FusionSolar App Quick Guide

Issue: 09

Date: 2023-12-22

FusionSolar App Quick Settings Operation Procedure

  1. Download and install the FusionSolar app
  2. Register an installer account (optional, for installers without an account)
  3. Log in and start Setup wizard
  4. Create an owner account
  5. Check the device status

This document applies to the following scenarios:

Copyright © Huawei Digital Power Technologies Co., Ltd. 2023. All rights reserved.

Note:

1. Downloading and Installing the FusionSolar App

Method 1: Download and install the app from the app store.

Users who select method 2 can select the download method based on the mobile phone type:

Method 2: Scan the QR code to download and install the app.

Note: When you select Download via the Browser, if a security warning message is displayed indicating that the app is from an external source, tap ALLOW.

2. Register an Installer Account (Optional, for Installers Without an Account)

Register the first installer account and create a company account.

Note: To create multiple installer accounts for the same company, log in to the Fusion Solar app to Add User or Invite User.

Both the email address and username can be used to log in to FusionSolar app.

In some regions, the function of inviting users is not supported. The actual page prevails.

3. Log in and Start Setup Wizard

WLAN/FE SDongle+Built-in WLAN of the Inverter

Scan the QR code of the inverter connected to the Huawei SmartPVMS. If there is no QR code, tap "Enter SN".

Log in to the app as an installer. The initial password of the installer is 00000a. If the system prompts you to set a password, set the password and login. First power-on and change it immediately after login.

At the first login, the Quick settings screen is displayed by default.

In a non-cascading scenario, the step of Searching for cascaded inverters is not involved.

The grid code is set to N/A by default (automatic startup is not supported). Set the grid code based on the area where the PV plant is located.

If Sync phone time is enabled, the time and time zone of the inverter are synchronized with those of the mobile phone.

Check whether the detected devices are consistent with the actual connected devices.

Cascaded inverters

Networking mode

Searching for cascaded inverters

SDongleA-05+Distributed inverter/SDongleB-06+Commercial inverter (without WLAN module)

In the MBUS cascading scenario, use the USB-WLAN module to connect to the inverter, and then log in to the commissioning page of the inverter to set the parallel parameter.

Remove the USB-WLAN module, install the SDongleB-06.

Log in to the app as an installer. If the system prompts you to set a password, set the password and login first power-on and change it immediately after login.

At the first login, the Quick settings screen is displayed by default.

Local Commissioning Using a Smart USB-WLAN Adapter

Note: Before commissioning a commercial inverter, connect the 4G Smart Dongle to identify parameters. If the indicator status is normal, remove the Smart Dongle, and then connect the USB-WLAN adapter to start commissioning.

Check the indicator status. When the indicator blinks green at an interval of 2s (on for 0.1s and then off for 1.9s), remove the 4G Smart Dongle.

Scan the device QR code to connect the device to the Huawei SmartPVMS. If there is no QR code, tap "Enter SN".

The initial password is 00000a.

At the first login, the Quick settings screen is displayed by default.

The grid code is set to N/A by default (automatic startup is not supported). Set the grid code based on the area where the PV plant is located.

If Sync phone time is enabled, the time and time zone of the inverter are synchronized with those of the mobile phone.

Local Commissioning Using the SmartLogger of the Inverter

Scan the device QR code to connect the device to the Huawei SmartPVMS. If there is no QR code, tap "Enter SN".

Log in to the app as an installer. The initial password is 00000a.

Ensure that the devices are consistent with the actual connected devices.

The grid code is set to N/A by default (automatic startup is not supported). Set the grid code based on the area where the PV plant is located.

Select the ESS Installation Environment and working mode settings of the battery.

Monitor the PV plant through the management system. Set the Domain name to intl.fusionsolar.huawei.com and Port number to 27250.

When the SmartLogger connects to the SmartPVMS over the wireless network, set Mobile network parameters and Network mode.

When the SmartLogger connects to the SmartPVMS over a wired network, set Wired network parameters.

4. Create an owner account

Note: In some regions, the function of inviting users is not supported. The actual page prevails.

After receiving the invitation, the user accesses the registration page to register an account.

5. Checking the Device Status

Checking the Device Status Using Device Commissioning

Note:

FAQ. Physical Layout Design (With Optimizers)

  1. The physical layout must be configured for optimizers. When an optimizer is faulty, it can be quickly located and replaced based on the physical layout.
  2. The optimizer disconnection detection is available only after the physical layout is complete. Perform optimizer disconnection detection and view the result on the Optimizer layout screen.

Step 1: After determining the installation position of an optimizer, remove the SN label from the optimizer and attach it to the physical layout template.

Step 2: Take a photo of the template with the QR code attached. Positioning point for photographing.

Note: Ensure that the four positioning points on the template are within the frame.

FAQ. Physical Layout Design

Tap a plant that is equipped with optimizers.

Tap Physical layout.

Set optimizer parameters.

Tap to upload the physical layout template.

Tap to add a physical layout template.

Take a photo of the template with the QR code attached, or select the photo from your phone album.

Note: For some unidentified QR codes, manually bind them.

Hold and drag to adjust the sequence.

To create other layouts, log in to the SmartPVMS.

The existing physical layout will be overwritten by a new one. Are you sure you want to generate a new layout?

Indicators on the Smart Dongle

LED Color Status Remarks Description
N/A Off Normal The Dongle is not secured or is not powered on.
Yellow (blinking green and red simultaneously) Steady on Normal The Dongle is secured and powered on.
Blinking in a 2-second cycle (on for 0.1s and then off for 1.9s) Normal Dialing (duration < 1 min)
Green Blinking at long intervals (on for 1s and then off for 1s) Normal The dial-up connection is set up successfully (duration < 30s).
Steady on Normal Successfully connected to the management system.
Red Blinking at short intervals (on for 0.2s and then off for 0.2s) Normal The inverter is communicating with the management system through the Dongle.
Blinking red and green alternatively Steady on Normal The Dongle is faulty. Replace Dongle.
Blinking at short intervals (on for 0.2s and then off for 0.2s) Abnormal The Dongle has no SIM card or the SIM card is in poor contact. Check whether the SIM card has been installed or is in good contact. If not, install the SIM card or remove and insert the SIM card.
Blinking at long intervals (on for 1s and then off for 1s) Abnormal The Dongle fails to connect to the management system because it has no signals, weak signal, or no traffic. If the Dongle is reliably connected, check the SIM card signal through the APP. If no signal is received or the signal strength is weak, contact the carrier. Check whether the tariff and traffic of the SIM card are normal. If not, recharge the SIM card or buy traffic.
Blinking at long intervals (red for 1s and green for 1s) Abnormal No communication with the inverter. Remove and insert the Dongle. Check whether inverters match the Dongle. Connect the Dongle to other inverters. Check whether the Dongle or the USB port of the inverter is faulty.
Blinking at short intervals (red for 0.2s and green for 0.2s) Normal The Dongle is being upgraded locally.
Models: Fusion Solar App, Solar App, App

File Info : application/pdf, 18 Pages, 1.90MB

PDF preview unavailable. Download the PDF instead.

FusionSolar-App-Quick-Guide

References

Microsoft PowerPoint 2013 Microsoft PowerPoint 2013

Related Documents

Preview FusionSolar App Quick Guide
A comprehensive guide to downloading, installing, and using the FusionSolar App for managing solar power systems, including inverter setup, account creation, and device status checking.
Preview FusionSolar App and SUN2000 App User Manual
Comprehensive guide to Huawei's FusionSolar and SUN2000 apps for PV plant owners and installers, covering app installation, account management, device commissioning, monitoring, and operation & maintenance (O&M) procedures.
Preview Huawei FusionSolar App User Manual - Installation, Operation, and Maintenance Guide
Comprehensive user manual for the Huawei FusionSolar App, detailing installation, device commissioning, plant management, monitoring, and O&M for solar PV systems, chargers, and ESS, catering to both installers and system owners.
Preview Huawei SUN2000 Inverter and Networking Devices Installation and Troubleshooting Guide
Comprehensive guide to installing and troubleshooting Huawei SUN2000 series solar inverters, Smart Dongles, SmartLoggers, and DTSU666-H smart power sensors. Includes video links, document references, and technical specifications.
Preview Huawei MERC-(1300W, 1100W)-P Smart PV Optimizer Quick Guide
This quick guide provides essential information for installing and operating the Huawei MERC-(1300W, 1100W)-P Smart PV Optimizer, including product overview, installation requirements, cable connections, commissioning, troubleshooting, and safety precautions.
Preview Huawei FusionSolar SmartLogger 1000/1000A Remote Management System Implementation Guide
This guide provides step-by-step instructions for implementing the Huawei FusionSolar remote management system using SmartLogger 1000 and SmartLogger 1000A. It covers initial setup, firmware updates, SIM card configuration, system settings, account creation, and power station registration and viewing.
Preview Huawei SUN2000-(600W-P, 450W-P2) Smart PV Optimizer Quick Guide
Quick guide for installing, commissioning, and troubleshooting Huawei SUN2000-(600W-P, 450W-P2) Smart PV Optimizers. Learn about product overview, installation requirements, cable connections, and common fault scenarios.
Preview Huawei SDongleA-03 4G Smart Dongle Quick Guide for Inverter Communication
This quick guide provides comprehensive instructions for installing, commissioning, and troubleshooting the Huawei SDongleA-03 4G Smart Dongle, an expansion module enabling wireless communication between Huawei inverters and management systems via 4G network for residential and commercial PV plants.