Karibu Fiona 2 Sauna Assembly Instructions
Important Information Before Assembly
First, compare the list of materials with your package contents! Please understand that complaints can only be processed in the non-built status.
Parts List
Part ID | Dimensions | Item ID |
---|---|---|
W1 | 1920 x 950 x 68mm | ID 24766 |
W2 | 1920 x 606 x 68mm | ID 25550 |
W3 | 1920 x 606 x 57mm | ID 23624 |
W4 | 1920 x 780 x 57mm | ID 23625 |
W5 | 1920 x 606 x 57mm | ID 23629 |
W6 | 1872 x 780 x 42mm | ID 25551 |
W7 | 1920 x 606 x 68mm | ID 47717 |
B1 | 1920 x 19 x 3mm | ID 20799 |
B2 | 70 x 45 x 18mm | ID 26366 |
B3 | 800 x 45 x 18mm | ID 24796 |
B4 | 1884 x 45 x 17mm | ID 48037 |
B5 | 480 x 95 x 18mm | ID 20930 |
B6 | 580 x 95 x 18mm | ID 16708 |
B7 | 765 x 95 x 18mm | ID 26357 |
B8 | 1300 x 95 x 18mm | ID 15510 |
B9 | 300 x 120 x 18mm | ID 22467 |
B10 | 590 x 42 x 28mm | ID 26360 |
B11 | 950 x 42 x 28mm | ID 26281 |
B12 | 1555 x 42 x 28mm | ID 24130 |
B13 | 1666 x 42 x 28mm | ID 26377 |
B14 | 1759 x 42 x 28mm | ID 24133 |
B15 | 1841 x 42 x 28mm | ID 26376 |
B16 | 1874 x 52 x 52mm | ID 26165 |
G1 | 1980 x 45 x 17mm | ID 48539 |
G2 | 1884 x 58 x 17mm | ID 48521 |
G3 | 1980 x 95 x 17mm | ID 48540 |
L1 | 1810 x 550 x 90mm | ID 21767 |
L2 | 1810 x 90 x 22mm | ID 26112 |
C1 | 948 x 42 x 28mm | ID 56631 |
C2 | 1032 x 42 x 28mm | ID 56630 |
C3 | 1181 x 42 x 28mm | ID 56627 |
C4 | 1247 x 42 x 28mm | ID 25740 |
K1 | 1874 x 73 x 42mm | ID 47716 |
M1 | 1582 x 918 x 57mm | ID 24795 |
M2 | 1582 x 918 x 68mm | ID 47718 |
D1 | 859 x 42 x 28mm | ID 56308 |
D2 | 896 x 42 x 28mm | ID 56307 |
E1 | 1920 x 97 x 12mm | ID 22863 |
S1 | ID 14266 | |
S2 | ID 26116 | |
T1 | ID 26272 | |
Screws (20x) | 4 x 30mm | ID 3686 |
Screws (80x) | 4 x 50mm | ID 3688 |
Screws (40x) | 4 x 70mm | ID 3689 |
Screws (50x) | 4.5 x 80mm | ID 9204 |
Screws (15x) | 6 x 60mm | ID 14014 |
Screws (120x) | 4.5 x 40mm | ID 26285 |
Roll (10m) | ID 14025 | |
Fasteners Pack | ID 26496 | |
Bracket Pack | ID 26114 | |
Connector Pack | ID 20708 |
Assembly Steps
Step 01: Base Assembly
Attach two side panels (B1) to the base panel (C1) using nine 4x50mm screws [Ø3mm drill bit].
Step 01.1
Insert panel B1 into panel C1 and secure with screws.
Step 02: Frame Assembly
Connect panels W1, W2, W3, W4, W5, W6, W7, E1, K1, and B16 to form the primary structure. Use appropriate screws and connectors as indicated in the diagrams. Ensure panels are aligned correctly.
Step 03: Wall Panel Attachment
Attach wall panels using screws. For example, connect panel W3 to B16 and W5 using screws.
Step 04: Wall Panel Attachment
Continue attaching wall panels, ensuring proper alignment and secure fastening with screws.
Step 05: Wall Panel Attachment
Attach panel W4 to the structure using screws.
Step 05.1
Secure panel W4 with screws.
Step 06: Wall Panel Attachment
Attach panel B1 to the structure using screws.
Step 06.1
Secure panel B1 with screws.
Step 06.2
Attach panel W1 to the structure.
Step 06.3
Secure panel W1 with screws.
Step 07: Wall Panel Attachment
Attach panel W2 and W7 to the structure using screws.
Step 07.1
Secure panel W2 and W7 with screws.
Step 08: Door Frame Assembly
Assemble the door frame components (E1, K1, B1) and attach them to the main structure using screws (4x80mm, Ø4mm drill bit).
Step 08.1
Attach door frame component E1.
Step 08.2
Attach door frame component K1.
Step 08.3
Secure door frame components with screws.
Step 08.4
Final attachment of door frame components.
Step 09: Roof Frame Assembly
Assemble the roof frame using parts B15, B13, C4, D2, and C2. Connect these parts to the top of the structure.
Step 09.1
Secure roof frame components.
Step 09.2-1
Attach part S1.
Step 09.2-2
Attach part S3.
Step 10: Roof Panel Attachment
Attach roof panels. Panel A is positioned and secured with screws (4x50mm, Ø3mm drill bit) and connectors G2.
Step 10.1
Secure roof panels with screws.
Step 10.2
Continue securing roof panels.
Step 11: Roof Panel Attachment
Attach additional roof panels.
Step 12: Roof Panel Attachment
Ensure panel B3 equals A in length and attach it.
Step 13: Roof Panel Attachment
Attach roof panels B14 and B12 to the structure using screws (3x 4x50mm, Ø3mm drill bit).
Step 14: Roof Panel Attachment
Attach roof panels using screws (Ø3mm drill bit).
Step 14.1
Secure roof panels with screws.
Step 15: Roof Sealing/Trim
Apply sealing material or trim along the roof edges.
Step 15.1
Detail of roof edge sealing/trim.
Step 16: Roof Panel Placement
Place roof panels M1 and M2 onto the structure.
Step 17: Roof Panel Securing
Secure the roof panels using screws (8x Ø3mm, 4x70mm) and other fasteners.
Step 17.1
Detail of roof panel securing.
Step 18: Final Wall Panel Attachment
Attach remaining wall panels and corner pieces (B4, G1, G3) using screws (4x70mm, Ø4mm drill bit).
Step 18.1
Secure panels with screws.
Step 18.2
Secure panels with screws.
Step 18.3
Secure panels with screws.
Step 18.4
Secure panels with screws.
Step 19: Roof Trim Attachment
Attach roof trim pieces B8 and B7 using screws (4x50mm, Ø4mm drill bit).
Step 19.1
Detail of roof trim attachment.
Step 20: Roof Trim Attachment
Attach roof trim pieces T1 using screws.
Step 20.1
Secure roof trim pieces T1 with screws.
Step 21: Final Check
Ensure all parts are securely fastened. Insert part S2.
Step 22: Ventilation Adjustment
This section describes the function of the adjustable board for regulating airflow. Adjust the boards (B10, B11, B2) as per your preference.
Step 22.1-1
Illustrates placement of ventilation boards B10 and B11.
Step 22.1-2
Illustrates placement of ventilation board B2.
Step 22.2-1
Illustrates placement of ventilation boards B10 and B11.
Step 22.2-2
Illustrates placement of ventilation board B2.
Step 22.3
Shows how to insert and adjust ventilation board B9.
Step 23: Heater Connection (9kW)
For 9kW heaters: Assemble the heater base using parts B5 and B6, securing with screws (4x30mm, Ø3mm drill bit) and (4x35mm, Ø3mm drill bit).
Step 24a: Heater Connection (9kW)
Attach the heater base to the sauna structure using screws.
Step 24b: Heater Connection (Other Furnaces)
For other furnaces, assemble the heater base using parts B3, ensuring correct length (B3 = 595mm for 210mm height, B3 = 595mm for 200mm height).
Step 25: Heater Connection
Connect heater components using parts L1 and L2, securing with screws (4x50mm, Ø3mm drill bit).
Step 26: Heater Connection
Connect the heater unit to the assembled base and structure.
Step 27: Electrical Connection
Connect the heater's electrical components. Follow safety guidelines. A warning symbol [!] indicates caution is required.
Glass Door Installation
Step 01: Prepare Glass Door
Place the sauna door glass into the frame.
Step 02: Align Glass Door
Center the glass in the wooden frame. Ensure all adjustable eccentrics have the same basic adjustment.
Step 03: Attach Hinges
Attach hinges to the glass door using 6x80mm screws.
Step 04: Adjust Door Position
Use tools to adjust the glass panel position within the frame.
Step 05: Adjust Eccentrics
Ensure all adjustable eccentrics are in the same base position on the glass panel.
Step 06: Final Door Attachment
Attach the glass door to the frame, making final adjustments.
Step 07: Fine-tune Door Alignment
Adjust the eccentrics to fine-tune the door's position and alignment.
Step 08: Final Securing
Secure the door components.