Instruction Manual for IMI Hydronic Engineering models including: WCMOIN0004 Connect F Transfero Vento Pleno DML Refill, WCMOIN0004, Connect F Transfero Vento Pleno DML Refill, Transfero Vento Pleno DML Refill, Pleno DML Refill, DML Refill

Installation Compresso Connect F low

Compresso Connect F

PDF preview unavailable. Download the PDF instead.

Installation Compresso Connect F low
WCMOIN0004 11.2022
Compresso Connect F
INSTALL





WXMOIN0001 10.2023

SAFETY ­ INSPECTION ­ DISASSEMBLING ­ DISPOSAL prescriptions

Compresso Transfero Vento Pleno DML Refill

SAFETY ­ INSPECTION

· · · · · · Personnel Installing and operating personnel must possess the appropriate knowledge and training. The operator is responsible
for the personal protective equipment of the personnel. At least safety glasses and safety shoes are required for repair
work, maintenance inspections and installation.

· · · · · · Follow the instructions Installation, operation, maintenance and disassembly must be carried out as stated and showed in the different instruction manuals that are an integral part of the delivery and in accordance with best practice. In addition to the IMI Hydronic Engineering instructions, additional instructions from other companies may be included for the components used (e.g. backflow preventers). You must follow these instructions in the same way as the IMI Hydronic Engineering instructions. If anything is unclear, please contact IMI Hydronic Engineering customer service.

· · · · · · Tests before commissioning and periodic inspections Test required before commissioning and periodic inspections must be performed according to the regulations in the country where the device is installed and operated. The organization of the tests is the responsibility of the operator. There are no standardised international regulations for the acceptance test prior to commissioning and periodic inspections. According to the PED, it is usually the vessels that determine how the installation is classified. These are CE type-tested in accordance with Pressure Equipment Directive PED/2014/68/EU. For periodic inspections, openings are provided for flange-type or endoscope inspections. Compresso, Transfero, Vento, Pleno control units (TecBox) are classified as electrical equipment. Regular tests must be carried out at least every 4 years. Local regulations may demand shorter periods and must be observed.

·

In Switzerland, Compresso does not require authorisation from the SVTI if the installation is protected in such a way

that psCH is not exceeded. Vessels with psv x V up to 3000 bar*litres do not require inspection by the SVTI.

The following combinations with TecBox are recommended:

Primary vessel (2)

TecBox safety valve (SV)

C 10

C15



1000 litres

3 bar

on request



800 litres

3.75 bar

on request



700 litres

4.2 bar

on request



600 litres

5 bar

on request



500 litres

6 bar

6 bar



300 litres

­

10 bar

·

For Transfero as many extension vessels as required can be connected to the primary vessel. The CE-approved 2 bar

safety valve protects the vessels from inadmissible pressures. In Switzerland, SVTI inspection is not required for these

types of vessels.

·

Backflow preventer BA: Perform inspection and maintenance in accordance with EN 1717 and the rules in the operator's

country. Functional testing, with documentation, must normally be carried out annually. Dirt trap (SF): Inspect and clean

if necessary after a drop in the water make-up capacity or before functional testing of the backflow preventer BA. We

recommend including the Pleno P / P R / P CR / BA4R in the maintenance cycle of the connected pressure-maintaining or

degassing station. Follow the maintenance instructions for Refill softening modules. The Pleno P / P R / P CR / BA4R can

work as an accessory in systems requiring technical inspections (Compresso | Transfero) and can be included as part of

the inspection.

· · · · · · Place of installation The access to the place of installation must be restricted to trained and specialised personnel. The floor structure must be able to support the maximum operating and installation conditions. Connections for electricity, communication, mains water and waste water must correspond to the requirements of the device. The room must be thouroughly ventilated. The surrounding atmosphere must not be explosive. The gases discharged by Vento and Transfero through the degassing process may be flammable (CH4 / H2) and must be safely removed to the outside air. Do not store flammable, explosive materials near the pressure vessel. Pressurized containers (eg Compresso expansion vessels) must be protected against external fire, at least according to national regulations. Please note the geodetic height of the installation room: With Compresso, the pressure maintenance curve drops by 0.1 bar per 1000 meters above sea level. Transfero must not be operated above 4000 m above sea level (risk of cavitation)!

····

· Water quality IMI Hydronic Engineering devices are designed for pressure maintenance, degassing, make-up and/or water treatment in closed heating, solar and cooling systems with water that contains no aggressive or toxic agents.The entire system must be dimensioned and operated in such a way as to minimise the amount of oxygen admitted through the make-up water or through permeable components. Water treatment systems are to be dimensioned, installed and operated according to the current state of the art.

*) The original instructions are written in German (de). Documents in other languages are translations of the original instructions.

*) en de fr nl

 www.imi-hydronic.com

TecBox

The texts, graphics and diagrams in this document may be subject to alteration without prior notice or reason being given. www.imi-hydronic.com

Compresso CU

Compresso CG

x3
CDVV

x5 AVV
DLV
CDVV

LT

LT

2

 600 mm DLV

+5°C - +40°C

OK

20% - 80%

20%

Hygro

80%

0%

100%

Cl : < 60 mg/m²/24h

dHc

1x230V

dHc (CG) > 800 mm dHc (CU) > 500 mm

150 mm 3

Compresso CU
ACV

Compresso CG
ACV

CDVV

CDVV

4

DNe
SVS
DNe

DNe DNe


DNe
 30 m

DNe

20

25

32

EN 12828 SWKI 93-1 *

Q | kW Q | kW

1000 300

1700 600

3000 900

tsmax  50 °C *) CH

Q | kW

1600

2700

5000

5

TecBox 1 2
6

SVV

SA1

V1

PT

SF1

x3
 CLICK!

3
x5
4
7

CU / CG

CUE / CGE

CU / CG 8

CUE / CGE

CUE / CGE

230V/50/60 Hz 10A / 3 x 1,0 mm2
1

#1-5
2

3

4

L PE N

1! L PE
N

5

6

BrainCube Connect!
 www.imi-hydronic.com
9

We reserve the right to introduce technical alterations without prior notice.
IMI Hydronic Engineering Switzerland AG Mühlerainstrasse 26 · CH-4414 Füllinsdorf · Tel. +41 (0)61 906 26 26
www.imi-hydronic.com 10


Adobe PDF Library 17.0 Adobe InDesign 18.5 (Windows)