Instruction Manual for bouncepad models including: BP-LINKIPAD10B Adjustable Tablet Kiosk Ergonomically Flex, BP-LINKIPAD10B, Adjustable Tablet Kiosk Ergonomically Flex, Tablet Kiosk Ergonomically Flex, Kiosk Ergonomically Flex, Ergonomically Flex, Flex

Bouncepad Link | Apple iPad 10th Gen 10.9 (2022) | Black | Exposed Front Camera and Home Button User manual (1.2 MB)

Bouncepad BP-LINKIPAD10B

Bouncepad Link | Apple iPad 7th, 8th & 9th Gen 10.2 (2020 - 2021) | Teal | Exposed Front Camera and Home Button User manual (1.2 MB)

Bouncepad BP-LINKIPAD789T

Bouncepad Link | Apple iPad 10th Gen 10.9 (2022) | White | Exposed Front Camera and Home Button User manual (1.2 MB)

Bouncepad BP-LINKIPAD10W

PDF preview unavailable. Download the PDF instead.

mmo 104992869 1668075896 8054 26957
LINK
Assembly Instructions
Tools Required to Fix From Above:
Pencil Drill + drill bits 16mm Hole Saw

Sheet Code: BP-IM-074_REV2
Release Date: 08/04/2022
Copyright 2022 Spotspot Ltd. (T/A Bouncepad) all rights reserved. Confidential, no part of this publication may be reproduced or transmitted in any form without the written permission of the copyright holder.

Link
In the Box

back screw cover

faceplate

1x tie

1x T10 Pin Torx Allen Key

6x M3 x 6mm Countersunk
Pin Torx Screws

4x No.8 Countersunk, Self tapping
Screw

Fixings Kit

1x Velcro Pad

4x Rawl Plugs

Fixings List
* Due to the modular nature of our product range you may receive additional fixings in the fixings kit

front screw cover

1

Remove Front and Back Screw Covers.

2 Remove Faceplate.

3 Remove Cable Lock.

TEXAS POE
GAF-Lightning-PD

REDPARK
Gigabit+PoE Adapter L6-NETPOE

BELKIN
Ethernet + Power

TEXAS POE
GAT-USBC-PD

4 Select your PoE device and note it's location in relation to the mounting slots

tie
Power-Over-Ethernet device (POE)

Locate PoE device here with Velcro

5 Insert the tie through the cable slots and then clasp over the POE device.

6 Specifically for Texas PoE GAT-USBPD use velcro pad for attachment

7 Feed the ethernet cable through the cable exit.

MOUNT FROM ABOVE
Optional (skip to step 8 for freestanding)
pencil

power drill

drill bit

Connect the ethernet cable to the
8 POE and secure the cable with the cable lock.

A1 Use a pencil to mark pilot hole locations.

A2 Use a drill bit suitable for your surface and make 4x pilot holes

No.8 Self tapping screw

16mm hole saw

If running a ethernet or USB cable
A3 through the surface use a hole saw in the cable exit position.

Secure the Link to the surface with 4x
A4 No.8 Self tapping screws. Rawl plugs are provided if required.

Connect the USB cable to the tablet,
9 then place inside the enclosure. Reattach the faceplate.

video-conferencing camera

TV / PC monitor

computer

Link

10 11 Use 6x M3 Screws to secure faceplate.

Reattach the front and back screw covers

Set up the video-conferencing
12 software and peripherals as per the provider's instructions.

kensington lock
For additional security, tether your
13 Link with a Kensington security cable. *Security cable not provided.


Adobe PDF Library 17.0 Adobe InDesign 18.0 (Windows)