Installation Guide for GivEnergy models including: Giv-Bat-9-5-Gen-3, GIV-BAT-9.5-G3, GIV-BAT-9.5-G3 9.5kWh Li-Ion Battery, GIV-BAT-9.5-G3, 9.5kWh Li-Ion Battery, Li-Ion Battery, Battery

GivEnergy 9.5kWh Li-Ion Battery - Gen 3 - Solar Trade Sales

BATTERY INSTALLATION MANUAL

GivEnergy 9.5kWh Installation Manual

Lowest Prices - GivEnergy 9.5kWh Gen 3 Solar Battery Storage – ITS Technologies


File Info : application/pdf, 12 Pages, 1.09MB

PDF preview unavailable. Download the PDF instead.

Giv-Bat 9.5 Gen 3 Battery Installation Manual UK ?v=1731497898
V1 OCT 2024
LITHIUM IRON PHOSPHATE LiFePO4
BATTERY INSTALLATION MANUAL
GENERATION 3 Giv-Bat 9.5
GIV-BAT-9.5-G3

GIV-BAT 9.5 | GEN 3

SPECIFICATIONS

Specifications V.1.0 | 2024

BIGGER AND BETTER
Our third-generation battery is here
The third generation of the GivEnergy 9.5kWh battery brings all the substantial benefits of its predecessor ­ but in an offering made smaller and lighter.
The 9.kWh product is one of our most popular choices for medium-large properties. With its significant capacity and 12 year warranty covering unlimited cycles, the Giv-Bat 9.5 offers an incredibly competitive cost / kWh.
Meanwhile, from an installation perspective, the product is a breeze to work with. Push-fit connections and inbuilt DCMCB allow for fast, easy installations.
Ultimately, this high-performance, high-security, and high-powered LiFePO4 battery is a prime choice to achieve your energy independence.

Dimensions 576H X 225D x 480W (mm)
Weight 85±2Kg
Usable capacity 9.5 kWh / 186 Ah
Nominal voltage 51.2V DC
Current <120A
SKU GIV-BAT-9.5-G3
Impact protection rating IK10

Warranty 12 years
Charging temperature 0°C - 50°C
Discharging Temperature -10°C - 50°C
Voltage range 4 4 . 8 -57.6 V
Depth of Discharge 100%
Country of manufacture China

Item A B C D E F

BOX CONTENTS

Item Name

Qty

Battery Module

Battery Module

1

Wall Mounting Bracket

Wall Mounting Bracket

1

User manual

Documentation

1

Expansion bolts

Fixing

4

Ground screw

Fixing

1

Security screw

Fixing

2

A

D

E
F B

C

GENERAL INFORMATION
Introduction All information contained in this booklet refers to the assembly, installation, commissioning, and maintenance of the Generation 3 battery. Please retain this manual for future reference. Legal Disclaimer: This document is the property of GivEnergy, reproduction is prohibited.
Installation Requirements Installation of all GivEnergy equipment must be carried out by a GivEnergy approved installer.
Unit Information The Generation 3 batteries are designed to work with a GivEnergy AC Coupled or Hybrid Inverter. The batteries work with renewable generation or import from the grid at off-peak times when prices are lower, and discharge during busier periods when prices are more expensive.
Storing the Battery The units must be stored in their original packaging at temperatures between -20ºC - 50ºC. Please note that between -10ºC - 0ºC there may be reduced performance in charging and discharging. Do not stack more than 4 units on top of each other. Stock batteries need to be replenished and maintained every five months. If the battery is stored in the warehouse for more than 6 months, the battery may need to be replenished before delivery.
Packaging Contents When unpacking, please check the following:
There are no missing accessories from the packaging list
The model and specification of the battery's nameplate match the order specifications If any damaged or missing parts are found, please contact GivEnergy on 01377 252 874 or email support@givenergy.co.uk immediately. Returns must be provided in original or equivalent packaging. The cardboard packaging is recyclable.
V.1.0 | 2024

COMPONENTS

Item
A B C D E F

Item Name

Function

DC MCB Breaker ON/OFF Switch STATUS Earthing Point Connection ports Dip Switches

Provides overcurrent protection and a form of isolation for the battery Switch on/off on the BMS Shows you the state of charge and status of the battery Earth Bonding Power and comms connection to the inverter and other batteries Address the ID when using multiple batteries

B

A

C

A

D E

F DC MCB / dip switches

BATTERY CABLES
Two types of cables exist for connection to Gen 3 batteries; Lug to plug battery cable When connecting a Gen 3 battery to a Gen 1 battery, or a Gen 3 battery to a Gen 1/2 inverter. Plug to plug battery cable When connecting a Gen 3 battery to a Gen 2/3 battery, or a Gen 3 battery to a Gen 3 inverter. IMPORTANT All Generation 3 battery cables need to be purchased separately.
V.1.0 | 2024

SAFETY AND INSTALLATION
Safety Instructions Extra care and attention must be taken when installing and maintaining any GivEnergy equipment. The system is capable of lethal voltages, even when disconnected
If you suspect something is wrong with the battery, contact GivEnergy on 01377 252 874 or email support@givenergy.co.uk. If any damaged or missing parts are found, please contact GivEnergy on 01377 252 874 or email support@givenergy.co.uk immediately. Returns must be provided in original or equivalent packaging. The cardboard packaging is recyclable.
Installation Instructions All electrical installations must be carried out by a qualified and registered electrician and in accordance with the local Wiring Regulations and other relevant safety legislation Ensure batteries are always fixed to the wall using the mounting bracket, even when the weight of the product is on the floor All GivEnergy equipment must be installed by a GivEnergy approved installer Externally mounted batteries must always be wall mounted above the frost-line or a minimum of 50mm An earth bond must be installed between all batteries and inverters Do not remove the front cover unless instructed by the GivEnergy support team The ambient temperature for the installation of the battery system should be above - 10°C, below 50°C , and the humidity should be between 5% and 95% Install in a well ventilated area. For outdoor installations a canopy is recommended, but not required to be installed above the battery
Do not use the battery if there are any deformities, such as bulging or leakages
Do not puncture the battery
Do not throw the battery or use forceful impact
Do not attempt to repair the battery yourself (please call your Approved Installer)
The battery must be installed vertically, never install horizontally, avoid tilting the unit

STEP-BY-STEP INSTALLATION

Below is a list of the tools and equipment required to install the Gen 3 Giv-Bat 9.5:

Drill bits Screw driver Socket set Pencil

Tape measure Multimeter Spirit level Insulated gloves

Safety goggles Safety shoes Hammer Torx bits

1. Place the wall mounting bracket horizontally onto the wall and mark the position of the bracket holes.
Ensure the wall is suitable to hold the weight of the battery.

3. Mount the battery onto the mounting bracket.

250mm

250mm

250mm

2. Drill 4 holes at the marked positions ensuring they are the sufficient depth for the fixings. Fix the
mounting bracket to the wall using 4 expansion bolts.

4. Place the battery against the wall and ensure it is above the wall mounted bracket. Slide the battery
down and hang it on the bracket. Lock the safety screws on both sides of the battery.

V.1.0 | 2024

STEP-BY-STEP INSTALLATION
For Generation 1 Inverters only
4A. Connect battery output to the inverter using a lug to plug cable. If not connecting to additional
battery packs, apply the blanking plug to the unused socket.

For Generation 3 Inverters only
4C. If connecting to Generation 3 inverter, use a plug to plug cable from battery output of the Generation
3 battery to the connectors within the Generation 3 inverter.

For Generation 2 Inverters only
4B. Connect battery output to the inverter using a lug to plug cable. If not connecting to additional
battery packs, apply the blanking plug to the unused socket.

For installing additional batteries
4D. If connecting a G1/2 battery to an existing G3 battery. Connect the Plug to Lug cable from the G3
battery connector to the G1/2 battery terminals. Ensuring BMS communications cable has correct polarity. Ensure the G3 battery DIPs are set for Master and the G1/2 battery are set for Slave. A DC Isolator will be required to protect the slave battery(s). All batteries must be on compatible firmwares.

V.1.0 | 2024

STEP-BY-STEP INSTALLATION
4E. If connecting a Generation 2/3 battery to a Generation 2/3 battery use a plug to plug cable and
connect from battery socket in your master battery into your slave Generation 2 battery, and set your dip switches as per step 5 (below). Ensure all unused sockets are covered with a blanking plug.

5. Set up the dipswitches on the circuit breaker, as shown overleaf.

SWITCH 4 - Master / Slave Dip Switch SWITCH 3 - Address Dip Switch SWITCH 2 - Address Dip Switch SWITCH 1 - Address Dip Switch

6. Push the `On/Off' button on the right hand
side of the battery, the LEDs will light up.

7. Commission the battery on the online portal and
ensure the battery is operating normally.

V.1.0 | 2024

Master

Dip switch

ID

name

SW4

Description v v v v v

SW3

v v ^ ^

SW2

^ ^ v v

SW1

v v v v

Slave 2

Dip switch

ID

name

SW4

Description v v v v v

SW3

v v ^^

SW2

v v ^ ^

SW1

v ^ v v

Slave 4

Dip switch

ID

name

SW4

Description v v v v v

SW3

v v ^ ^

SW2

v v ^ ^

SW1

v v v ^

RS485 DIP SWITCH SETTINGS

Slave 1

Dip switch

ID

name

SW4

Description v v v v v

SW3

v v ^ ^

SW2

v v ^ ^

SW1

^ v v v

Slave 3

Dip switch

ID

name

SW4

Description v v v v v

SW3

v v ^ ^

SW2

v v ^ ^

SW1

v v ^ v

POWER ON AND OFF THE BATTERY SYSTEM

If any abnormalities are found during the process of powering on the battery, please immediately turn off the battery power. After solving the problem, turn on the battery again
Make sure the inverter is turned off before checking the battery

Power on
1. Switch the circuit breakers of all
batteries to the "on" position
2. Switch on battery using button 3. The battery LED indicator
lights up to indicate that the battery has been turned on

Power off
Press the power button for 3 seconds to turn off the battery. During the process, the buzzer will sound for 1 second and the LED light will turn off. When multiple batteries need to be shut down in parallel, this action needs to be repeated.

Please close the waterproof cover of the circuit breaker and tighten the waterproof cover screws

External USB battery
The USB of the battery can only be used for firmware upgrades. Please do not plug your phone or other electronic products into the USB of the battery for charging, otherwise the battery may be damaged.

1. Prepare a USB 2.0 interface USB flash drive in FAT32 format, storage space not exceeding 8GB;

2. Copy the battery firmware provided by the manufacturer to the root directory of the USB drive and
delete all other files in the USB drive
3. Unscrew the fixing screws of the waterproof cover and open it, then set the dial switch according to
the following diagram;

4. Insert the USB drive into the USB port of the battery, and the firmware
will automatically update. After the SOC indicator light flashes alternately in red and green, the battery will automatically restart and the buzzer will sound once, indicating a successful upgrade.

1, 1
(USB Internal)

5. After the upgrade is successful, unplug the USB flash drive, set the dial
switch according to the following diagram, close the waterproof cover, and tighten the waterproof cover screws.

0, 0
(USB External)

V.1.0 | 2024

USB Mode

LABEL DESCRIPTION
Nameplate This provides unique identification of the battery (product type, device-specific characteristics, certificates and approvals). The Nameplate is located on the right side of the battery.

Serial number Located on the right side of the battery, the current battery serial number information.

SN: PBG XX X XXXX
1 23 4

Number 1 2 3 4

Paraphrase Item code Year Month
Production number

PORT FEATURES

Connect battery cables with inverter

The batteries are connected together

Master

Waterproof box

Slave

125A DC breaker

Ground screw Sockets

Dipswitches

USB Upgrade firmware
USB dip switch Select USB comms
V.1.0 | 2024

Dipswitches

On/Off
Upper computer comms port Developers or maintenance personnel use it to connect the battery upper computer SW4 Set communication address for parallel batteries
SW3 Set communication address for parallel batteries
SW2 Choose the parallel communication method between batteries SW1 Choose the communication method between the battery and inverter

STATUS INDICATORS

Status Indicators

LED

Colour

Green

Name SOC LED1

Description SOC 0%~25%

Green

SOC LED2

SOC 26%~50%

Green

SOC LED3

SOC 51%~75%

Green

SOC LED4

SOC 76%~100%

Red

SOC LED

Fault

Green Power button Normal operation

What does the STATUS light mean?

Off Green Green, flashing Flashing Red

Shut down Power is on Low battery energy Upgrading status Fault. Logged in system. If the light is red, call GivEnergy for remote diagnostics.

Battery on: Press and hold the Battery button for 1s; the buzzer will sound for two seconds and the LED of battery switch will be green.
Battery off: Press and hold the Battery button for 3s; the buzzer will sound for one seconds and the LED of battery switch will dim
Charge: The Battery SOC in which range, the corresponding SOC LED The indicator is green and off at intervals of 1s
Low SOC: When the SOC ranges from 0% to 5%, LED1 is flashes every 2 seconds
Upgrade: The SOC LED Red-Green alternating

MANUFACTURER WARRANTIES
GivEnergy is the main supplier and manufacturer of the product. GivEnergy warrants that your product is (a) of acceptable quality and (b) does not have any latent defects.
If you suspect something is wrong with the battery, contact GivEnergy on 01377 252 874 or email support@givenergy.co.uk. If any damaged or missing parts are found, please contact GivEnergy on 01377 252 874 or email support@givenergy.co.uk immediately. Returns must be provided in original or equivalent packaging. The cardboard packaging is recyclable. Products Covered
GIV-BAT-9.5-G3
12 years
V.1.0 | 2024

GIV-BAT 5.12 SKU Cell type Battery Capacity Battery Energy Nominal Voltage Operating Voltage Range Cont. max. charging and discharging Peak Current Max charging and discharging power Peak Power Beast Mode (Discharge)1 Depth of discharge Operating voltage range Storage temperature Dimension (W/H/D) Weight Cooling Communication Protocols Humidity Range Ingress Protection Impact protection rating Protective Class Parallel quantity Installation Battery certification

DATASHEET
GIV-BAT-9.5-G3 LiFePO4 prismatic cell
9.5 kWh / 186 Ah 9523Wh 51.2V
44.8-57.6V 120A
180A@1s 6000W 9000W@1s 150A / 750 0W@5min 100% 44.8-57.6V -20°C - 50°C 576H X 225D x 480W (mm) 85±2Kg Natural cooling CAN/RS485 5%~95%RH
IP65 IK10
1 Up to 5 Floor/Wall standing installation IEC 62619/IEC 62040 /CE/UKCA/UN38.3 /CEC-AU

Status

Items

0%-25%

Charge SOC

26%-25% 51%-75% 76%-99%

100%

100%-76%

Discharge SOC

75%-51% 50%-26%

25%-0%

100%-76%

75%-51%

Idle

50%-26%

25%-5%

V.1.0 | 2024

5%-0%

APPENDIX | LED LIGHT DEFINITION

LED1

SOC indication LED2 LED3 LED4

Description

t=1s t=1s

The battery SOC; the corresponding SOC LED indicator will flash every second

t=1s

t=1s

No special display status

When the SOC ranges from 0% to 5%, LED1 will flash every 2 seconds
t=2s

Parallel

Parallel connection

connection succeeds

1

2

3

4

t=0.8s t=0.8s t=0.8s t=0.8s

When paralleling batteries the status indicator will flash to show its parallel status from 1 to 4.

Cell charge overvoltage protection

SOC LED light red

Battery charge overvoltage protection

SOC LED light red

Over charge and over discharge protection

Discharge SOC

Cell discharge undervoltage protection
Battery discharge undervoltage protection

SOC LED light red SOC LED light red SOC LED light red

Discharge short circuit

SOC LED light red

Voltage sampling fault
Charge/discharge overcurrent protection

SOC LED light red SOC LED light red

GivEnergy Group Ltd
Osprey House Brymbo Road Stoke-on-Trent
ST5 9HX 01377 252 874
www.givenergy.co.uk



References

Adobe PDF Library 17.0 Adobe InDesign 19.5 (Macintosh)