Installation Guide for ENVIRO models including: C34 Fireplace, C34, Fireplace
C-16871 C34 Installation Guide (2023) - Urban Fireplaces
C-16871 C34 FIREPLACE Installation Reference Guide REFER TO OWNER'S MANUAL FOR SPECIFIC INSTALLATION REQUIREMENTS AND ADDITIONAL PRODUCT INSTRUCTIONS Minimum Framing Dimensions 1" (25mm) Clearance from framing studs to venting Depth 20" 508 mm Width 45" 1143 mm Header Height 38" 965 mm Rough Opening Height 43.5" 1105mm Enclosure Ceiling 65" 1651 mm Note: Vent size = Co-axial 5 x 8" WOOD STUD ROUGH OPENING SUPPLIED STEEL STUD 65" (1651mm) 20" (508mm) 38" (965mm) 43.5" (1105mm) 45" (1143mm) Clearance to Combustibles A - Finishing edge to side wall B - Minimum clearance to enclosure ceiling C - Minimum clearance to mantel height D - Front of door to edge of floor protection E - Minimum alcove width 7" 229mm 65" 1651 mm See Chart See Chart 0" 0 mm 50" 1270 mm B A C E D Non-Combustible Board Placement Framing MetalStud Concrete Board COMBUSTIBLE 456 1/2" NON COMBUSTIBLE 13 3/4" Drywall Sidewall 7" 5 3/16 10" Fireplace Dimensions Minimum Venting Requirements Minimum permitted venting is shown below. The framing height to the center of the thimble is 50". Minimum venting must include a 12" vertical section and a 90 degree elbow which is then terminated horizontally. For a vertical termination please follow the vent pipe manufacturer's installation instructions for vertical vent termination framing. A minimum of 1 in. (25 mm) clearance on all sides of the vertical vent pipe must be maintained. For every 12" of horizontal run there must be a 1/4" of rise. 1" of clearance between framing and venting must be maintained at all times. 2" above the venting and 3" above an elbow. 20" 509mm Mantel Projections Mantel graph dimensions are measured from the bottom of the fireplace, if you wish to reference the mantel height from the tiling edge subtract 15 inches (381mm) from the mantel height depicted on the graph. If you plan to install a TV above your fireplace refer to the appropriate section of the owner's manual for available options. It is acceptable to install a combustible mantel over top of the noncombustible board. If you are activating the Cool Surface System you are eligible to subtract 12" (305mm) from the mantel height shown in this diagram. See page 6 for more details. 50" 1272mm MANTLE HEIGHT 47" 46" 12" MANTLE 45" 44" 8" MANTLE 43" 42" 41" 4"MANTLE 40" 39" 1 2 3 4 5 6 7 8 9 10 11 12 13 14 MANTLE DEPTH OPTIONAL STEP Cool Surface System Part 1 Dimensions 9 /" 2 /" 11 / " 7 /" 32 / " 37 / " 25 / " 2 /" /" 3 /" 2 /" 20 / " Ø5" Vent Collars 2" 7 /" C34 CSS Front Vent - Overall Dimensions 12.18 12.24 1.39 13.64 14.92 8.00 0.50 2.63 0.88 6.07 8.42 7.67 6.17 10.72 9.75 2.48 4.65 4.75 4.75 4.75 4.75 4.75 4.75 .49 14.39 36.00 7.47 9.75 11.74 CSS Side Vent - Dimension3s6.00 2.48 .49 2.48 .49 .50 4.759.75 9.75 19.00 9.75 36.00 36.00 4.75 4.75 36.00 3366.0.000 36.00 2.48 2.48 .49 36.00 26..0409 .49 .50 2.48 2.48 2.48 .49 .49 .49 26.00 9.9.550 .50 2.48 4.75 36.00 4.75 .49 4.75 .50 4.75 2.00 26.00 26.00 9.95 4.75 C34 CSS Combustible Facing2K.00it -2D.00imensions 26.004.75 4.75 4.75 9.95 9.95 9.95 .50 2.00 .92 .92 .50 .50 2.48 2.00 4.75 .50 .92 .50 4.75 .92 .50 OPTIONAL STEP Cool Surface System Part 2 Framing & Rough Opening Front Vent CSS Outlet Min. Top and Bottom standoff = 25/8" (6.7 cm) *All C Series* 45" (114 cm) 7 1/2" (2.5 cm) 2 x 4 (On Edge) 2 7 8 " (7.3 cm) 2 x 4 (On Edge) 37 1/4" (94.6 cm) Min. Height Outlet Finished Opening Size 3 8 " (1 cm) C34 - 33" (83.8 cm) C44 - 43" (109.2 cm) C60 - 59" (149.9 cm) *Steel Stud Required if not using Combustible Facing Kit* C34 4" (10.2 cm) Venting Clearances - Front Vent 80" (203 cm) Minimum Ceiling 91" (231 cm) C72 Min. Ceiling 2 3 4 " (69.8 cm) 5 5 8 " (14.3 cm) Shown here are the minimum framing and clearances for the CSS when the fireplace is installed with the minimum allowable vent length: Min. Ceiling Clearance from top of CSS outlet = 4" (10.2 cm) Min. Ceiling Clearance in wall from top of CSS Body = 55/8" (14.3 cm) CSS Body Min. Rear standoff = 2¾" (69.8 cm) 73 1 4 " (174.9 cm) Side Brace Min. Height 39" (99 cm) Min. Length 5" dia. flex vent (not supplied) Min. Vent 20" (50.8 cm) Min. Depth OPTIONAL STEP Cool Surface System Part 3 Framing & Clearances CSS Side Vent C34 = 45" (114cm) C44 = 55" (140cm) C60 = 71" (180cm) C72 = 83" (211cm) Min. Height 51-3/8" ( 130cm) *Steel Stud Required if not using Combustible Facing Kit* Min. Height to Ceiling 14.50 15.00" (38cm) Min. to Ceiling 5" (12.5cm) 11.50" (29cm) 3/4" (2cm) Gap Shown Min. Ceiling Height 18.75" (48cm) 11.5" (29cm) Min. Distance to wall from standoff 5.00" (13cm) Min. Distance to Ceiling 4.5" (11.5cm) *15.75" (40cm) Min. Vent 39" (99 cm) Min. Length 5" dia. flex vent (not supplied) Min. Height from floor 69.5" (176.5cm) Min. Height 66.00" (168cm) 39" (99 cm) Min. Length 5" dia. flex vent (not supplied) Min. Dist 61.75" (157cm) Min. Distance to floor 64" (162.5cm) *NOTE: 15.75" from the header is required for min. ceiling height. Rest unit on lower standoff. There will be a 3/4" (2cm) gap on from the top standoff to the header in this confirguration. Min Framing is 15" x 11.5" CSS Side Vent (Horizontal Install) - Min. Framing & Clearances CSS Side Vent (Vertical Install) - Min. Framing & Clearances OPTIONAL STEP Cool Surface System Part 4 Framing & Revised Mantle Clearances - Front Vent Framing & Revised Mantle Clearances - Side Vent Min. Height to Ceiling 55-1/16" (1399cm) 12" (305mm) 8" (203mm) 4" (102mm) 33" (84cm) 2-1/16" (75cm) 31 " (79cm) Min. Height For Surround 29 " (74cm) Min. Height to Ceiling 55-1/16" (1399cm) 12" (305mm) 8" (203mm) 4" (102mm) 2-1/16" (75cm) 33" (84cm) 31 " (79cm) Min. Height For Surround 29 " (74cm) Above Ambient Height from Opening Above Ambient Height from Opening TV Installation Considerations: If you are planning to mount a TV above your fireplace some considerations must be made to ensure it is protected from the heat. During testing temperatures did not exceed 121°F (49°C) midway up the front wall (see figures on right). There is no guarantee that these temperatures will not harm the longevity of your TV. Make sure to consult your TV manufacturer's specifications to find the maximum allowable operating temperature. Since every home and installation is unique, temperatures should be verified at the time of install if possible. If desired, front wall temperatures can be lowered to 104°F (40°C) with the use of a mantle (see CSS TV clearances with Mantle figure). See revised mantle clearances chart above. A TV should not be installed if temperatures exceed the manufacturers maximum allowable temperature. 29°F 41" 29°F 35" 29°F 29" 27°F 23" 35°F 17" TV must be 5" min from discharge if no mantle 38°F 11" 49°F 5" 1-1/2" Air Gap behind the TV. (Typically provided by a wall mount) 0" 1/2" Combustible Base Material (Drywall) Up to 1" Combustible Material Combustible Facing Kit CSS - TV Clearances Min. 2-1/2" (6.4cm) 29°F 41" 21°F 35" 21°F 29" 24°F 23" 17°F 17" 20°F 11" Min. 2" (5cm) Gap 30°F 5" 0" 4" Mantle 29" from floor. 1/2" Combustible Base Material (Drywall) Up to 1" Combustible Material. Combustible Facing Kit NOTE: You cannot install a Surround with the mantle at its lowest position. Install mantle at 31" for a Surround CSS - TV Clearances with MantlePDFium PDFium