] | Determine whether the current three phase voltage is missing (the corresponding Ux flickers). | [Missing Current Symbol] | Determine whether the current three phase current is missing (the corresponding Ix flickers). |
[Switch Symbol] | Current switch input and output status identification |
Warranty Regulation
Terms and conditions
SolaX grants a warranty of 12 months as standard, starting from the date of the purchase invoice. SolaX will perform warranty service when the faulty unit is returned with a copy of the invoice and warranty card issued by the dealer and manufacturer. The unit's type label must be fully legible. SolaX reserves the right to modify warranty terms and conditions if these requirements are not met.
Exclusion of liability
Warranty claims are excluded for direct or indirect damage due to:
- Use of the unit in unintended ways, improper installation not complying with standards, improper operation, unauthorized modification, or repair attempts.
- Absence of warranty card and serial number.
- Operating the units with defective protective equipment.
- Influence of foreign objects and force majeure.
- Inadequate ventilation.
- Violation of relevant safety regulations.
Warranty Registration:
To register your SolaX product, mail the warranty card to SolaX Power Network Technology (Zhejiang) Co., Ltd. at No.288 Shizhu Road, Tonglu Economic Zone, Tonglu City, Zhejiang Province, China. Tel: +86 571 56260011, FAX: +86 571 56075753, EMAIL: service@solaxpower.com, WEB: www.solaxpower.com.
Online warranty registration is available at: http://www.solaxpower.com/en/warranty-registration/
Warranty Registration Form:
- Name:
- Country:
- Phone Number:
- Zip Code:
- Email:
- Address:
- Product Serial Number:
- Date of Commissioning:
- Installation Company Name:
- Date of Delivery:
- Signature: