Installation Guide for ENTTEC models including: 8PXA60-RGB-12V-B, 8PXA60 RGB 12V LED Pixel Strip, RGB 12V LED Pixel Strip, LED Pixel Strip, Pixel Strip
12V RGB LED pixel strip | ENTTEC : ENTTEC
File Info : application/pdf, 1 Pages, 252.02KB
DocumentDocument8PXA60-RGB-12V-B Visit the ENTTEC website for the latest version. 8PXA60-RGB-12V-B Installation Guide IMPORTANT: FOLLOW THE INSTRUCTIONS AND RECOMMENDATIONS BELOW TO AVOID POOR PRODUCT PERFORMANCE OR FAILURE. Maximum Run Length Colour and lumen output will be affected if maximum length is exceeded. Test conducted at maximum brightness using 12-volt driver. Note: Maximum length of pixel strip run is limited by maximum universes of data. POWER INJECTION SINGLE DUAL LED PER METRE 60 60 MAXIMUM LENGTH RED, GREEN, BLUE 10m 16m ALL ON 7m 14m Cutting Only cut along the lines marked on the strip. +12V DO BO GND +12V DI BI GND +12V DO BO GND +12V DI BI GND +12V DO BO GND +12V DI BI GND +12V DO BO GND +12V DI BI GND Wiring Diagram 12V 12V +12V DATA DI BACKUP BI GND GND DATA JOIN +12V DO BO GND +12V DI BI GND +12V DO BO GND GND DO: DATA OUT / DI: DATA IN Colour Consistency To achieve optimal colour consistency across multiple strips, we recommend using those from the same manufacturing batch together wherever possible. Please check your batch numbers - these can be found on the product label. Adhesive Application The strip will not adhere to textured or low surface energy materials. The best surface for long lasting adhesion is clean raw metal. Clean substrate with alcohol and a clean cloth. Peel off protective backing to reveal adhesive. Apply pressure when adhesive fixing to substrate. Thermal Management These strips produce heat. Thermal management must be considered. The more LEDs per metre, the more heat. ENTTEC recommends using an aluminium profile to manage heat. Each application is different. ENTTEC recommends testing a section of strip in its finished environment to ensure the thermal management is satisfactory. Select the most suitable option from below. Solder or crimp is recommended to combine multiple wires. If wire colours vary and you are unsure, please contact ENTTEC or your supplier for further advice. SINGLE POWER INJECTION The middle wire will always be data. PSU DATA JOIN WITH MULTIPLE SINGLE POWER INJECTIONS PSU 12V (1) GND 12V DATA BACKUP GND PSU 12V (2) GND VOLTAGE: 12V WATTS: (STRIP LENGTH IN METRES) X (WATTS PER METRE) STRIP (1) STRIP (2) DATA JOIN DO NOT CONNECT 12V(1) TO 12V(2) 12V GND 12V DATA BACKU P GND DUAL POWER INJECTION PSU 12V GND 12V DATA BACKU P GND Voltage Drop Testing Use multimeter to test for voltage drop test where power is injected. If problems occur also meter the end of the strip. Push probes through protective silicone to make contact. ID: 5954002 Due to constant innovation, information within this document is subject to change.