2025 Running Boards R1S Installation Manual

Need Help? Contact Us!

? Call us at +1 (949) 358 4793 (Mon-Fri: 9 AM - 6:30 PM PST) if you have any questions.

✉️ Email: service@evbase.com

? SMS: +1 (657) 966-8047

? evbase.com

Read me first

  1. Read this document before using the product.
  2. The installation instructions may be slightly different from the actual operation. If there is any difference, please contact us or according to the actual situation.
  3. Contact Evbase Customer Support for any repairs at: Email: service@evbase.com, Call: +1 (949) 358 4793 or SMS: +1 (657) 966-8047.

Warnings and Disclaimers

Warning: All notes and disclaimers must be read prior to installation. Failure to do so can lead to improper installation, resulting in damage or injury.

Important notice: You are welcome to purchase our company's products. In order to protect the legitimate rights and interests of users, we hereby remind users that you must carefully read and fully understand the terms of this statement before using this product. If you use this product, your use will be deemed to be an acknowledgment of the entire content of this statement, and you agree to be bound by the following terms of this statement, and at the same time bear the consequences caused by irregular use. Our company reserves the right to update the above documents. Please be sure to operate this product according to the instructions.

Package Included:

Part Number Description Quantity
Running board 2
Bracket 6
One-piece bolt 6
Nut 12
Washer and spring washer 24
Installation tools 1 set

Driver Side Installation

Diagram Description: The diagram shows the driver's side of the vehicle chassis, indicating the front and rear. Three mounting brackets, labeled 'Bracket 2', are positioned along the chassis for installation.

Step 1: Remove the original screws in the indicated red circles on the vehicle chassis. Then, fix the bracket using the original screws.

Passenger Side Installation

Diagram Description: The diagram shows the passenger's side of the vehicle chassis, indicating the front and rear. Three mounting brackets, labeled 'Bracket 2', are positioned along the chassis for installation.

Step 2: Remove the original screws in the indicated red circles on the vehicle chassis. Then, fix the bracket using the original screws.

Installation Step

Step 3: Fix the running board and bracket together using the provided hardware: ④ one-piece bolt, ⑥ nut, and ⑤ washer and spring washer, following the visual guide.

Diagram Description: A close-up illustration shows how to attach the running board to the bracket. A one-piece bolt is inserted through the bracket and the running board, secured with a washer, a spring washer, and a nut.

Warranty and Support

Need Help? Contact Us!

If you have any questions, please contact us at:

? +1 (949) 358 4793 (Mon-Fri: 9 AM - 6:30 PM PST)

✉️ service@evbase.com

? +1 (657) 966-8047

? evbase.com

Before contacting our Customer Support, please have your order number, videos, or images (if needed) ready for a fast and great solution. Send your customer number to get Evbase's one-year extended warranty.

Models: RN171, 2025, RN171 Rivian Running Boards, RN171, Rivian Running Boards, Running Boards, Boards

File Info : application/pdf, 7 Pages, 1.54MB

PDF preview unavailable. Download the PDF instead.

RN171 2025 Running Boards R1S Installation Manual (All②brackets)

References

WPS 演示 4-Heights™ PDF Library 3.4.0.6904 (http://www -tools.com)