M4TSUBISHI SC-WBGW256 Superlink WEB & BACnet Gateway Installation Guide
- This installation manual describes installation procedure and precautions for the gateway.
- Please also refer to the indoor unit’s manual, outdoor unit’s manual and other supplied manuals.
- For proper gateway installation, please read this manual carefully before starting installation work.
- The gateway must be installed in accordance with national wiring regulations.
- The gateway is precision equipment, so please handle it with enough care to prevent damage due to falling and being stepped on.
Safety Precautions
- Before starting the installation work, please read these “Safety Precautions” and follow them properly.
All of the following are important and must be observed strictly.
WARNING:
Failure to follow these instructions properly may result in serious consequences such as death and severe injury.
CAUTION:
Failure to follow these instructions properly may cause injury or property damage. There could be serious
consequences depending on the circumstances. - The following pictograms are used in the text.
Never do. Always follow the instructions given. - After the installation, please make a test run and confirm no abnormalities occur during the test run.
Please explain the operation method to the customers according to the user’s manual and product specifications. - Keep this manual in a safe place where users can consult it whenever needed. Show this manual to installers when moving or repairing the gateway. When the ownership of the gateway is transferred, this manual should be given to the new owner.
![]() |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
![]() |
|
|
|
|
|
Accessories
Gateway main unit, CD-ROMs (Manual and Energy consumption calculation software: 1 each), Round-type crimp-style terminals (Large: 2, Small: 4)
Installation Work
- Installation location
The installation location should be a cool place indoors with enough cooling air circulation. - Parts procured on site
Before installing the gateway, prepare the following parts.- Main body installation screws (M4) ×4
- Wiring (Refer to “4. Wiring”.)
- Leakage breaker (Cut-off device with a contact gap of 3 mm or more according to overvoltage category III)
- Installation procedure
Install the gateway in the orientation shown in the figure below and so that letters can be read correctly.
Any other orientation may cause cooling failure of internal parts that may result in a malfunction or breakdown.
- Installation clearances
For cooling and service work, provide the following clearances above and below and to the right and left.
Bottom clearance Min. 100 mm (Recommended length of 200 mm or more)・・・Space for wiring and service
Top clearance Min. 30 mm・・・・・・・・・・Space for cooling
Left clearance Min. 30 mm・・・・・・・・Space for cooling
Right clearance Min. 30 mm・・・・・・Space for cooling
For cooling and service work, provide the following clearances above and below and to the right and left.
Bottom clearance Min. 100 mm (Recommended length of 200 mm or more)・・・Space for wiring and service
Top clearance Min. 30 mm・・・・・・・・・・・・・・・・・・・・・・・Space for cooling
Left clearance Min. 30 mm・・・・・・・・・・・・・・・・・・・・・・・Space for cooling
Right clearance Min. 30 mm・・・・・・・・・・・・・・・・・・・・・・・Space for cooling
Wiring
- Use the supplied round-type crimp-style terminals (large) when connecting wires to the power supply terminal block.
- Do not use any supply cord lighter than one specified in below.
- Ordinary tough rubber sheathed cord (code designation 60245 IEC 53)
- Do not turn on the power supply (power switch) until all of the work is completed.
- Wait at least two minutes after the indoor and outdoor units are turned on before turning on the power supply.
- Except for the accessories, all of the components are obtained at the site.
- Before connecting the wires, remove the cover of the terminal block.
After the work is completed, return the cover of the terminal block to its original position.
The cover is used to prevent electric shock from accidental contact. - Perform grounding work. Wire the ground for the power supply to Grounding point (1), shown in the diagram for “3.4
Installation clearances”. - Use the Wiring clamp beside the power LED to fasten the wires connected to the power supply terminal block.
- When pulling out wires from the enclosure, secure or cover the wires with conduit to prevent tension from being applied to the terminals.
Superlink signal line
Shielded wire (2 core, 0.75 mm2 – 1.25 mm2)
Max. 1000 m per line (Max. distance: 1000 m, Total wire length: 1000 m)
Wire the ground for the Superlink system to Grounding point (2), shown in the diagram for “3.4 Installation clearances”.
Note 1: When the gateway is used, use a shielded wire as the Superlink signal wire. Ground both ends of the shielded wire.
Wire the ground of the gateway to Grounding point (2), shown in the diagram for “3.4 Installation clearances”.
Note 2: The communication protocol can be chosen from either of the following two types.
One is the conventional Superlink (denoted as previous Superlink below), and the other is the new Superlink. Choose either the new or previous setting for Superlink. (See user’s manual.) Whether the actual connection network is the new Superlink or previous Superlink depends on the type of connected indoor unit, outdoor unit, etc. Contact your sales representative or dealer for more information. If the indoor and outdoor units connected to the network are all compatible with the new Superlink, a total wire length of 1500 m per line is possible (maximum distance: 1000 m). However, be sure to use wire with a diameter of 0.75 mm2
if the total wire length exceeds 1000 m. For further information, please contact your sales representative or dealer.
Note 3: Be sure to use the supplied round-type crimp-style terminals (small) when connecting wires to the Superlink terminal block
Emergency stop line, gas meter or watt-hour meter line
Shielded wire 0.75 mm2 – 1.25 mm2
For safety reasons, use the round-type crimp-style terminals with insulated sleeves for connecting all wires to terminal blocks.
Wire as shown below
- Upper tier of terminal block
Power supply AC100/200-240 V 50/60 Hz - Lower tier of terminal block
Power input from gas meter or watt-hour meter (8 points)
Please connect a gas meter or a watt-hour meter that satisfies the specifications below.
- meter with pulse transmitter
- meter with pulse width of 80 ms or more
The energy consumption calculated by this gateway does not conform to OIML, and there are no guarantees concerning the results of the calculations.
For selecting the gas meter or the watt-hour meter, please refer to the technical manual.
Documents / Resources
![]() |