Leviton LP220-BPD

Leviton LP220-BPD 20 Space, 200 Amp 실내 로드 센터

사용 설명서

소개

This manual provides essential information for the safe and proper installation, operation, and maintenance of your Leviton LP220-BPD 20 Space, 20 Circuit Indoor Load Center with a 200 Amp Main Circuit Breaker. Please read all instructions carefully before beginning any work. This load center is designed for indoor use and is NEMA 1 rated. The enclosure and interior are included; the door is sold separately.

안전 정보

경고: Risk of electric shock or electrocution. Installation and servicing of this electrical equipment must be performed by a qualified electrician in accordance with all national and local electrical codes. Always turn off power at the main service disconnect before working on the load center. Use appropriate personal protective equipment (PPE).

제품 끝view

The Leviton LP220-BPD Load Center offers a modern, efficient solution for residential electrical distribution. Key features include:

Leviton LP220-BPD Load Center with dimensions

Image 1: Leviton LP220-BPD Load Center showing overall dimensions (14.25"L x 4"W x 30"H) and key specifications like 200 Amps, 20 Spaces/Circuits, Main Breaker Included, and NEMA 1 Indoor rating.

내부 view of Leviton LP220-BPD Load Center showing wiring features

이미지 2: 내부 view of the load center highlighting features such as notches for cable ties, white powder-coated finish, included main breaker, custom lugs for hot and neutral wires, tin-plated copper bussing, and invertibility for bottom feed applications.

설정 및 설치

Installation should only be performed by a qualified electrician. Follow all applicable electrical codes.

1. 부하 센터 설치

  1. Choose a suitable indoor location for flush or surface mounting, ensuring adequate clearance around the panel.
  2. Securely mount the load center enclosure to the wall studs or appropriate structural support.

2. Wiring at Rough-in

  1. With no circuit breakers present, neatly land all branch phase and neutral wires directly onto the panel's custom lugs.
  2. Utilize the stamped notches for cable ties to organize and secure wiring within the enclosure.
  3. Ensure all connections are tight and conform to torque specifications.

3. Installing Circuit Breakers

Leviton's plug-on design allows for quick and easy installation of circuit breakers.

  1. Align the Leviton circuit breaker with the desired space on the bussing.
  2. Firmly snap the breaker into place. No additional wiring is required for the breaker itself.
  3. Repeat for all necessary circuit breakers.
Hand installing a Leviton circuit breaker into the load center

Image 3: A hand demonstrating the plug-on installation of a Leviton circuit breaker into the load center, emphasizing the ease and speed of installation.

4. Main Breaker Customization

The modular panel design and 225 Amp rated bussing allow for in-field main breaker customization, providing flexibility for future upgrades.

Video 1: Official Leviton Load Center Video. This video demonstrates the key features and installation benefits of the Leviton Load Center, including the easy wiring at rough-in, plug-on circuit breakers, and modular design for future upgrades.

Operating the Load Center

Once installed, the load center operates like a standard electrical panel. Circuit breakers protect individual circuits from overcurrents and short circuits.

Resetting a Tripped Circuit Breaker

  1. Locate the tripped breaker, which will typically be in an intermediate position between 'ON' and 'OFF'.
  2. Firmly push the breaker handle to the full 'OFF' position.
  3. Then, push the handle to the full 'ON' position to restore power.
  4. If the breaker immediately trips again, there may be a persistent fault. Do not attempt to reset it repeatedly. Consult a qualified electrician.

유지

The Leviton Load Center requires minimal maintenance. Regular inspections by a qualified electrician are recommended.

Two types of Leviton load center doors, standard and window, sold separately

Image 4: Illustration of two types of doors for the Leviton Load Center: a standard solid door (LDC20) and a windowed door (LDC20-W), both sold separately.

문제 해결

For persistent electrical issues, always consult a qualified electrician.

문제가능한 원인해결책
회로 차단기가 자주 트립됩니다과부하 회로, 단락 회로, 접지 고장 또는 기기 결함.Reduce load on the circuit. Unplug appliances. If problem persists, consult an electrician.
회로에 전원이 공급되지 않음Tripped circuit breaker, loose connection, or power outage.Check and reset the circuit breaker. Verify main power supply. If issue continues, contact an electrician.
부하 중심부가 따뜻하게 느껴집니다.Normal operation under load, or potentially loose connections/overload.A slight warmth is normal. If excessively hot or accompanied by burning smell, immediately turn off main power and call an electrician.

명세서

기인하다세부 사항
상표레비톤
모델 번호LP220-BPD
제품 치수14.25인치 길이 x 4인치 너비 x 30인치 높이
AC 어댑터 전류200 Amps
재료구리
회로 수20
단계 유형단상
품목 무게22.7파운드
한국어:078477996188

Smart Home Integration (Optional)

The Leviton Load Center is compatible with optional smart upgrades, allowing for enhanced energy management and control. This includes the ability to install Leviton Whole Home Energy Monitors and 2nd Gen Smart Circuit Breakers, which can be enrolled in the My Leviton App.

Diagram showing steps for Leviton smart home integration

Image 5: A diagram illustrating the three steps for smart home integration: 1) Install the Leviton Whole Home Energy Monitor, 2) Snap in 2nd Gen Smart Circuit Breakers, and 3) Enroll Breakers in the My Leviton App.

보증 및 지원

For specific warranty details and customer support, please refer to the official Leviton website or contact Leviton customer service directly. Keep your purchase receipt for warranty claims.

Leviton offers various protection plans for their products. For more information on available protection plans, please visit the Leviton web사이트를 방문하거나 판매점에 문의하세요.

관련 문서 - LP220-BPD

사전view Leviton Load Center Enclosure Installation Instructions
Detailed installation instructions for Leviton Load Center Enclosures, models LP2xx, LP3xx, LP4xx, and LP6xx. Covers safety, knockout removal, mounting, wiring, branch circuit breaker installation, and cover fitting.
사전view Leviton 부하 센터 위상 맵 설치 가이드
This guide provides phase map illustrations to simplify the installation of the Leviton Whole Home Energy Monitor (LWHEM). It details where to terminate power wires and mount the Smart Mains Metering Accessory CTs for monitoring whole-home energy consumption.
사전view Leviton 앱 사용법: 스마트 홈 기기 제어하기
마이 레비톤 앱 가이드를 통해 데코라 스마트 Wi-Fi 기기와 레비톤 스마트 차단기가 탑재된 부하 센터를 간편하게 등록, 통합 및 맞춤 설정하여 원활한 스마트 홈 제어를 경험해 보세요.
사전view Leviton GFCI 콘센트 설치 및 테스트 가이드
Leviton SmartLock Pro GFCI 콘센트의 설치 및 테스트 방법에 대한 종합 가이드로, 배선 지침, 안전 예방 조치 및 문제 해결 팁을 포함합니다.
사전view Leviton 앱 가이드: Decora 스마트 Wi-Fi 및 부하 센터를 위한 스마트 홈 제어
Leviton Decora 스마트 Wi-Fi 장치 및 스마트 차단기가 장착된 Leviton 부하 센터를 관리하는 데 사용할 수 있는 My Leviton 앱에 대한 종합 가이드입니다. 설정, 일정, 활동, 장치 설정, 대시보드 사용자 지정, 에너지 모니터링 및 고객 지원을 다룹니다.
사전view My Leviton App Guide: Decora Smart Wi-Fi and Load Center
A comprehensive guide to using the My Leviton app for managing Leviton Decora Smart Wi-Fi devices and Leviton Load Centers with Smart Breakers. Learn about setup, device management, scheduling, energy monitoring, and customer support.