User Guide for BLUETTI models including: EP800 V2.0, EP800 V2.1, EP800 Home Energy Storage System, EP800, Home Energy Storage System, Energy Storage System, Storage System
File Info : application/pdf, 20 Pages, 5.57MB
DocumentDocumentBLUETTIEP800 Quick Guide V2.1 1. Special tools and parts need before installation for EPSOO l Crimping tools It is not provided by BLUETTI 2 Sub panel {Transfer Switch) 3 AC disconnect Junction box, 4 and junctions 5 Electric cable The sub panel with interlock breaker is provided by the BLUETTI The safety switch is connect ed between the main panel to the EP800 grid input terminal .60A,240V. It is not provided by BLUETTI Recommend to connect the cable s from sub panel to EP800 backup terminal . It is not provided by BLUETTI White, black, red ,green , 6 AWG electric cables . It is not provided by BLUETTI 6 Liquid-tight conduit 3/4 inch or above, it is not provided by BLUETTI Electric metallic 7 tube and other accessories 3/4 inch or above, it is not provided by BLUETTI JUST POWER ON 03 3. Installation 3.1 Overview Solar panels - -E loT loT 2 PV strings ·Backup l Grid input l, , I `a_-_Jl!!J ACDisconnect Main Panel Meter Grid Sub Panel (build-in transfer switch) · f- {I Essential loads 3.2 Installation requirements Before Installation: Important Notes · The installation must be performed by a licensed electrician. Improper installation may result in death or serious injury and property damage. · Prepare necessary tools and accessories. · Read the EP800 User Manual and Quick Start Guide. · Recommended the open circuit voltage of solar system is between 240V and 500V. Select an Appropriate Installation Location 0 : © Operating Instructions · If there's no power input and the Soc drops to 7%, switch oall battery main switches to prevent over-discharging. Only restart the system when recharging from the grid. · Charge the batteries when the Soc is below 5% in time and maintain it at least at 5% for continuous operation. · For long-term storage, charge the batteries to 40%-60% Soc and perform a full cycle at least every 3 months. JUST POWER ON 05 4.6 Connect PV cables o - PV1 + PV2 + 0 PVl+: To solar panel positive PVl-o solar panel negative PVl PE: PVl to solar panel ground PV2+: To solar panel positive PV2-: To solar panel negative PV2 PE: PV2 to solar panel ground Conductor cross-sectiona I area: PVl 72AWG PV2 lOAWG 7--97m6-m03. 54(in) -3354(in) l. Positive metal core 2 2. Negative metal core l.Positive metal terminal 2 2.Negative metal terminal MC4Wrench - NOTE: Please check the open circuit voltage of PVarrays, which should be between 240V and 500V. JUST POWER ON 11 || No------- L2 Grid Main Panell G Solution 1: For new installation solar panels Ll I L2 17234561 | L _ _D_RM s_ _J LINK PORTl EP800 12AWG 12AWG lOAWG lOAWG Standard cable --,------------------------------7 Standard cable Standard cable Non-essentia I Load Note: l.This circuit diagram only for reference, details according to the needs of customer and must follow the NEC code. 2.Normally, turn the transfer switch to Sub panel Ll I L21 Transfer Switch the BACKUP side of EP800 to backup UOJTSP W for essential loads . 3.Turn the transfer switch to the grid side only when the EP800 Essential Load E ORN malfunctions. N G 1 3 4. There is an automatic transfer switch inside the EP800 , it will switch over to the Batteries side within 20ms, when the grid goes down. N 1 6 UJ S TOP W E ORN - -loT E loT Solution 3: Existing solar panels EP800 --B-ac-k-u-p-----, Grid input AC Disconnect Main Panel 4. 9 oFr Meter Grid g estxiin aso1r 8500 8500 paesnl B500 Sub Panel (build-in transfer switch) g Solar panels D1/ AC Solar PV Inverter* *if max power< 4000W at least 2*8500; if max poweris 4001W- 6000W at least 3*8500; if max poweris 6001-7000W at least 4*8500; Only compatible with ENPHASE IQ7 and IQ6 | ---: -- L Essential loads 0 0000 Normal loads Note: Not all solar PV inverters are compatible with EP800, please contact BLUETTI before installation. If you want to use existing solar panels, please purchase CT and Meter from the official website. Purchase link: https://www.bluettipower.com/collections/ep800-ep900-accessories 5. Power on Step l Switch on the DC circuit breakers on EP800. Step 2 Switch on the DC c| cuit breakers on B500 battery packs. Press and hold the power button of any battery pack for about 3 seconds, and the green indicator on the button will light up. Step 3 About 40 seconds later, the indicator on EP800 will stay green. Step 4 Switch on the AC circuit breakers connected to the EP800 GRID terminal. Step 5 Power on the system via BLUETTI app Step 6 Check the voltage of BACKUP terminal and turn on the breakers of generator supply. Step 7 Switch on the AC circuit breakers connected to the EP800 load port. Step 8 Check the EP800 system operation in the App Indicator IIUN Run ON OFF OFF FLT Run +Alarm ON ON OFF Fault OFF OFF ON Alarm and fault OFF ON ON 18 JUST POWER ON