POS System
“
Product Information
Specifications:
- Model: [Insert Model Number]
- Screen Size: [Specify Screen Size]
- Power Supply: Grounded Power Outlet
- Compatibility: Windows System
Product Usage Instructions
1. Installation Precautions
When handling equipment, ensure careful handling of packaging
materials. Prior to installation, organize and clean the
installation site. Plan the wiring path for power supply and
network connections in advance. During installation, operate the
equipment without power. Always use a grounded power outlet.
2. Equipment Installation Operation
Planning the Waiting Area: Pre-plan the spatial
location, size area, and electrical path of the equipment. Ensure
the area is clean and tidy.
Unpacking: Open the packaging and remove the
main unit and accessories. Check against the packaging list or
order form for completeness.
Assembly of Customer Display Screen: If
applicable, place the host device on a flat surface, adjust the
angle as needed.
Assembly Docking Station (if required):
- Adjust the main screen and sub-screen positions.
- Open the wiring cover of the I/O interface cover on the main
screen. - Insert the TYPE-C cable of the docking station correctly into
the column from the bottom of the base and connect it to the main
screen’s TYPE-C interface. - Secure the cable with screws on the TYPE-C cable head.
Frequently Asked Questions (FAQ)
Q: Can I install the equipment without a grounded power
outlet?
A: It is recommended to always use a grounded power outlet for
safe operation of the equipment.
Q: How do I shut down the equipment in Windows system?
A: Use the shutdown command under the corresponding system on
the display page, such as Start > Shut Down Computer. Do not
shut down the device directly after cutting off the power.
“`
4. Installation precautions
When disassembling packaging and handling equipment, please handle with care.
Please organize and clean up the location of the installation site in advance, and plan the wiring path for power supply, network connection, and other environments in advance. During the installation process of the equipment, please make sure to operate it without power, and do not use power for installation operations. Please make sure to use a grounded power outlet;
In the Windows system, to shut down, please use the shutdown command under the corresponding system on the display page (such as: Start Shut Down Computer), Do not shut down the device directly after cutting off the power.
5. Equipment installation operation
Planning the waiting area: Please pre plan the spatial location, size area, and electrical path of the equipment to be pre installed, and clean and tidy it up;
Unpacking: Open the packaging and take out the main unit and its accessories (if there are auxiliary screens, docking stations, peripherals, etc.) separately. Please check whether the corresponding materials are neat according to the packaging list or order form;
Assembly of customer display screen (if available): (applicable to 15.6 “or 10.1” customer display screen) a. Place the host device on a flat cash register table, adjust the angle of the
main screen to the appropriate position, and remove the cover 1 and hard drive cover 2 that fix the guest display screen on the main screen; b. Remove the customer display screen and corresponding screws, place and install the customer display screen on the main screen in the direction shown in Figure 2 on the right(Also pay attention to the routing of the HDMI cable), install it correctly and lock the corresponding screws; c. Insert the HDMI cable head on the guest display screen into the HDMI interface on the main screen, as shown in Figure 3 on the right; And confirm that the insertion is correct and secure, and tidy up the HDMI harness; d. After checking that the secondar y screen is installed correctly and securely, install the hard drive cover and lock the corresponding screws.
Figure 1
Assembly docking station (if required): a. Adjust the main screen and sub screen (if any) to the appropriate positions,
and open the wiring cover of the I/O interface cover on the main screen, as shown in Figure 4 on the right; b. Insert the TYPE-C cable of the docking station correctly into the column from the bottom of the base, and insert it correctly into the TYPE-C interface of the main screen I/O area. Secure it correctly with the screws on the TYPE-C cable head, as shown in Figure 5 on the right.
Figure 2
Documents / Resources
![]() |
SED Initta POS System [pdf] Installation Guide Z875, 2BM3A-Z875, 2BM3AZ875, POS System, POS, System |