GoodWe ET Series Hybrid Inverter Quick Installation Guide

Brand: GoodWe

Document Version: 1.0 (2020-09-24)

Part 1: Quick Installation

This section covers the initial steps for installing the GoodWe ET Series hybrid inverter.

Step 1: Instructions for Quick Installation

A. Installation Space

Ensure adequate clearance around the inverter for ventilation and maintenance:

[Diagram showing installation space clearances]

B. Dimensions for Drilling Holes

Details for drilling mounting holes on the wall:

[Diagram showing dimensions for drilling holes on a wall]

C. Attach the Wall Bracket

Secure the wall bracket to the wall using self-tapping screws and expansion pipes.

[Diagram showing wall bracket attachment with screws and expansion pipes]

D. Installation

Connect the ground cable to the ground plate on the grid side. The inverter can be locked for anti-theft purposes if needed.

[Diagram illustrating ground cable connection and optional locking mechanism]

F. PV Wire Assembly and Connection

Prepare PV wires (2.5-4mm²) for connection. Ensure a crimping length of 7mm. Compatible with MC4 Series and AMPHENOL Series connectors.

[Diagram showing PV wire preparation, crimping, and connector types]

E. Battery Wire Assembly and Connection

Specifications for battery wire assembly:

GradeDescriptionValue
AOutside diameter insulation5.5-8.0 mm
BConductor core section4-6 mm²
CConductor core length15 mm

Connect the battery wires, ensuring proper torque (2 Nm) for connections.

[Diagram showing battery wire assembly and connection steps]

G. AC Cable Assembly and Connection

Specifications for AC cable assembly:

GradeDescriptionValue
AOutside diameter13-18 mm
BSeparated wire length20-25 mm
CConductor wire length7-9 mm
DConductor core section4-6 mm²

Note: Ensure cables (L/N/PE) are connected to the correct locations.

[Diagram showing AC cable assembly and connection, including L/N/PE]

H. Communications Cable Connections

Connect communication cables to the Smart Meter and Battery. The Smart Meter cable can be extended up to 100m.

Connections:

CT Connections (for Power Meter/Smart Meter):

[Diagram illustrating communication and CT cable connections to Grid, Smart Meter, and Battery]

I. DRED Cable Assembly

DRED (Demand Response) connection is available for Australia and New Zealand. It involves connecting specific function pins (DRM1/5, DRM2/6, etc.) using screws, nuts, insulators, and a communication board.

[Diagram showing DRED cable assembly and pin functions]

J. Remote Shutdown Cable Assembly

Remote shutdown connection is available for Europe. Similar assembly to DRED, using screws, nuts, insulators, and a communication board.

[Diagram showing remote shutdown cable assembly]

K. Wiring System for ET Series Hybrid Inverter

This diagram illustrates the wiring structure for ET-series AC-coupled inverters. It shows connections for PV Strings, Battery, Loads (1-Phase and 3-Phase), Inverter, DC Breaker, AC Breakers, Smart Meter, and Power Meter.

Breaker Specifications:

Inverter ModelDC BreakerAC Breaker
GW5KL/6KL-ET40A/600V25A/400V
GW8KL/10KL-ET32A/400V32A/400V
GW5K5/6K5-ET25A/400V25A/400V
GW8K/10K-ET32A/400V32A/400V

Important Notes:

[Diagram showing the overall wiring system for the ET series hybrid inverter, including breaker specifications and CT connection notes]

Part 2: SOP of Battery Connection to the Hybrid Inverter

This section details the connection methods between GoodWe hybrid inverters and specific battery models (e.g., BYD-Box Premium HVM/HVS). Refer to the respective user manuals for detailed operations and commissioning.

Precautions

Step 1: Power Cable Wiring

Route the battery power cable (4-6mm²) through the battery cover plate and connect it to the appropriate port. Connect the other end to the inverter using the provided battery connectors.

[Diagram showing battery power cable routing and connection to the inverter]

Step 2: Communication Cable Wiring

This involves preparing and connecting the communication cable (e.g., CAT-5) between the battery and the inverter.

BMS Communication Connector Pin Functions on Inverter Side:

PositionColorBMS Function
1Orange & White485_A2
2OrangeNC
3Green & White485_B2
4BlueCAN_H
5Blue & WhiteCAN_L
6GreenNC
7Brown & WhiteNC
8BrownNC

After connecting power and communication cables, replace the cover plate. The battery is then ready for startup.

[Diagram showing communication cable preparation, pin connections, and BMS connector pinout]

Step 3: Commissioning

Commissioning is required for both the battery and the inverter.

Battery Commissioning

Use the "Be Connect App" for battery commissioning. Follow the BYD Battery-Box Premium Firmware update & Configuration Guideline for details. The app is available for iOS and Android.

Steps:

[Screenshots or descriptions of the Be Connect App interface for inverter and battery selection]

Inverter Commissioning

For detailed inverter commissioning, refer to the GoodWe PV Master User Manual. Incorrect commissioning can lead to BMS communication failure.

Battery Paralleling

For detailed instructions on battery paralleling, refer to BYD instructions. This includes system wiring diagrams and internal communication wiring for paralleling multiple Battery Control Units (BCUs).

[Diagrams showing system wiring and internal communication wiring for paralleling 2 or 3 BCUs]

Part 3: Wi-Fi Configuration Instruction

This section guides you through connecting the inverter to your Wi-Fi network.

Step 3. Wi-Fi Configuration Instruction

A. Preparation

  1. Power on the inverter or EzLogger Pro (Wi-Fi version).
  2. Power on your Wireless Router.
  3. Connect your smart device (phone/tablet) to the inverter's Wi-Fi network.

B. Connect to "Solar-WiFi"

  1. Connect your smart device to the Wi-Fi network named "Solar-WiFi" or "Solar-WiFi*" (where * represents the last eight digits of the inverter's SN). The default password is "12345678".
  2. Visit the website http://10.10.100.253 in your smart device's browser.
  3. Enter the username "admin" and password "admin", then click "OK".

Tip: Refresh the page if you encounter an "Unauthorization Login" error.

[Description of connecting to Solar-WiFi and logging into the configuration interface]

C. Preparation (Setup Wizard)

Click "Start Setup" to launch the Wi-Fi setup wizard.

The wizard will guide you to select your current wireless network (Router SSID), enter the password, and configure other Wi-Fi parameters.

Key Information Displayed:

Tip: The Wi-Fi module specification is available on the device information page.

Note: A "cannot join the network error" may occur if the router is not found, the signal is too weak, or the password is incorrect.

Selecting a Wi-Fi Network:

The interface lists available Wi-Fi networks with their SSID, Authentication/Encryption, RSSI (signal strength), and Channel. Select your network and click "Next".

Tip: If the RSSI is below 15%, the connection may be unstable. Choose a stronger signal or move closer to the router. If your router does not broadcast its SSID, click "Next" to add it manually.

[Description of the setup wizard interface, network selection, and manual network addition]

D. Connect to "Solar-Wi-Fi" (Final Configuration)

Enter your wireless router's password and click "Next". Ensure all parameters match your router's settings, including case sensitivity for SSID and password.

You can also manually add a wireless network by entering its name (SSID), encryption method, and algorithm.

Tip: Ensure there are no unacceptable characters in the password to avoid configuration failure.

Click "Complete" to save the settings. The configuration takes effect after the device restarts.

[Description of entering router password, manual network addition, and completing the configuration]

E. Troubleshooting

This table provides solutions for common Wi-Fi configuration issues:

No.ProblemTroubleshooting
1Unable to find Solar-WiFi or Solar-Wi-Fi*1. Check inverter power and Wi-Fi module attachment. 2. Ensure smart device is close to the inverter. 3. Restart inverter. 4. Press "Wi-Fi Reload" button and retry configuration.
2Unable to connect to Solar-WiFi or Solar-Wi-Fi*1. Try default password: 12345678. 2. Check if other devices are connected. 3. Press "Wi-Fi Reload" and retry. 4. Restart inverter and retry. 5. Check for invalid characters in the password.
3Unable to login website 10.10.100.2531. Press "Wi-Fi Reload" and retry. 2. Try alternative browsers (Chrome, Firefox, IE, Safari).
4Unable to find router SSID1. Move router closer or use a Wi-Fi repeater. 2. Ensure router channel is 13 or lower; adjust if necessary.
5Wi-Fi LED indicator blinks twice1. Restart inverter. 2. Verify SSID, encryption, and password match router settings. 3. Check router's device connection limit. 4. Restart router. 5. Improve Wi-Fi signal strength.
6Wi-Fi LED indicator blinks four times1. Connect smart device to non-inverter Wi-Fi and check SEMS Portal for inverter status. 2. Restart router and inverter.
7Offline status on SEMS Portal (Wi-Fi LED always on)1. Wait a few minutes for data transmission and check SEMS Portal again.
Models: ET Series, 3 Phase High Voltage Energy Storage Inverter

File Info : application/pdf, 6 Pages, 1.67MB

PDF preview unavailable. Download the PDF instead.

GW ET Quick Installation V1.0-EN Adobe PDF library 15.00 Adobe Illustrator CC 2017 (Windows)

Related Documents

Preview GoodWe ES Series Hybrid Inverter Quick Installation Guide
Comprehensive quick installation guide for GoodWe ES series hybrid inverters, covering rapid setup, battery connection for BYD, GCL, LG, Pylon, Dyness, Alpha batteries, and Wi-Fi configuration. Learn to install and optimize your solar energy system.
Preview GoodWe ET Series Hybrid Inverter User Manual
This user manual provides detailed instructions for the installation, operation, and maintenance of the GoodWe ET Series Hybrid Inverter. It covers safety precautions, system configurations, troubleshooting, and technical specifications.
Preview GoodWe EM Series Hybrid Inverter Quick Installation Guide
A comprehensive quick installation guide for GoodWe EM series hybrid inverters, covering physical installation, DC and AC wiring, and detailed battery connection procedures for BYD, GCL, LG, Pylon, Dyness, and Alpha batteries. Includes Wi-Fi configuration and troubleshooting.
Preview GoodWe PV Master App Manual: Monitoring and Configuration Guide
A comprehensive guide to using the GoodWe PV Master application for monitoring, configuring, and managing GoodWe inverters. Covers installation, basic and advanced settings, system status checks, auto-testing, Wi-Fi module setup, account registration, and remote operations for both Android and iOS devices.
Preview GoodWe SBP Series User Manual: AC-Coupled Battery Storage Retrofit
Comprehensive user manual for the GoodWe SBP Series AC-Coupled Battery Storage Retrofit inverter, covering installation, operation, safety warnings, troubleshooting, and technical specifications.
Preview GoodWe ES Series Hybrid Inverter User Manual
This user manual provides detailed instructions for the installation, operation, and maintenance of the GoodWe ES Series Hybrid Inverter. It covers safety precautions, system modes, electrical connections, troubleshooting, and technical specifications.
Preview GoodWe ET 5.0-10.0kW Residential Smart Inverter Solutions Guide
A comprehensive guide to GoodWe's ET 5.0-10.0kW Residential Smart Inverter Solutions, covering networking, power on/off procedures, installation, wiring diagrams, and equipment commissioning.
Preview GoodWe Communication Module Quick Installation Guide
This guide provides step-by-step instructions for installing and commissioning GoodWe communication modules, including the Wi-Fi/LAN Kit, WiFi Kit, and WiFi Box, for solar inverters. It covers network setup, power-on procedures, troubleshooting, and technical specifications.