Important Information
IMPORTANT: Retain for future reference. Read carefully.
[Tools Recommended]
Parts List
- A x1: Main frame side panel
- A1 x1: Main frame side panel
- A2 x1: Main frame side panel
- A3 x1: Main frame side panel
- B x1: Lower crossbar
- B1 x1: Lower crossbar
- C x2: Planter box side panel
- D x2: Planter box top slat
- D1 x1: Planter box top slat
- E x2: Lower support leg
- F x2: Main frame base support
- G x1: Middle support bar
- H x1: Folding worktop panel
- I x1: Folding worktop support
- J x1: Planter box base
Hardware List
- 1 x14 (+1 spare): M4*45 screws
- 2 x4 (+1 spare): M4*60 screws
- 3 x8 (+1 spare): M2.5*10 screws
- 4 x8 (+1 spare): M4*35 screws
- 5 x8 (+1 spare): Small screws
- 6 x10 (+1 spare): M4 screws
- 7 x1: Tool
Note: Do not confuse similar screws.
Assembly Instructions
Step 1: Assemble Base Frame
Attach parts A and A1 to part F using four (4) M4*45 screws (1) and two (2) small screws (5). Ensure the orientation matches the diagram.
Step 2: Continue Base Frame Assembly
Attach parts A3 and A2 to part F using four (4) M4*45 screws (1) and two (2) small screws (5). This completes the initial frame structure.
Step 3: Attach Lower Supports
Attach the lower support legs (E) to the frame. Use four (4) M4*35 screws (4) and four (4) small screws (5) for each leg (total 8x (4) and 8x (5) for both legs E).
Step 4: Attach Lower Crossbars
Attach the lower crossbars (B1) to the lower support legs (E) using four (4) M4*35 screws (4).
Step 5: Attach Main Frame Supports
Attach the main frame supports (E) to the structure using four (4) M4*45 screws (1) and four (4) M4*60 screws (2).
Step 6: Attach Middle Support
Attach the middle support bar (G) to the frame using four (4) M2.5*10 screws (3).
Step 7: Assemble Folding Worktop
Attach the folding worktop support (I) to the folding worktop panel (H) using four (4) M2.5*10 screws (3).
Step 8: Attach Folding Worktop Assembly
Attach the assembled worktop unit (H+I) to the main frame using two (2) M4*45 screws (1).
Step 9: Insert Planter Box Slats
Insert the planter box top slats (D and D1) into the planter box side panels (C).
Step 10: Attach Planter Box Base
Attach the planter box base (J) using ten (10) M4 screws (6). The diagram shows the base being secured from the bottom.
Step 11: Final Check
Ensure all screws are tightened and the unit is stable. The folding worktop can be deployed or retracted as needed.
Customer Support & Contact Information
For any questions or assistance, please contact the relevant customer care center:
United States (US)
Phone: 001-877-644-9366
Email: customerservice@aosom.com
Imported by: Aosom LLC, 27150 SW Kinsman Rd, Wilsonville, OR 97070 USA
Made in China
Canada (CA)
Phone: 416-792-6088
Email: customerservice@aosom.ca
Imported by: Aosom Canada Inc., 7270 Woodbine Avenue, Unit 307, Markham, Ontario Canada L3R 4B9
Made in China
France (FR)
Phone: 0033-1-84166106
Email: aosom@mhfrance.fr
Imported by: MH FRANCE, 2 Rue Maurice Hartmann, 92130 Issy Les Moulineaux, France
Fabriqué en Chine
Germany (DE)
Phone: 0049-0(40)-87408465
Email: service@aosom.de
Importer/Manufacturer/REP: MH Handel GmbH, Wendenstraße 309, D-20537 Hamburg, Germany
Hergestellt in China
Italy (IT)
Phone: 0039-0249471447
Email: clienti@aosom.it
Imported by/Manufacturer/REP: AOSOM Italy srl, Centro Direzionale Milanofiori, Strada 1 Palazzo F1, 20057 Assago (MI)
Fatto in Cina
Spain (ES)
Phone: 0034-931294512
Email: atencioncliente@aosom.es
Importer/Manufacturer/REP: SPANISH AOSOM, S.L., C/ROC GROS,N°15.08550, ELS HOSTALETS DE BALENYÀ, SPAIN.
Hecho en China
Portugal (PT)
Phone: 0034-931294512
Email: info@aosom.pt
Importer/Manufacturer/REP: SPANISH AOSOM, S.L., C.ROC GROS N. 15, 08550. ELS HOSTALETS DE BALENYÀ
Feito na China
United Kingdom (UK)
Phone: 0044-800-240-4004
Email: enquiries@mhstar.co.uk
Importer Address: MH STAR UK LTD, Unit 27, Perivale Park, Horsenden lane South, Perivale, UB6 7RH
Made in China
Recycling Information
♻️ Give your waste a new life. Dispose of waste responsibly.
Addresses on quefairedemesdechets.fr