Instruction Manual for THERMON models including: Terminator ZT-C-P-XP Thermostat Connection Kit, Terminator ZT-C-P-XP, Thermostat Connection Kit, Connection Kit

Thermostat ZT-P-XP

Heat Trace - Chống đông Và Kiểm Soát Nhiệt độ đường ống 2021 kiểm soát và điều chỉnh nhiệt độ của đường ống, đường ống dẫn dầu, bể chứa và bể chứa trong hệ thống bảo vệ và duy trì nhiệt độ, công ty “Wili Co., Ltd” đề xuất bộ điều nhiệt và bộ điều khiển độ cao


File Info : application/pdf, 4 Pages, 5.17MB

PDF preview unavailable. Download the PDF instead.

PN50850U-Terminator-ZT-P-XP-Installation
TerminatorTM ZT-P-XP TerminatorTM ZT-C-P-XP
Thermostat Connection Kit
INSTALLATION PROCEDURES

Te
Forwius tb ,IIIFC°MCT110T06A,0T°8EC5-X°T0C8055°8CX

ZTmosstat
IP6617-6205°C II

rminator e atshaTnheardmjuosntahbeleatcinogntcraobl/lleimsiytesrtetmher
PN 27656

 IE2CGEDx

TFEaxMdG+b51e00b.°0CI0IC2T25TX,51-0T60,°ECx;

-60°C
tb IIIC Ex db

eTb1T0aI0IC°C+T-4T508-T56°C, Ex

For Thermostat Connection (1-2 Heat Tracers) Applications for Use With Parallel Heat Tracers

TerminatorTM ZT-(C)-P-XP

The following installation procedures are suggested guidelines for the installation of the Terminator ZT-P-XP and ZT-C-P-XP Kits.

Kit Contents

1

2

ForwitwuhseTea r
Ex t°bC,II4IF0C°MCT110T06A,0T°8EC5-X°T0C8055°8CX

Temrmininaattoorr FsoarTnuhitesaherdmTjauhossentaramnhbeloaeadntcjiunhosgnettaacrbaotilblne/llgiemcocsitynaesbtrrtleotehleth

ZZTTrmemorssmtsaoytssttaetms

PN 270655639

-45°C



IP66 Ta 

+ 55°C

II 2 G & D EEx ed II C T5 DEMKO 02ATEX132552X

IP6617-6205°C

II 2

IECGEDxTEaFxMdG+b51e00b°.0CI0ICT252T,X51-0T06,°CEx; -tE6bx0I°dICICbTeT1b0a0IIC°C+T-T58-T56,

4 6

5 7

3

8

INSTALLATION PROCEDURES

Receiving, Storing and Handling 1. Inspect materials for damage incurred during
shipping. 2. Report damages to the carrier for settlement. 3. Identify parts against the packing list to ensure
the proper type and quantity has been received. 4. Store in a dry location.

Dimensions
155 mm

190 mm

9 260 mm

Item
1
2 3 4 5 6
7
9

Quantity

Description

Expediter Assembly

Support Cap with O-Ring

1

Threaded Grommet Compressor

Grommet

Support Base with O-Ring

1

Junction Box Lid

1

Junction Box Base w/O-Ring and M25 Dust Cap

1

Nut

1

Banding

1

Banding Guide

Thermostat w/ Terminal Blocks (Refer to

terminal specifications for maximum allowable

1

wire size) Thermostat Type

Terminals

ZT-C-230 Vac

4 mm2 terminals

ZT-C-400 Vac

6 mm2 terminals

1

Junction Box Cord

2

Blind Plug

Order Separately

PETK Power and End Termination Kits (per cable)

PETK-1 PETK-2 PETK-3-ZT

for RSX, VSX, VSX-HT, BSX for KSX, HTSX, USX for HPT, FP

1

2

3

4

5

6

7

Item 1 2 3 4 5 6 7

Quantity

Description

1

RTV Tube

1

Power Connection Boot

1

Ground Sleeve

1

End Cap

1

Tape Strip (PETK-3-ZT only)

1

Grommet (PETK-3-ZT only)

1

End Termination Caution Label

Tools Required
3 mm 8 mm

Terminator-LN-Tool (order separately)
28 mm

100 mm

Warnings · Due to the risk of electrical shock, arcing and fire
caused by product damage or improper usage, installation or maintenance, a ground-fault protection device is required. · Installation must comply with Thermon requirements (including form PN 50207U for Ex systems) and be installed in accordance with the regulations as per the norm EN IEC 60079-14 for hazardous areas (where applicable), or any other applicable national and local codes. · Component approvals and performance ratings are based on the use of Thermon specified parts only. · De-energize all power sources before opening enclosure. · Avoid electrostatic charge. Clean only with a damp cloth. · Keep ends of heating cable and kit components dry before and during installation. · Minimum bending radius of heating cable is 32 mm (except HPT is 57 mm and FP is 19 mm). · Individuals installing these products are responsible for complying with all applicable safety and health guidelines. Proper Personal Protective Equipment (PPE) should be utilized during installation. Contact Thermon if you have any additional questions. · Consult the manufacturer for dimensional information on the flameproof joints for repair.
Specific Conditions of Use
1. Consult the manufacturer for dimensional information on the flameproof joints for repair.
2. Avoid electrostatic charge. Clean only with a damp cloth. 3. T5 and T100°C for switching amperage of thermostat limited to 25 Amps
maximum. 4. T6 and T85°C for switching amperage of thermostat limited to 16 Amps
maximum.

Certifications/Approvals
IP66; -60°C  Ta  +55°C T6, 85°C 16 Amps Max -60°C  Ta  +50°C T5, 100°C 25 Amps Max Ordinary & Hazardous Locations

Terminator ZT
FMG 10.0022X Ex db eb IIC T6...T5 Gb Ex tb IIIC T85°C...T100°C Db

0344

II 2 GD Ex db eb IIC T6...T5 Gb, Ex tb IIIC T85°C...T100°C Db FM10ATEX0058X

Terminator ZT-C

EPS 19.0094X Ex db eb IIC T5-T6, Ex tb IIIC T100°C-T85°C

0344

II 2 GD Ex db eb IIC T5-T6, Ex tb IIIC T100°C-T85°C EPS 19ATEX1216X

2

TerminatorTM ZT-(C)-P-XP

INSTALLATION PROCEDURES

GRW

GRW-G/Tstat

1. Locate bus connection (HPT and FP only)
and cable as shown. Cut end of cable at angle to aid in piercing grommet. Leave additional cable for expansion loop. See page 5 for multiple cable installation tips.

2. For HPT and FP cable, exchange
grommet in Terminator with grommet
provided in PETK-3-ZT.

3. Insert cable into expediter. If mounted on
bottom or side of pipe, punch out weep
hole.

4. Slide expediter toward pipe and route
cable through support base entry.

5. Insert banding guide into expediter and
snap into place.

6. Mount expediter to pipe using pipe band.
Do not band over cable.

7. Cut off end of cable.

8. Terminate cable with appropriate PETK
termination kit. Refer to PETK installation instructions. Push excess cable back through expediter. Tighten cap securely. Tape cable expansion loop to pipe.

9. Remove expediter from pipe by
removing pipe band.

10. Route thermostat bulb through nut and
expeditor opening in junction box base. If necessary, apply lubricant (user supplied) to end of thermostat bulb. Slide through conical grommet hole. Push excess capillary tube through expeditor.

11. Fix thermostat bulb and capillary tube to
pipe.
3

12. Mount expediter to pipe using pipe
band. Do not band over cable. Tape cable
expansion loop to pipe.

TerminatorTM ZT-(C)-P-XP

INSTALLATION PROCEDURES

13. Take out thermostat. Mount junction box
base on expediter. Make sure to align slots to properly orient junction box base. Tighten nut with Terminator-LN-Tool. If mounting horizontally, threaded gland holes must face downward.

14. Remove M25 dust cap. Install M25 power
gland (order separately) and M25 blind
plugs.

15. Install power cable (if necessary).

Te
Forwiuse ° C tb ,IIIFCMT110T06A,0T°8EC5-X°T0C8055°8CX

ZTmmosstat
IP6617-6205°C II

rminator as
th

aTnheardmjuosntahbeleatcinogntcraobl/lleimsiytesrtether

PN 27656

IE2CGEDxTFEaxMdG+b51e00b.°0CI0IC2T25TX,51-0T60,°ECx;

-60°C
tb IIIC Ex db

eTb1T0aI0IC°C+T-4T508-T56°C, Ex

16. Install thermostat and complete system
wiring. Terminal set screws shall be tightened to a torque value of 1.4 Nm (12.4 lb-in). See page 5 for wiring details. Set thermostat at desired setpoint.
Wiring Details

Heat Trace #1

Heat Trace #2

17. Install junction box lid and twist hand
tight. Insert screwdriver into ratchet slots located on side of junction box base. Use screwdriver to ratchet on junction box lid. Lid will rotate 30 degrees.
Heat Trace

18. Lid latch mechanism fully engaged.
To remove lid, repeat step 17 but in the opposite direction.
Two-Cable Layout Tips

PE N N 2 2 4 L1 PE
Power Supply L1 N PE
Thermostat Connection (1 or 2 Heating Cables)

PE 4 2 L1 N
Power Supply L1 N PE
Thermostat Connection (1 Heating Cable Shown) 400 Vac Option.

Locate bus connection (HPT and FP only) and cable as shown. Cut end of cable at angle to aid in piercing grommet. Leave additional cable for expansion loop.

Insert two cables into expediter.
Note: For HPT and FP cable, exchange grommet in Terminator with grommet provided in PETK-3-ZT.

European Headquarters: Boezemweg 25 · PO Box 205 · 2640 AE Pijnacker · The Netherlands · Phone: +31 (0) 15-36 15 370 Corporate Headquarters: 100 Thermon Dr · PO Box 609 San Marcos, TX 78667-0609 · Phone: 512-396-5801 · 1-800-820-4328 For the Thermon office nearest you visit us at . . . www.thermon.com

Form PN50850U-1221

© Thermon, Inc. · Printed in U.S.A. · Information subject to change.



References

Adobe PDF Library 16.0.3 Adobe InDesign 17.0 (Windows)