Installation Guide for GivEnergy models including: Giv-Bat-9-5-Gen-3, GIV-BAT-9.5-G3, GIV-BAT-9.5-G3 9.5kWh Li-Ion Battery, GIV-BAT-9.5-G3, 9.5kWh Li-Ion Battery, Li-Ion Battery, Battery
GivEnergy 9.5kWh Li-Ion Battery - Gen 3 - Solar Trade Sales
Lowest Prices - GivEnergy 9.5kWh Gen 3 Solar Battery Storage – ITS Technologies
File Info : application/pdf, 12 Pages, 1.09MB
DocumentDocumentV1 OCT 2024 LITHIUM IRON PHOSPHATE LiFePO4 BATTERY INSTALLATION MANUAL GENERATION 3 Giv-Bat 9.5 GIV-BAT-9.5-G3 GIV-BAT 9.5 | GEN 3 SPECIFICATIONS Specifications V.1.0 | 2024 BIGGER AND BETTER Our third-generation battery is here The third generation of the GivEnergy 9.5kWh battery brings all the substantial benefits of its predecessor but in an offering made smaller and lighter. The 9.kWh product is one of our most popular choices for medium-large properties. With its significant capacity and 12 year warranty covering unlimited cycles, the Giv-Bat 9.5 offers an incredibly competitive cost / kWh. Meanwhile, from an installation perspective, the product is a breeze to work with. Push-fit connections and inbuilt DCMCB allow for fast, easy installations. Ultimately, this high-performance, high-security, and high-powered LiFePO4 battery is a prime choice to achieve your energy independence. Dimensions 576H X 225D x 480W (mm) Weight 85±2Kg Usable capacity 9.5 kWh / 186 Ah Nominal voltage 51.2V DC Current <120A SKU GIV-BAT-9.5-G3 Impact protection rating IK10 Warranty 12 years Charging temperature 0°C - 50°C Discharging Temperature -10°C - 50°C Voltage range 4 4 . 8 -57.6 V Depth of Discharge 100% Country of manufacture China Item A B C D E F BOX CONTENTS Item Name Qty Battery Module Battery Module 1 Wall Mounting Bracket Wall Mounting Bracket 1 User manual Documentation 1 Expansion bolts Fixing 4 Ground screw Fixing 1 Security screw Fixing 2 A D E F B C GENERAL INFORMATION Introduction All information contained in this booklet refers to the assembly, installation, commissioning, and maintenance of the Generation 3 battery. Please retain this manual for future reference. Legal Disclaimer: This document is the property of GivEnergy, reproduction is prohibited. Installation Requirements Installation of all GivEnergy equipment must be carried out by a GivEnergy approved installer. Unit Information The Generation 3 batteries are designed to work with a GivEnergy AC Coupled or Hybrid Inverter. The batteries work with renewable generation or import from the grid at off-peak times when prices are lower, and discharge during busier periods when prices are more expensive. Storing the Battery The units must be stored in their original packaging at temperatures between -20ºC - 50ºC. Please note that between -10ºC - 0ºC there may be reduced performance in charging and discharging. Do not stack more than 4 units on top of each other. Stock batteries need to be replenished and maintained every five months. If the battery is stored in the warehouse for more than 6 months, the battery may need to be replenished before delivery. Packaging Contents When unpacking, please check the following: There are no missing accessories from the packaging list The model and specification of the battery's nameplate match the order specifications If any damaged or missing parts are found, please contact GivEnergy on 01377 252 874 or email support@givenergy.co.uk immediately. Returns must be provided in original or equivalent packaging. The cardboard packaging is recyclable. V.1.0 | 2024 COMPONENTS Item A B C D E F Item Name Function DC MCB Breaker ON/OFF Switch STATUS Earthing Point Connection ports Dip Switches Provides overcurrent protection and a form of isolation for the battery Switch on/off on the BMS Shows you the state of charge and status of the battery Earth Bonding Power and comms connection to the inverter and other batteries Address the ID when using multiple batteries B A C A D E F DC MCB / dip switches BATTERY CABLES Two types of cables exist for connection to Gen 3 batteries; Lug to plug battery cable When connecting a Gen 3 battery to a Gen 1 battery, or a Gen 3 battery to a Gen 1/2 inverter. Plug to plug battery cable When connecting a Gen 3 battery to a Gen 2/3 battery, or a Gen 3 battery to a Gen 3 inverter. IMPORTANT All Generation 3 battery cables need to be purchased separately. V.1.0 | 2024 SAFETY AND INSTALLATION Safety Instructions Extra care and attention must be taken when installing and maintaining any GivEnergy equipment. The system is capable of lethal voltages, even when disconnected If you suspect something is wrong with the battery, contact GivEnergy on 01377 252 874 or email support@givenergy.co.uk. If any damaged or missing parts are found, please contact GivEnergy on 01377 252 874 or email support@givenergy.co.uk immediately. Returns must be provided in original or equivalent packaging. The cardboard packaging is recyclable. Installation Instructions All electrical installations must be carried out by a qualified and registered electrician and in accordance with the local Wiring Regulations and other relevant safety legislation Ensure batteries are always fixed to the wall using the mounting bracket, even when the weight of the product is on the floor All GivEnergy equipment must be installed by a GivEnergy approved installer Externally mounted batteries must always be wall mounted above the frost-line or a minimum of 50mm An earth bond must be installed between all batteries and inverters Do not remove the front cover unless instructed by the GivEnergy support team The ambient temperature for the installation of the battery system should be above - 10°C, below 50°C , and the humidity should be between 5% and 95% Install in a well ventilated area. For outdoor installations a canopy is recommended, but not required to be installed above the battery Do not use the battery if there are any deformities, such as bulging or leakages Do not puncture the battery Do not throw the battery or use forceful impact Do not attempt to repair the battery yourself (please call your Approved Installer) The battery must be installed vertically, never install horizontally, avoid tilting the unit STEP-BY-STEP INSTALLATION Below is a list of the tools and equipment required to install the Gen 3 Giv-Bat 9.5: Drill bits Screw driver Socket set Pencil Tape measure Multimeter Spirit level Insulated gloves Safety goggles Safety shoes Hammer Torx bits 1. Place the wall mounting bracket horizontally onto the wall and mark the position of the bracket holes. Ensure the wall is suitable to hold the weight of the battery. 3. Mount the battery onto the mounting bracket. 250mm 250mm 250mm 2. Drill 4 holes at the marked positions ensuring they are the sufficient depth for the fixings. Fix the mounting bracket to the wall using 4 expansion bolts. 4. Place the battery against the wall and ensure it is above the wall mounted bracket. Slide the battery down and hang it on the bracket. Lock the safety screws on both sides of the battery. V.1.0 | 2024 STEP-BY-STEP INSTALLATION For Generation 1 Inverters only 4A. Connect battery output to the inverter using a lug to plug cable. If not connecting to additional battery packs, apply the blanking plug to the unused socket. For Generation 3 Inverters only 4C. If connecting to Generation 3 inverter, use a plug to plug cable from battery output of the Generation 3 battery to the connectors within the Generation 3 inverter. For Generation 2 Inverters only 4B. Connect battery output to the inverter using a lug to plug cable. If not connecting to additional battery packs, apply the blanking plug to the unused socket. For installing additional batteries 4D. If connecting a G1/2 battery to an existing G3 battery. Connect the Plug to Lug cable from the G3 battery connector to the G1/2 battery terminals. Ensuring BMS communications cable has correct polarity. Ensure the G3 battery DIPs are set for Master and the G1/2 battery are set for Slave. A DC Isolator will be required to protect the slave battery(s). All batteries must be on compatible firmwares. V.1.0 | 2024 STEP-BY-STEP INSTALLATION 4E. If connecting a Generation 2/3 battery to a Generation 2/3 battery use a plug to plug cable and connect from battery socket in your master battery into your slave Generation 2 battery, and set your dip switches as per step 5 (below). Ensure all unused sockets are covered with a blanking plug. 5. Set up the dipswitches on the circuit breaker, as shown overleaf. SWITCH 4 - Master / Slave Dip Switch SWITCH 3 - Address Dip Switch SWITCH 2 - Address Dip Switch SWITCH 1 - Address Dip Switch 6. Push the `On/Off' button on the right hand side of the battery, the LEDs will light up. 7. Commission the battery on the online portal and ensure the battery is operating normally. V.1.0 | 2024 Master Dip switch ID name SW4 Description v v v v v SW3 v v ^ ^ SW2 ^ ^ v v SW1 v v v v Slave 2 Dip switch ID name SW4 Description v v v v v SW3 v v ^^ SW2 v v ^ ^ SW1 v ^ v v Slave 4 Dip switch ID name SW4 Description v v v v v SW3 v v ^ ^ SW2 v v ^ ^ SW1 v v v ^ RS485 DIP SWITCH SETTINGS Slave 1 Dip switch ID name SW4 Description v v v v v SW3 v v ^ ^ SW2 v v ^ ^ SW1 ^ v v v Slave 3 Dip switch ID name SW4 Description v v v v v SW3 v v ^ ^ SW2 v v ^ ^ SW1 v v ^ v POWER ON AND OFF THE BATTERY SYSTEM If any abnormalities are found during the process of powering on the battery, please immediately turn off the battery power. After solving the problem, turn on the battery again Make sure the inverter is turned off before checking the battery Power on 1. Switch the circuit breakers of all batteries to the "on" position 2. Switch on battery using button 3. The battery LED indicator lights up to indicate that the battery has been turned on Power off Press the power button for 3 seconds to turn off the battery. During the process, the buzzer will sound for 1 second and the LED light will turn off. When multiple batteries need to be shut down in parallel, this action needs to be repeated. Please close the waterproof cover of the circuit breaker and tighten the waterproof cover screws External USB battery The USB of the battery can only be used for firmware upgrades. Please do not plug your phone or other electronic products into the USB of the battery for charging, otherwise the battery may be damaged. 1. Prepare a USB 2.0 interface USB flash drive in FAT32 format, storage space not exceeding 8GB; 2. Copy the battery firmware provided by the manufacturer to the root directory of the USB drive and delete all other files in the USB drive 3. Unscrew the fixing screws of the waterproof cover and open it, then set the dial switch according to the following diagram; 4. Insert the USB drive into the USB port of the battery, and the firmware will automatically update. After the SOC indicator light flashes alternately in red and green, the battery will automatically restart and the buzzer will sound once, indicating a successful upgrade. 1, 1 (USB Internal) 5. After the upgrade is successful, unplug the USB flash drive, set the dial switch according to the following diagram, close the waterproof cover, and tighten the waterproof cover screws. 0, 0 (USB External) V.1.0 | 2024 USB Mode LABEL DESCRIPTION Nameplate This provides unique identification of the battery (product type, device-specific characteristics, certificates and approvals). The Nameplate is located on the right side of the battery. Serial number Located on the right side of the battery, the current battery serial number information. SN: PBG XX X XXXX 1 23 4 Number 1 2 3 4 Paraphrase Item code Year Month Production number PORT FEATURES Connect battery cables with inverter The batteries are connected together Master Waterproof box Slave 125A DC breaker Ground screw Sockets Dipswitches USB Upgrade firmware USB dip switch Select USB comms V.1.0 | 2024 Dipswitches On/Off Upper computer comms port Developers or maintenance personnel use it to connect the battery upper computer SW4 Set communication address for parallel batteries SW3 Set communication address for parallel batteries SW2 Choose the parallel communication method between batteries SW1 Choose the communication method between the battery and inverter STATUS INDICATORS Status Indicators LED Colour Green Name SOC LED1 Description SOC 0%~25% Green SOC LED2 SOC 26%~50% Green SOC LED3 SOC 51%~75% Green SOC LED4 SOC 76%~100% Red SOC LED Fault Green Power button Normal operation What does the STATUS light mean? Off Green Green, flashing Flashing Red Shut down Power is on Low battery energy Upgrading status Fault. Logged in system. If the light is red, call GivEnergy for remote diagnostics. Battery on: Press and hold the Battery button for 1s; the buzzer will sound for two seconds and the LED of battery switch will be green. Battery off: Press and hold the Battery button for 3s; the buzzer will sound for one seconds and the LED of battery switch will dim Charge: The Battery SOC in which range, the corresponding SOC LED The indicator is green and off at intervals of 1s Low SOC: When the SOC ranges from 0% to 5%, LED1 is flashes every 2 seconds Upgrade: The SOC LED Red-Green alternating MANUFACTURER WARRANTIES GivEnergy is the main supplier and manufacturer of the product. GivEnergy warrants that your product is (a) of acceptable quality and (b) does not have any latent defects. If you suspect something is wrong with the battery, contact GivEnergy on 01377 252 874 or email support@givenergy.co.uk. If any damaged or missing parts are found, please contact GivEnergy on 01377 252 874 or email support@givenergy.co.uk immediately. Returns must be provided in original or equivalent packaging. The cardboard packaging is recyclable. Products Covered GIV-BAT-9.5-G3 12 years V.1.0 | 2024 GIV-BAT 5.12 SKU Cell type Battery Capacity Battery Energy Nominal Voltage Operating Voltage Range Cont. max. charging and discharging Peak Current Max charging and discharging power Peak Power Beast Mode (Discharge)1 Depth of discharge Operating voltage range Storage temperature Dimension (W/H/D) Weight Cooling Communication Protocols Humidity Range Ingress Protection Impact protection rating Protective Class Parallel quantity Installation Battery certification DATASHEET GIV-BAT-9.5-G3 LiFePO4 prismatic cell 9.5 kWh / 186 Ah 9523Wh 51.2V 44.8-57.6V 120A 180A@1s 6000W 9000W@1s 150A / 750 0W@5min 100% 44.8-57.6V -20°C - 50°C 576H X 225D x 480W (mm) 85±2Kg Natural cooling CAN/RS485 5%~95%RH IP65 IK10 1 Up to 5 Floor/Wall standing installation IEC 62619/IEC 62040 /CE/UKCA/UN38.3 /CEC-AU Status Items 0%-25% Charge SOC 26%-25% 51%-75% 76%-99% 100% 100%-76% Discharge SOC 75%-51% 50%-26% 25%-0% 100%-76% 75%-51% Idle 50%-26% 25%-5% V.1.0 | 2024 5%-0% APPENDIX | LED LIGHT DEFINITION LED1 SOC indication LED2 LED3 LED4 Description t=1s t=1s The battery SOC; the corresponding SOC LED indicator will flash every second t=1s t=1s No special display status When the SOC ranges from 0% to 5%, LED1 will flash every 2 seconds t=2s Parallel Parallel connection connection succeeds 1 2 3 4 t=0.8s t=0.8s t=0.8s t=0.8s When paralleling batteries the status indicator will flash to show its parallel status from 1 to 4. Cell charge overvoltage protection SOC LED light red Battery charge overvoltage protection SOC LED light red Over charge and over discharge protection Discharge SOC Cell discharge undervoltage protection Battery discharge undervoltage protection SOC LED light red SOC LED light red SOC LED light red Discharge short circuit SOC LED light red Voltage sampling fault Charge/discharge overcurrent protection SOC LED light red SOC LED light red GivEnergy Group Ltd Osprey House Brymbo Road Stoke-on-Trent ST5 9HX 01377 252 874 www.givenergy.co.uk