User Manual for Telran models including: 490237 Hot Galvanized Steel Cable Management, 490237, Hot Galvanized Steel Cable Management, Steel Cable Management, Cable Management, Management

Hot Galvanized Steel Cable Management, Without rings, Accessories material: 304ss

Telran Communication(1986)ltd

1. Specification, User Manual

Hot Galvanized Steel Cable Management, Without rings, Accessories material: 304ss


File Info : application/pdf, 4 Pages, 1.27MB

PDF preview unavailable. Download the PDF instead.

490237 ENG DS 2024
p.n. 490237
Hot Galvanized Steel Cable Management, Without rings, Accessories material: 304ss
Description
This cable management is designed for ADSS fiber optic cable storage which is suitable for different application scenarios with high quality hot-dipped galvanized steel main body and 304ss accessories.
Dimensions
600mm(L)*454mm(W)

Page 1

19 Hayezira St. Industrial Zone Ramla 7255616

www.telran.co.il

|

office@telran.co.il

|

fax. 03-5214524

Technical support *2023

|

phone: 03-5575110

Standard Accessories
 Stand Column: 1pc  Cross Beam: 2pcs  Cable rings: 4pcs  304ss M6 bolts: 4pcs/304ss M6 nuts: 4pcs  304ss M8 bolts:2pcs/304ss M8 nuts:2pcs

Page 2

19 Hayezira St. Industrial Zone Ramla 7255616

www.telran.co.il

|

office@telran.co.il

|

fax. 03-5214524

Technical support *2023

|

phone: 03-5575110

Assembly Steps 1. How to assembly the cross beam and cable rings
1.1. Position alignment of cross-beam and cable rings Once the two M6 mounting holes are aligned, turn the cable ring to one of the appropriate
positions to insert the limit boss into the limit hole.
1.2. M6 bolts*nuts mounting to the cross-beam and cable rings Please ensure that the M6x14 bolts and M6 nut are installed correctly.
The nut should be placed on one side of the cross-beam, while the bolts should be installed inside the cable rings.

Page 3

19 Hayezira St. Industrial Zone Ramla 7255616

www.telran.co.il

|

office@telran.co.il

|

fax. 03-5214524

Technical support *2023

|

phone: 03-5575110

2. How to assembly the Cross beam and Stand Column 2.1. Clamp the stand column to the beam ensuring the 2 M8 screw holes are aligned as the following pic.

2.2. Please ensure that the M8 bolts and M8 nut are installed correctly. The M8 bolt cap should be placed on one side of the cross-beam, while the M8 nut should be
placed inside the stand column as the following pic.

PACKING INFORMATION

PCS/CARTON Gross Weight (Kg)

4

11.3

Net Weight (Kg) Carton Size (cm) Cbm (m³)

10.7

64*48*10

0.031

19 Hayezira St. Industrial Zone Ramla 7255616

www.telran.co.il

|

office@telran.co.il

|

fax. 03-5214524

Technical support *2023

|

phone: 03-5575110

Page 4



References

Adobe PDF Library 24.1.163