Instruction Manual for IMI Hydronic Engineering models including: WCMOIN0004 Connect F Transfero Vento Pleno DML Refill, WCMOIN0004, Connect F Transfero Vento Pleno DML Refill, Transfero Vento Pleno DML Refill, Pleno DML Refill, DML Refill
Compresso Connect F
WCMOIN0004 11.2022 Compresso Connect F INSTALL WXMOIN0001 10.2023 SAFETY INSPECTION DISASSEMBLING DISPOSAL prescriptions Compresso Transfero Vento Pleno DML Refill SAFETY INSPECTION · · · · · · Personnel Installing and operating personnel must possess the appropriate knowledge and training. The operator is responsible for the personal protective equipment of the personnel. At least safety glasses and safety shoes are required for repair work, maintenance inspections and installation. · · · · · · Follow the instructions Installation, operation, maintenance and disassembly must be carried out as stated and showed in the different instruction manuals that are an integral part of the delivery and in accordance with best practice. In addition to the IMI Hydronic Engineering instructions, additional instructions from other companies may be included for the components used (e.g. backflow preventers). You must follow these instructions in the same way as the IMI Hydronic Engineering instructions. If anything is unclear, please contact IMI Hydronic Engineering customer service. · · · · · · Tests before commissioning and periodic inspections Test required before commissioning and periodic inspections must be performed according to the regulations in the country where the device is installed and operated. The organization of the tests is the responsibility of the operator. There are no standardised international regulations for the acceptance test prior to commissioning and periodic inspections. According to the PED, it is usually the vessels that determine how the installation is classified. These are CE type-tested in accordance with Pressure Equipment Directive PED/2014/68/EU. For periodic inspections, openings are provided for flange-type or endoscope inspections. Compresso, Transfero, Vento, Pleno control units (TecBox) are classified as electrical equipment. Regular tests must be carried out at least every 4 years. Local regulations may demand shorter periods and must be observed. · In Switzerland, Compresso does not require authorisation from the SVTI if the installation is protected in such a way that psCH is not exceeded. Vessels with psv x V up to 3000 bar*litres do not require inspection by the SVTI. The following combinations with TecBox are recommended: Primary vessel (2) TecBox safety valve (SV) C 10 C15 1000 litres 3 bar on request 800 litres 3.75 bar on request 700 litres 4.2 bar on request 600 litres 5 bar on request 500 litres 6 bar 6 bar 300 litres 10 bar · For Transfero as many extension vessels as required can be connected to the primary vessel. The CE-approved 2 bar safety valve protects the vessels from inadmissible pressures. In Switzerland, SVTI inspection is not required for these types of vessels. · Backflow preventer BA: Perform inspection and maintenance in accordance with EN 1717 and the rules in the operator's country. Functional testing, with documentation, must normally be carried out annually. Dirt trap (SF): Inspect and clean if necessary after a drop in the water make-up capacity or before functional testing of the backflow preventer BA. We recommend including the Pleno P / P R / P CR / BA4R in the maintenance cycle of the connected pressure-maintaining or degassing station. Follow the maintenance instructions for Refill softening modules. The Pleno P / P R / P CR / BA4R can work as an accessory in systems requiring technical inspections (Compresso | Transfero) and can be included as part of the inspection. · · · · · · Place of installation The access to the place of installation must be restricted to trained and specialised personnel. The floor structure must be able to support the maximum operating and installation conditions. Connections for electricity, communication, mains water and waste water must correspond to the requirements of the device. The room must be thouroughly ventilated. The surrounding atmosphere must not be explosive. The gases discharged by Vento and Transfero through the degassing process may be flammable (CH4 / H2) and must be safely removed to the outside air. Do not store flammable, explosive materials near the pressure vessel. Pressurized containers (eg Compresso expansion vessels) must be protected against external fire, at least according to national regulations. Please note the geodetic height of the installation room: With Compresso, the pressure maintenance curve drops by 0.1 bar per 1000 meters above sea level. Transfero must not be operated above 4000 m above sea level (risk of cavitation)! ···· · Water quality IMI Hydronic Engineering devices are designed for pressure maintenance, degassing, make-up and/or water treatment in closed heating, solar and cooling systems with water that contains no aggressive or toxic agents.The entire system must be dimensioned and operated in such a way as to minimise the amount of oxygen admitted through the make-up water or through permeable components. Water treatment systems are to be dimensioned, installed and operated according to the current state of the art. *) The original instructions are written in German (de). Documents in other languages are translations of the original instructions. *) en de fr nl www.imi-hydronic.com TecBox The texts, graphics and diagrams in this document may be subject to alteration without prior notice or reason being given. www.imi-hydronic.com Compresso CU Compresso CG x3 CDVV x5 AVV DLV CDVV LT LT 2 600 mm DLV +5°C - +40°C OK 20% - 80% 20% Hygro 80% 0% 100% Cl : < 60 mg/m²/24h dHc 1x230V dHc (CG) > 800 mm dHc (CU) > 500 mm 150 mm 3 Compresso CU ACV Compresso CG ACV CDVV CDVV 4 DNe SVS DNe DNe DNe DNe 30 m DNe 20 25 32 EN 12828 SWKI 93-1 * Q | kW Q | kW 1000 300 1700 600 3000 900 tsmax 50 °C *) CH Q | kW 1600 2700 5000 5 TecBox 1 2 6 SVV SA1 V1 PT SF1 x3 CLICK! 3 x5 4 7 CU / CG CUE / CGE CU / CG 8 CUE / CGE CUE / CGE 230V/50/60 Hz 10A / 3 x 1,0 mm2 1 #1-5 2 3 4 L PE N 1! L PE N 5 6 BrainCube Connect! www.imi-hydronic.com 9 We reserve the right to introduce technical alterations without prior notice. IMI Hydronic Engineering Switzerland AG Mühlerainstrasse 26 · CH-4414 Füllinsdorf · Tel. +41 (0)61 906 26 26 www.imi-hydronic.com 10Adobe PDF Library 17.0 Adobe InDesign 18.5 (Windows)