Instructions for FRYMASTER models including: 8263782, 8198020, FQE30, 2-Vat 3000 Fryers, FQE30 2-Vat 3000 Fryers, Fryers

Baker, Justin T

[PDF] Instruction Sheet - Frymasterfm-xweb.frymaster.com › udocs

Instruction Sheet - Frymaster

prieš 8 dienas — Follow these instructions to install a solid shortening heater kit 8263782 in FQE30 2-Vat 3000 fryers. 1. Disconnect power cord from power.


File Info : application/pdf, 4 Pages, 770.46KB

PDF preview unavailable. Download the PDF instead.

8198020
Instruction Sheet

Follow these instructions to install a

solid shortening heater kit 8263782

in FQE30 2-Vat 3000 fryers.

1. Disconnect power cord from power

source before removing any panels

from the equipment. Remove the

fryer from the hood to gain access

Fig 1

to the front and back of the unit.

2. Remove lower back. It is recommended to also remove doors and cabinet sides for ease of access.

3. Locate and remove ATO box cover and carefully disconnect wiring from ATO Pump (Figures 1 & 2).

4. Locate and remove splash guard

Fig 3

from bottom rear of system (Fig 3).

5. Disconnect ATO flex line from ATO check valve at the return manifold (Fig 4).

6. Remove check valve assembly from the oil manifold and plug (Fig 5).

Continued on the next page.

FRYMASTER DEAN 8700 LINE AVENUE, SHREVEPORT, LA 71106
318-865-1711 800-551-8633 WWW.FRYMASTER.COM EMAIL: FRYSERVICE@WELBILT.COM
Fig 2

Fig 4 Fig 5

8198020 06/2023

Page 1 of 4

Continued from page 1

7. Reinstall ATO box cover from step 3, then remove the wire shield cover from the rear of the box. (Fig 6)

8. Disconnect the ATO probe connections from the top row of the ATO board, This will be the 4 pin connections, and replace with resistor jumpers from the kit. Reinstall shield cover from step 7.

9. Remove the controller from the far

left control box. Using the wiring dia-

Fig 6

gram on the last page, feed the

1080490 harness through the rear of

the far left control box. Attach the

harness to T1 & T2 and allow the C2

connector to remain on rear. Attach

the other end of the connector from the heater strips to the C2 connector. Fig 7

10. Mount handy boxes in location shown on rear of contactor boxes above the power cords (Figure 7).\

11. Using one of the 36-inch heaters from the kit and a length of foil tape, add heater to bottom side of manifold, wrapping extra length around the ends and over the top securing in place with foil tape. (Figure 7).

Continued on the next page.
Fig 8
Fig 9

Page 2 of 4

Continued from page 2
12. Wrap all flex lines and filter pump using foil tape to retain tightly around oil line. While it may not be shown well in illustration, ALL check valves and return valve bodies must also be covered in heater strips (Figures 8 & 9).
13. Reinstall splash guard from (Figure 3).

Fig 10

Using Wago Connectors
Wago connectors allow stripped wires (3mm) to be cleanly connected. They are easy to use: 1. Life completely the orange lever. It will stay upright. 2. Insert stripped wires. 3. Close orange levers.

14. Remove JIB cradle and install factory shipping brace if available (Figure 10).
15. Route all wires toward handy boxes and cover wires in sleeving.
16. Use Wago terminal blocks to wire up heaters according to diagram.
17. When all heater tapes have been attached and connected, position the fryer near the hood, apply power and test to ensure the heater tapes are functioning.
18. Replace back on fryer.

Page 3 of 4

Page 4 of 4



References

Microsoft Publisher for Microsoft 365