SeeLess Solutions Installation Guide

This guide provides detailed instructions for installing SeeLess Solutions' in-wall plaster mounting platforms, including models SLA-1G, SLA-2G, SLA-3G, and SLA-4G.

Rough-In Installation

Proper rough-in installation is crucial for a seamless finish. Ensure the electrical box is centered and adjust the SeeLess black perforated aluminum brackets to the correct drywall thickness (1/2", 5/8", or 3/4"). Caddy bars are recommended for mounting between studs. Verify that studs are level to ensure the platform is leveled with the drywall. Avoid over-screwing to prevent cracking the gypsum.

Post Install Drywall

After the rough-in, cut the drywall around the platform. Level the drywall with the lower line of the joint on the front of the gypsum platform. Apply fiberglass tape and drywall compound to the joints, sand smooth, prime, and paint for a clean finish. SeeLess suction cups can be used to remove the faceplate.

For more detailed instructions, please visit www.seeless.com.

Models: SLA-1G-2G-3G-4G In-Wall Plaster, SLA-1G-2G-3G-4G, In-Wall Plaster, Wall Plaster, Plaster

File Info : application/pdf, 5 Pages, 2.05MB

PDF preview unavailable. Download the PDF instead.

SLA-1G-2G-3G-4G INSTALL GUIDE compressed 1 ?v=1663621759

References

Adobe Illustrator 24.0 (Windows) iLovePDF