Installation Instructions
⚠️ Note: Do not disassemble this product under the guidance of non-professional personnel. The picture is for reference only. All parts and accessories are subject to the real object. The company reserves the right of interpretation. If there is any change in the relevant content, please refer to the latest "installation instruction" issued by the company. Thank you very much!
Installation Steps
Step 1: Prepare the Wall Opening
Diagram shows a wall with a rectangular hole cut out, and an embedded box being positioned inside the hole.According to the basic size of the embedded box, use a special tool to cut the main hole on the solid wall. The depth of the hole should be considered to be between 2.17" and 2.76" from the surface of the wall after final treatment.
Step 2: Pre-bury Water Pipes
Diagram illustrates the embedded box installed in the wall, with pipes connected to its inlets. Labels indicate 'Mixed water outlet pipe', 'Hot water inlet pipe', and 'Cold water inlet line'. Arrows show the direction of water flow.Pre-bury the intake water pipes, paying attention to the upper, lower, and left directions relative to the embedded box. The lower left interface is connected with the hot water pipe, and the right interface is connected with the cold water pipe.
Step 3: Test Inlet Pipe Connections
Diagram shows the embedded box with connected inlet pipes. A measurement of 7.09" is indicated. Arrows suggest opening the water source and testing for leaks.Open the water source to test whether the left and right inlet pipes are tightly connected without leakage. After the inlet pipes are tested, adjust the flow switch to open the account to test whether the mixed outlet pipes are tightly connected without leakage.
Step 4: Seal and Fix Components
Diagram shows the embedded box and pipes secured within the wall opening, with filler material around them. The plastic protective cover is shown being removed.Ensure that the pipe connections are correct and there is no leakage during the water test. After installing other embedded components of the shower, seal and fix the embedded box and pipes with filler. The solid wall embedded box is now installed, and the plastic protective cover can be removed.
Step 5: Tile the Area
Diagram shows a tile with specific dimensions indicated: 1.5", 1.5", 1.5", and 1.09" (diameter).Stick the tile as shown in the picture.
Step 6: Install Outlet Pipe
Diagram illustrates the outlet pipe being attached to the faucet body, with sealing tape being wound around the threads.Install the outlet pipe and wind sealing tape counterclockwise at the thread connection. Wind several times to ensure a proper sealing effect.
Step 7: Final Check and Cleaning
Diagram shows the fully installed faucet.Installation is finished. Test whether each function is used normally. Wipe the bibcock surface clean with a soft cloth.
