ViewSonic LDP136-071C ទាំងអស់ក្នុងមួយផ្ទាល់ View អេក្រង់ LED

លក្ខណៈបច្ចេកទេស
- ម៉ូដែល៖ LDP136-071C
- ប្រភេទ៖ All-in-One Direct View អេក្រង់ LED
- ការអនុលោមតាម៖ FCC, Industry Canada, CE, RoHS2
ការណែនាំអំពីការប្រើប្រាស់ផលិតផល
- មាតិកាកញ្ចប់៖
- មុនពេលដំឡើង៖
- Use pliers to open the shipping crate.
- Wear protective gear like gloves and shoes.
- ពិនិត្យសមាសធាតុ៖
- Ensure all components are included in the crate.
- Identify contents using product labels.
- If anything is missing or damaged, contact your dealer.
- មុនពេលដំឡើង៖
- សមាសធាតុ៖
- Cabinet Sections:
- 5 sections total: One Left (A), three Middle (B, C, D), and one Right (E)
- LED Modules:
- 200 modules included
- Cabinet Sections:
- System Control Box Maintenance:
- Maintenance tools provided for system control box and LED modules.
- ការដំឡើងជញ្ជាំង៖
- Use wall mount brackets and connector plates for installation.
- ការបញ្ជាពីចម្ងាយ៖
- Comes with two AAA batteries for operation.
សំណួរគេសួរញឹកញាប់
Q: Are installation accessories included in the package?
A: Installation accessories are optional and sold separately. Contact your dealer for more information.
Q: How many LED modules are included in the package?
A: The package includes 200 LED modules.
“`
LDP136-071C
All-in-One Direct View អេក្រង់ LED
Installation Guide Guide de démarrage rapide Schnellstartanleitung Guía rápida de inicio
ទទេ យល់ព្រម
ភាសាអង់គ្លេស
សេចក្តីថ្លែងការណ៍អនុលោមតាម FCC
This device complies with part 15 of FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. Industry Canada ICES-003 Statement: CAN ICES (B) / NMB (B)
ការអនុលោមតាម CE សម្រាប់បណ្តាប្រទេសអ៊ឺរ៉ុប ឧបករណ៍អនុលោមតាមការណែនាំរបស់ EMC 2014/30/EU, Low Voltage សេចក្តីណែនាំ 2014/35/ សហភាពអឺរ៉ុប និងសេចក្តីណែនាំអំពីឧបករណ៍វិទ្យុ 2014/53/EU ។
សេចក្តីប្រកាសនៃការអនុលោមតាម RoHS2
ផលិតផលនេះត្រូវបានរចនា និងផលិតដោយអនុលោមតាមសេចក្តីណែនាំ 2011/65/ EU នៃសភាអឺរ៉ុប និងក្រុមប្រឹក្សាស្តីពីការរឹតបន្តឹងការប្រើប្រាស់សារធាតុគ្រោះថ្នាក់មួយចំនួននៅក្នុងឧបករណ៍អគ្គិសនី និងអេឡិចត្រូនិក (សេចក្តីណែនាំ RoHS2) ហើយត្រូវបានចាត់ទុកថាអនុលោមតាមតម្លៃកំហាប់អតិបរមាដែលចេញដោយគណៈកម្មាធិការសម្របសម្រួលបច្ចេកទេសអឺរ៉ុប (TAC)។
សម្រាប់អ្នកប្រើប្រាស់សហភាពអឺរ៉ុប សូមទាក់ទងមកយើងខ្ញុំសម្រាប់បញ្ហាសុវត្ថិភាព/គ្រោះថ្នាក់ណាមួយដែលមានបទពិសោធន៍ជាមួយផលិតផលនេះ៖
ViewSonic Europe Limited Haaksbergweg 75 1101 BR Amsterdam ហូឡង់ +31 (0) 650608655 EPREL@viewsoniceurope.com https://www.viewsonic.com/eu/
3
ភាសាអង់គ្លេស
មាតិកាកញ្ចប់
It is recommended to use pliers to open the shipping crate. Please wear protective gear, such as gloves and protective shoes, at all times.
Before the installation, please take a moment to check if all components are included in the crate. The contents inside the case can be identified by the product labels on it. If anything is missing or damaged, contact your dealer immediately.
ធាតុ
ការណែនាំអំពីការដំឡើង
បរិមាណ ៤
ចំណាំ
ផ្នែកគណៈរដ្ឋមន្ត្រី
សរុប ៨ ផ្នែក
One Left (A), three Middle (B, C, D), and one Right (E)
ម៉ូឌុល LED
Screen Bezels
ប្រអប់ត្រួតពិនិត្យប្រព័ន្ធ
ប្រអប់ត្រួតពិនិត្យប្រព័ន្ធ
គម្រប
(2) (1)
(4) (3)
OK
200 ម៉ូឌុល
10
បរិមាណនៃម៉ូឌុល LED ទំនេរប្រែប្រួលទៅតាមប្រទេស។
1 x Top Left (1) 4 x Left (2) 1 x Top Right (3) 4 x Right (4)
2 ជ្រុង
2 ជ្រុង
បន្ទះតភ្ជាប់
1
4
ភាសាអង់គ្លេស
ធាតុ
System Control Box Maintenance
ឧបករណ៍
LED Module Maintenance
ឧបករណ៍
តង្កៀបជញ្ជាំងម៉ោន
ឧបករណ៍ភ្ជាប់ជញ្ជាំង
ចាន
ខ្សែបន្ថែម IR
បរិមាណ
ចំណាំ
1
P/N: LD-MK-004
1
P/N: LD-MK-006
(១៦១៦)
(១៦១៦)
4
2 x 1799 mm (1) 2 x 1199 mm (2)
2
1
3 ម។
ខ្សែអ៊ីសឺរណិត
ឧបករណ៍ដៃ
គ្រាប់និងប៊ូឡុង
ស្រោមដៃប្រឆាំងនឹងឋិតិវន្ត
1
3.5 ម។
(១០០) (១១១) (១១០)
(១៦១៦)
(១៦១៦)
(១៦១៦)
(១៦១៦)
(១៦១៦)
2 x Cabinet magnet adjustment tools (1) 2 x Cross-head screwdrivers (2) 1 x T-line hex wrench (3)
40 x M8 x 80 mm expansion (1) 10 x M8 x 20 mm (2) 12 x 6 x 10 mm (3) 6 x M3 x 6 mm (4) 5 x M2.5 x 4 mm (5)
2 គូ
5
ភាសាអង់គ្លេស
ការបញ្ជាពីចម្ងាយ
ធាតុ
ទទេ យល់ព្រម
បរិមាណ
ចំណាំ
1
With two AAA batteries
1.5V
1.5V
ប្រព័ន្ធ
ប្រអប់ត្រួតពិនិត្យ
10
ចន្លោះ
ចំណាំ៖
· This product is packed in a wooden crate. · Due to the size and weight, it is recommended that two or more people
handle it. · The base stand (trolley) and the accessories for Hidden and Separate
Installation are optional. They are sold separately.
6
ភាសាអង់គ្លេស
គ្រឿងបន្លាស់ស្រេចចិត្ត
The accessories below are for the LED Display installed on the trolley or with the either hidden or separate System Control Box layout. These accessories are sold separately. If you are not sure of which ones to order, consult your dealer for technical support or product service.
Base Stand (Trolley)
ធាតុ
បរិមាណ
ចំណាំ
គាំទ្រ
2
ឆ្វេងនិងស្តាំ
Cross Beams
Cabinet Brackets Screws
2
ខាងលើ និងខាងក្រោម
2 56 x M8 x 20 mm
7
ភាសាអង់គ្លេស
ការដំឡើងលាក់
ធាតុ
តង្កៀបជញ្ជាំងម៉ោន
Screen Bezels
System Control Box Mount Brackets
ខ្សែហ្ស៊ីប
ខ្សែអ៊ីសឺរណិត
Cabinet Power Cables
(១៦១៦)
(2) (3)
(១៦១៦)
(១៦១៦)
(1) (2)
បរិមាណ
ចំណាំ
4
1335 ម។
5 x Bottom (1)
7
1 x Bottom Left (2)
1 x Bottom Right (3)
4
2 x Upper (1) 2 x Lower (2)
20
15
4.8 ម។
2
1 x 3482 mm (1) 1 x 5193 mm (2)
8
ភាសាអង់គ្លេស
ការដំឡើងដាច់ដោយឡែក
Item System Control Box Top Cover
Screen Bezels
(១៦១៦)
ខ្សែហ្ស៊ីប
ខ្សែបន្ថែម IR
ខ្សែអ៊ីសឺរណិត
Cabinet Power Cables
ឧបករណ៍ភ្ជាប់
(2) (3)
(1) (2)
Quantity 2 sides
ចំណាំ
5 x Bottom (1)
7
1 x Bottom Left (2)
1 x Bottom Right (3)
20
1
10 ម។
15
15 ម។
2
1 x 13 m (1) 1 x 15 m (2)
3 ឈុត
9
ភាសាអង់គ្លេស
ផលិតផលលើសview
បន្ទះខាងមុខ
បន្ទះខាងក្រោយ
I/O & Control Panel
10
ភាសាអង់គ្លេស
សេចក្តីផ្តើម
The step-by-step instructions in this guide are a general reference for installing the LED Display. If any details in this document are unclear, please contact your reseller for more information. Ensure your LED Display is installed and grounded properly by a qualified installer or serviceperson.
អំពីអេក្រង់ LED
The LED Display can be installed on the wall or on a trolley.
USB C
USB 3.0
USB 2.0
OK
ការដំឡើងជញ្ជាំង
Trolley1
You can mount the System Control Box in three different ways:
USB C
USB 3.0
USB 2.0
OK
Under the Cabinets (Standard Installation)
Behind the Cabinets (Hidden Installation)
Apart from the Cabinets (Separate Installation)
1 Hidden and Separate Installation are not applicable to the trolley.
11
ភាសាអង់គ្លេស
មុនពេលដំឡើង
Read these instructions carefully, keep them in a safe place, and follow all warnings and instructions.
ការប្រុងប្រយ័ត្នសុវត្ថិភាពទូទៅ
· Ensure there is no direct airflow from air conditioning or heating vents blowing on the LED Display.
· Always wear protective gear, such as gloves and protective shoes, when handling the LED Display.
· Electrical connections, and all associated servicing or adjusting, should only be performed by a qualified electrician approved or licensed as required by the locality.
ការដំឡើង
· Avoid installing the LED Display in places with high humidity. · Ensure that the wall can safely support 100 kg and the power outlet supplies enough
វ៉ុលtage (max: 2031W; normal: 680W). · Ensure the deviation of the wall surface is < 5 mm. · Wood may split if holes are not pre-drilled before installing the Wall Mount Brackets.
System Control Box Power Cable Safety
· Due to high power usage, always use the power cord(s) specifically designed for this product.
· Do not damage or modify the Power Cable(s). · Do not use extension cords. If the Power Cable(s) are too short, have a qualified
electrician install an outlet near the LED Display.
រទេះរុញ
· Do not move the trolley over cords or uneven, dirty, soft, or high incline surfaces. · To avoid injury, KEEP AWAY from moving parts. · Do not move the trolley by pushing on the LED Display. · Do not push the trolley from the front of the LED Display or attempt to lift it.
12
ភាសាអង់គ្លេស
Wall Mounting (Standard Installation)
The Wall Mount Brackets come in with two different lengths. You need two of each to mount the screen to the wall.
The Left (1199 mm) and Right (1799 mm) Wall Mount Brackets
156 ម។
1199 ម។
1 ម។
1799 ម។
156 ម។
300 មម 300 មម 300 មម
300 មម 300 មម 300 មម 300 មម 300 មម
Ø 6 ម។
Ø 10.5 ម។
300 ម។
35 ម។
1. Ensure the wall area is an appropriate installation site.
ចំណាំ៖ សូមមើលទំព័រ 15 សម្រាប់ព័ត៌មានបន្ថែម។
2. Using the illustration as shown above as a guide, mark at least 10 mounting holes and pre-drill them.
NOTE:To ensure the marks are perfectly horizontal, it is recommended to use a laser or torpedo level.
3. Install the Left Upper Wall Mount Bracket with the provided screws (M8 x 80 mm Expansion for masonry; wood screws for load bearing wood).
4. Repeat Step 3 for the Right Upper Wall Mount Bracket. 5. After mounting the Left and Right Upper Wall Mount Brackets to the wall, secure
them with the Wall Mount Connector Plate using the six provided screws (M6 x 10 mm).
6. Install the Lower Wall Mount Brackets in the same manner as the Upper Wall Mount Brackets. The distance between the Upper and Lower Wall Mount Brackets is 675 mm.
13
ភាសាអង់គ្លេស
7. បន្ទាប់ពីដំឡើងតង្កៀបជញ្ជាំងខាងលើ និងខាងក្រោម ជញ្ជាំងដំឡើងគួរតែមើលទៅដូច៖
After the Wall Mount Brackets are installed, please go to page 27 for the Cabinets (Standard Installation).
14
ភាសាអង់គ្លេស
Spacing Instructions for Wall Installation (Standard Installation)
31.3 ម។
Min 50 mm (ceiling) 111 mm
W Display a
នឹង
52.8 ម។
675 មម 702.7 ម។
Min 3100 mm (clearance)
ចំណាំ៖
· You can also install the Upper Wall Mount Brackets, hang the screen, and then install the Lower Wall Mount Brackets for a more precise fit.
· Adjustment in floor clearance and ceiling height should be made according to the actual installation site.
15
ភាសាអង់គ្លេស
Trolley Mounting
NOTE:The trolley is compatible only with ViewSonic ផ្ទាល់ View LDP136-151C, LDP136-071C, and LDP136-091C. Using the trolley with other models may cause instability and injury.
វិមាត្ររទេះភ្លើង
6 ម។
2999 ម។
6 ម។
827.2 ម។
31.3 ម។
3012 ម។
21.5 មម 52.8 ម។
1833.5 ម។
2493.4 មម 2031.1 ម។
341.8 មម 530.4 ម។
2180 ម។
872.2 ម។
16
Building the Trolley
1. Pull down the brake locks of the four rollers until you feel the brakes click into locked position.
ភាសាអង់គ្លេស
2. Install the Top and Bottom Cross Beams to the Left and Right Supports. Secure them together with the provided screws (M8 x 20 mm).
ធ្នឹមឈើឆ្កាងកំពូល
Right Support Bottom Cross Beam
ជំនួយខាងឆ្វេង
Building the Trolley (Rear View)
17
ភាសាអង់គ្លេស
3. Connect the Left and Right Upper Wall Mount Brackets using the Wall Mount Connector Plate with the six provided screws (M6 x 10 mm).
4. Install the Upper Wall Mount Brackets to the Top Cross Beam with the provided screws (M8 x 20 mm).
18
ភាសាអង់គ្លេស
5. Install the Cabinet Brackets to the lower side of the Left and Right Supports with the provided screws (M8 x 20 mm), but do not tighten them. This allows the Brackets to rotate when installing the Cabinets.
NOTE: · There are two Cabinet Brackets to install. · Ensure it is the longer side of the Cabinet Brackets (the side with a visible elongated slot) installed to the Left and Right Supports. Install screws
19
ភាសាអង់គ្លេស
6. Connect the Left and Right Lower Wall Mount Brackets using the Wall Mount Connector Plate with the six provided screws (M6 x 10 mm).
7. Install the Lower Wall Mount Bracket to the Bottom Cross Beam with the provided screws (M8 x 20 mm).
20
ភាសាអង់គ្លេស
8. Rotate the two Cabinet Brackets 180°, ensuring the short side of the Brackets is facing upward. The Cabinet Brackets are used later for further securing the lower part of the Cabinets to the trolley. 180°
After the trolley is built, please go to page 30 for the Cabinets (Trolley Installation).
21
ភាសាអង់គ្លេស
Wall Mounting (Hidden Installation)
When the System Control Box is installed behind the Cabinets, this installation type requires a different set of Wall Mount Brackets. You also need the System Control Box Mount Brackets to attach the System Control Box to the rear of the Cabinets.
ការដំឡើងជញ្ជាំង
Four Wall Mount Brackets are used for mounting the screen to the wall. Installing the Upper and Lower Wall Mount Brackets
1335 ម។
65 ម។
1335 ម។
300 មម 300 មម 300 មម
300 មម 300 មម 300 មម
6Ø mm
Ø 10.5 ម។
700 ម។
35 ម។
1. Ensure the wall area is an appropriate installation site.
ចំណាំ៖ សូមមើលទំព័រ 24 សម្រាប់ព័ត៌មានបន្ថែម។
2. Using the illustration as shown above as a guide, mark at least eight mounting holes and pre-drill them.
NOTE:To ensure the marks are perfectly horizontal, it is recommended to use a laser or torpedo level.
3. Install the first Upper Wall Mount Bracket with the provided screws (M8 x 80 mm Expansion for masonry; wood screws for load bearing wood).
4. Repeat Step 3 for the second Upper Wall Mount Bracket.
5. Install the Lower Wall Mount Brackets in the same manner as the Upper Wall Mount Brackets. The distance between the Upper and Lower Wall Mount Brackets is 675 mm.
22
ភាសាអង់គ្លេស
6. បន្ទាប់ពីដំឡើងតង្កៀបជញ្ជាំងខាងលើ និងខាងក្រោម ជញ្ជាំងដំឡើងគួរតែមើលទៅដូច៖
After the Wall Mount Brackets are installed, please go to page 33 for the Power and Network Cables of the Cabinets (Hidden and Separate Installation).
NOTE:The Power and Network Cables of each Cabinet must be connected before installing the Cabinets.
23
ភាសាអង់គ្លេស
Spacing Instructions for Wall Installation (Hidden Installation)
31.3 ម។
Min 50 mm (ceiling) 114 mm
W a l l
បង្ហាញ
90.8 ម។
675 មម 570 ម។
Min 3100 mm (clearance)
ចំណាំ៖
· You can also install the Upper Wall Mount Brackets, hang the screen, and then install the Lower Wall Mount Brackets for a more precise fit.
· Adjustment in floor clearance and ceiling height should be made according to the actual installation site.
24
ភាសាអង់គ្លេស
Wall Mounting (Separate Installation)
When the System Control Box is installed apart from the Cabinets, this installation type uses the same Wall Mount Brackets as the Standard Installation. However, you will need to pre-drill additional holes for the System Control Box.
Drill Hole Spacing for System Control Box Ensure there is enough space between the mounting holes and cable access holes.
Ø 80 មម 59.8 ម។
Ø 80 ម។
403.5 ម។
976 ម។
702 ម។
401 មម Ø 12 ម។
1187 ម។
Ø 12 ម។
1023 មម Ø 12 ម។
1. Please follow Step 2~6 on page 13 for the Upper and Lower Wall Mount Brackets.
NOTE:To ensure the wall area is suitable for installation, refer to page 26 for more details.
2. Use the illustration as shown above as a guide to mark the following holes and pre-drill them. · At least three mounting holes for the System Control Box. · Three cable access holes, one at the top and two at the bottom. The distance between the Lower Wall Mount Bracket and the top cable access hole is 59.8 mm.
25
ភាសាអង់គ្លេស
After the Wall Mount Brackets are installed, please go to page 33 for the Power and Network Cables of the Cabinets (Hidden and Separate Installation).
NOTE:The Power and Network Cables of each Cabinet must be connected before installing the Cabinets.
Spacing Instructions for Wall Installation (Separate Installation)
31.3 ម។
Min 50 mm (ceiling) 111 mm
W Display a
នឹង
ប្រអប់ត្រួតពិនិត្យប្រព័ន្ធ
37.5 ម។
675 មម 569 ម។
Min 3100 mm (clearance)
ចំណាំ៖
· You can also install the Upper Wall Mount Brackets, hang the screen, and then install the Lower Wall Mount Brackets for a more precise fit.
· Adjustment in floor clearance and ceiling height should be made according to the actual installation site.
26
ភាសាអង់គ្លេស
Installing the Cabinets (Standard Installation)
1. Carefully lift Cabinet “C” onto the center of the Upper Wall Mount Brackets.
NOTE: · One Cabinet, composed of five sections, weighs around 19.2 kg. · You can identify Cabinets by the labels on the package and Cabinets. · The arrow marks should be pointing down.
27
ភាសាអង់គ្លេស
2. ត្រូវប្រាកដថាតង្កៀបម៉ោនអង្គុយដោយសុវត្ថិភាពនៅលើតង្កៀបជញ្ជាំងដូចបានបង្ហាញខាងក្រោម។
បង្ហាញ
Mounting Brackets Wall Mount Brackets
3. Lift Cabinet “B” and install it on the left side of Cabinet “C”. Push each locking hook with the provided hex wrench to securely connect the two Cabinets together.
NOTE:There are five locking hooks between each Cabinet.
28
ភាសាអង់គ្លេស
4. Check for unevenness of the Cabinets by rubbing the cross section between each Cabinet. If the cross section is not aligned, loosen the locking hook slightly and tap the Cabinets until the cross section is flat.
5. Place the remaining Cabinets onto the Wall Mount Brackets. Install from the center to the right and left sides of the Wall Mount Brackets. NOTE:The installation sequence by Cabinet: C B D A E
Cabinet A Cabinet B Cabinet C Cabinet D Cabinet E After all Cabinets are installed, please go to page 40 for the System Control Box (Standard and Trolley Installation).
29
ភាសាអង់គ្លេស
Installing the Cabinets (Trolley Installation)
1. Place Cabinet “C”, Cabinet “B”, and Cabinet “D” facing down on stable furniture that can safely support three Cabinets. NOTE: · One Cabinet, composed of five sections, weighs around 19.2 kg. · You can identify Cabinets by the labels on the package and Cabinets.
2. Prepare Cabinet “C” by removing its Mounting Bracket and installing the Bracket to the lowest row of the Cabinet.
3. Repeat Step 2 for the other two Cabinets “B” and “D”. 4. Please follow Step 1~4 on page 27~29 for Cabinet “C”, Cabinet “B”, and Cabinet
“D”. NOTE:Ensure the Mounting Brackets sit securely on the Wall Mount Brackets. 5. Remove the Mounting Brackets of the remaining two Cabinets “A” and “E”.
30
ភាសាអង់គ្លេស
6. After removing the Mounting Brackets, place the Cabinets “A” and “E” onto the Wall Mount Brackets. Start with Cabinet “A” then “E”.
7. Adjust the left Cabinet Bracket until it is aligned with the hole provided in the Cabinet. Then, properly tighten the M8 nut on the Left Support to lock the position.
8. Secure the left Cabinet Bracket to the Cabinet with the provided screw (M8 x 20 mm).
31
ភាសាអង់គ្លេស
9. Install the right Cabinet Bracket in the same manner as the left Cabinet Bracket. 10. Ensure all parts are accurately and securely held together, as shown in the diagram
ខាងក្រោម។
NOTE:When you use the trolley for your LED Display, the System Control Box can only be installed under the Cabinets (Standard Installation). Hidden and Separate Installation are not applicable to the trolley.
After all Cabinets are installed, please go to page 40 for the System Control Box (Standard and Trolley Installation).
32
ភាសាអង់គ្លេស
Routing and Connecting the Power and Network Cables (Hidden and Separate Installation)
1. Prepare the following two items. · 2 x Power Cables. · 15 x Network Cables. NOTE:Ensure the Cables prepared are of the correct length for your installation type.
2. Prepare the rubber hole plugs installed on the second row of the Cabinets by cutting the hole to size along the cross. The rubber hole plugs are used to protect the cables from rubbing against any pointed edges. NOTE:The rubber hole plugs must always be placed in the holes.
33
ភាសាអង់គ្លេស
3. Thread the connector end of the Power Cable of each Cabinet through the hole at the second row of the corresponding Cabinet to the front of the Cabinets. Then, thread one end of the Network Cable of each Cabinet in the same manner as the Power Cable.
ចំណាំ៖
· Avoid sharp bends or twists in the Cables. · There are five Power and 15 Network Cables (three per one Cabinet) to
ខ្សែស្រឡាយ។
គណៈរដ្ឋមន្ត្រី E
គណៈរដ្ឋមន្ត្រី ឃ
គណៈរដ្ឋមន្ត្រី គ
គណៈរដ្ឋមន្ត្រី ខ
គណៈរដ្ឋមន្ត្រី ក
E
D
C
B
A
អ៊ី-៤០
ឃ-2
គ-០១
ខ-១០
ក-១០០
អ៊ី -៨៨១ អ៊ី -៩៩១
ឃ-៤ ឃ-៦
C-1 C-3
B-1 B-3
A-1 A-3
ខាងក្រោយ View of the Cabinets
34
4. On the front of the Cabinets, connect the Power Cables to the appropriate power connectors on the lowest row of the Cabinets. Then, ground each Power Cable by installing its ground wire onto a rob provided in the Cabinets with the provided screw (M3 x 6 mm).
NOTE:There are five Power Cables and five ground wires to connect and install.
ភាសាអង់គ្លេស
5. Connect the Network Cables of the Cabinets to the network ports of the Cabinets.
ចំណាំ៖
· There are 15 Network Cables (three per one Cabinet) to connect. · Ensure the Network Cables labeled with “-1” are connected to the first row
of the Cabinets, the Cables labeled with “-2” to the third row, and the Cables labeled with “-3” to the fifth row.
ក-១០០
ខ-១០
គ-០១
ឃ-1
អ៊ី-៤០
1st row 2nd row
3rd row
ក-១០០
ខ-១០
គ-០១
ឃ-2
អ៊ី-៤០
4th row
ក-១០០
ខ-១០
គ-០១
ឃ-3
អ៊ី-៤០
5th row
After connecting all cables and wires, please go to page 36 (Hidden Installation) or page 38 (Hidden Installation) for the Cabinets.
35
ភាសាអង់គ្លេស
Installing the Cabinets (Hidden Installation)
Before installing the Cabinets, ensure that the Power and Network Cables of the Cabinets have already connected. Go to page 33 for how to route and connect the Power and Network Cables. 1. Place Cabinet “B” and Cabinet “D” facing down on stable furniture that can safely
support the two Cabinets. NOTE:
· One Cabinet, composed of five sections, weighs around 19.2 kg. · You can identify Cabinets by the labels on the package. · The arrow marks should be pointing down.
2. Install the Upper System Control Box Mount Brackets to the side of the two Cabinets “B” and “D” as shown below using the provided screws (M8 x 20 mm).
ខាងក្រោយ View of Cabinet “B” (right) and Cabinet “D” (left)
36
3. Carefully lift Cabinet “C” onto the center of the Upper Wall Mount Brackets.
ភាសាអង់គ្លេស
4. ត្រូវប្រាកដថាតង្កៀបម៉ោនអង្គុយដោយសុវត្ថិភាពនៅលើតង្កៀបជញ្ជាំងដូចបានបង្ហាញខាងក្រោម។
តង្កៀបម៉ោន
បង្ហាញ
តង្កៀបជញ្ជាំងម៉ោន
5. Please follow Step 3~4 on page 28~29 for the remaining Cabinets. The installation sequence by Cabinet: C B D A E
After all Cabinets are installed, please go to page 47 for the System Control Box (Hidden Installation).
37
ភាសាអង់គ្លេស
Installing the Cabinets (Separate Installation)
Before installing the Cabinets, ensure that the Power and Network Cables of the Cabinets have already connected. Go to page 33 for how to route and connect the Power and Network Cables. 1. Please follow Step 1~2 on page 27~28 for Cabinet “C”. 2. Carefully thread the other end of the Power Cable of the Cabinets behind the
Cabinets from the top cable access hole through the bottom cable access hole on the left.
38
ភាសាអង់គ្លេស
3. Carefully thread the other end of the Network Cable of the Cabinet “C” in the same manner as the Power Cable, but run the Network Cable through the bottom cable access hole on the right instead. NOTE:There are three Network Cables to thread.
4. Please follow Step 1~4 on page 28~29 for Cabinet “B”. 5. Repeat Step 1~3 for the other Power Cable and the Network Cables of the Cabinet
“B”. 6. Place the remaining Cabinets onto the Wall Mount Brackets and thread the Network
Cables through the bottom cable access hole on the right in the same manner as the first two Cabinets. NOTE:
· There are nine Network Cables (three per one Cabinet) to thread. · The installation sequence by Cabinet: C B D A E After all Cabinets are installed, please go to page 52 for the System Control Box (Separate Installation).
39
ភាសាអង់គ្លេស
ការភ្ជាប់ប្រអប់ត្រួតពិនិត្យប្រព័ន្ធ
Connecting the System Control Box (Standard and Trolley Installation)
ផ្នែកខាងឆ្វេង និងខាងស្តាំនៃប្រអប់ត្រួតពិនិត្យប្រព័ន្ធត្រូវបានដំឡើងជាមុនជាមួយនឹងគម្របរបស់វានៅក្នុងរោងចក្រ។ បន្ទះត្រួតពិនិត្យប្រព័ន្ធសំខាន់គឺនៅខាងស្តាំ។
The safety wires are used to prevent the Right Cover from falling when accessing the System Control Box. Please ensure that the safety wires are never removed. Use caution as the System Control Box panel is separated into two pieces with wires attached.
ខ្សភ្លើងសុវត្ថិភាពបន្ទះភ្ជាប់
គម្របខាងឆ្វេង
បន្ទះដែកគម្របខាងស្តាំ
បន្ទះត្រួតពិនិត្យប្រព័ន្ធចម្បង 1. ដាក់ប្រអប់ត្រួតពិនិត្យប្រព័ន្ធដោយប្រុងប្រយ័ត្នលើគ្រឿងសង្ហារឹមដែលមានស្ថេរភាពដែលអាចទ្រទ្រង់ប្រព័ន្ធសុវត្ថិភាព
System Control Box. 2. To open the Right Cover, slowly bring the supplied System Control Box Maintenance
Tool near the surface of the Right Cover where the steel plate is located. Then, the Right Cover should detach from the System Control Box magnetically.
កុំព្យាយាមដក ឬផ្តាច់ខ្សែសុវត្ថិភាព។ សូមប្រាកដថាខ្សែសុវត្ថិភាពមិនត្រូវបានដកចេញឡើយ។
ឧបករណ៍ថែទាំប្រអប់ត្រួតពិនិត្យប្រព័ន្ធ
40
ភាសាអង់គ្លេស
3. ដោះគម្របខាងឆ្វេងដោយចាប់គែមខាងលើនៃគម្រប ហើយទាញវាមករកអ្នក។ គម្របខាងឆ្វេងគួរតែលើកចេញ។
4. ធានាសុវត្ថិភាពបន្ទះប្រអប់ត្រួតពិនិត្យប្រព័ន្ធជាមួយនឹងបន្ទះឧបករណ៍ភ្ជាប់ដោយប្រើវីសដែលបានផ្តល់ (M3 x 6 mm)។
5. ធានាបន្ថែមទៀតនូវបន្ទះឧបករណ៍ភ្ជាប់ជាមួយនឹងវីសដែលបានផ្តល់ពីរ (M3 x 6 mm)។
41
ភាសាអង់គ្លេស
6. Align the holes of the Cabinets with the System Control Box to attach. 7. Carefully route the Power and Network Cables through the holes in each Cabinet.
8. Install the System Control Box to the bottom of the Cabinets with the provided screws (M8 x 20 mm). NOTE:There are 10 threaded holes between the Cabinets and the System Control Box.
9. Slide a System Control Box Spacer on the M8 screw as shown below. Then, secure the Spacer with the provided screw (M3 x 8 mm) to connect the System Control Box with the Cabinets firmly. NOTE:There are 10 System Control Box Spacers to install.
42
ភាសាអង់គ្លេស
10.Connect the Power and Network Cables from the System Control Box to each Cabinet. Ensure the labels on the Cables match the cabinet labels (A to A, B to B, C to C, and so on).
ចំណាំ៖
· Each Cabinet has one Power and three Network Cables to connect. · Ensure the Network Cables labeled with “-1” are connected to the first row
of the Cabinets, the Cables labeled with “-2” to the third row, and the Cables labeled with “-3” to the fifth row. · Connect the Power Cables only to the bottom of each Cabinet.
2
2
2
2
2
1st row 2nd row
3rd row
2
2
2
2
2
4th row
1
1
1
1
1 5th row
2
2
2
2
2
៦៧ ៨
1
លេខ
ខ្សែ
រូបភាព
ខ្សែថាមពល ៦៣
៦ ខ្សែបណ្តាញ
43
ភាសាអង់គ្លេស
11. Connect the left system control board to the main system control board. 12.Connect the LED Display’s left speaker to the Audio Out port of the system control
board. NOTE:Ensure the right speaker is properly connected to the other Audio Out port.
Audio Out ports
44
ភាសាអង់គ្លេស
13.Ensure the AC unit of the System Control Box is properly connected. DO NOT connect the System Control Box Power Cables at this time.
System Control Box Power Cables · The neutral wires (usually white/blue) are connected to the “N1”, “N2”, and
“N” terminals. · The hot wires (usually black/brown) are connected to the “L1”, “L2”, and “L”
terminals. · The input and output terminals are properly grounded (2 x AC OUT and 1 x
AC IN, usually in green-yellow/green). The meaning of wiring color may vary by country.
AC OUT to Cabinets “A”~”E”
AC OUT AC IN L1 N1 L2 N2 N N L L
Ground (AC OUT) Ground (AC IN)
អេស៊ីអ៊ី
45
AC ចេញ
L1 N1 L2 N2
ភាសាអង់គ្លេស
14.Locate and route the System Control Box’s ground wire (usually in green-yellow/ green) through the hole and into the Cabinet. Then, remove the pre-installed screw on the rod as shown below, connect the ground wire to the rod, and properly secure the wire with the screw.
15. After connecting all cables and wires, hold the top edge of the Right Cover toward the System Control Box to replace it. Once the Right Cover is replaced, it will be held in place magnetically. NOTE:Ensure the Power Button cable is connected before securing the Right Cover.
16.Replace the Left Cover by aligning it properly with the System Control Box; then the Left Cover should attach magnetically.
After the System Control Box is connected, please go to page 54 for the LED Modules.
46
ភាសាអង់គ្លេស
ការភ្ជាប់ប្រអប់ត្រួតពិនិត្យប្រព័ន្ធ (ការដំឡើងលាក់)
ផ្នែកខាងឆ្វេង និងខាងស្តាំនៃប្រអប់ត្រួតពិនិត្យប្រព័ន្ធត្រូវបានដំឡើងជាមុនជាមួយនឹងគម្របរបស់វានៅក្នុងរោងចក្រ។ បន្ទះត្រួតពិនិត្យប្រព័ន្ធសំខាន់គឺនៅខាងស្តាំ។
The safety wires are used to prevent the Right Cover from falling when accessing the System Control Box. Please ensure that the safety wires are never removed. Use caution as the System Control Box panel is separated into two pieces with wires attached. 1. Please follow Step 1~5 on page 40~41 for the System Control Box and the Connector Plate.
DO NOT try to remove or disconnect the safety wires. Please ensure that the safety wires are never removed. 2. Install the short side of the Lower System Control Box Mount Bracket onto the top of the System Control Box with the provided screws (M3 x 6 mm).
ការដំឡើងប្រអប់ត្រួតពិនិត្យប្រព័ន្ធខាងក្រោម តង្កៀបម៉ោនលើប្រអប់ត្រួតពិនិត្យប្រព័ន្ធ (ផ្នែកខាងមុខ និងខាងលើ Views)
3. ដំឡើងវីសដែលបានផ្តល់ (M8 x 16 mm) នៅលើតង្កៀបម៉ោនប្រអប់ត្រួតពិនិត្យប្រព័ន្ធខាងក្រោម។ ដោតគ្រាប់ M8 ដែលបានផ្តល់ឱ្យនៅលើវីស ហើយរឹតបន្តឹងគ្រាប់យ៉ាងពេញលេញ។
Installing the provided screw and nut to the Brackets (Rear View) 4. Repeat Step 2~3 for the other Lower System Control Box Bracket.
47
ភាសាអង់គ្លេស
5. Prepare the rubber hole plugs installed on the System Control Box by cutting the hole to size along the cross. The rubber hole plugs are used to protect the Cables from rubbing against any pointed edges. NOTE:The rubber hole plugs must always be placed in the holes.
6. Remove the pre-installed Power and Network Cables of the Cabinets from the System Control Box. NOTE: · There are five Power and 15 Network Cables to remove. · It is recommended to take photos of the completed wiring in the left and main system control boards before removing the Cables.
7. Carefully thread the Power and Network Cables through the holes provided in the System Control Box from behind. Ensure to use the correct cable holes for the Power and Network Cables. NOTE: · There are two Power and 15 Network Cables to thread. · Avoid sharp bends or twists on the Cables. Network Cable holes
Power Cable holes 8. Connect the other end of the Network Cable to the network port that was
disconnected from the System Control Box in Step 6. NOTE:There are 15 Network Cables to connect.
48
ភាសាអង់គ្លេស
AC OUT AC IN L1 N1 L2 N2 L N L N
9. After connecting all the Network Cables, please follow the diagram below to connect the Power Cables of the Cabinets to the AC unit of the System Control Box. DO NOT connect the System Control Box Power Cable at this time.
System Control Box Power Cables · Connect the neutral wires (usually white/blue) to the “N1” and “N2” terminals. · Connect the hot wires (usually black/brown) to the “L1” and “L2” terminals. · Connect the ground wires (usually in green-yellow/green) to the ground
terminals. The meaning of wiring color may vary by country. Use the provided wrench to tighten the neutral, hot, and ground conductors in the terminals properly. The Power Cable must be properly grounded. Follow the electrical codes in your area if additional grounding is required.
AC OUT to Cabinets “A”~”E”
AC OUT AC IN L1 N1 L2 N2 L N L N
AC ចេញ
L1 N1 L2 N2 N N L L
អេស៊ីអ៊ី
Ground (AC OUT) Ground (AC IN)
អេស៊ីអ៊ី
49
AC ចេញ
L1 N1 L2 N2
ភាសាអង់គ្លេស
10.Remove the System Control Box’s ground wire (usually in green-yellow/green).
11. Please follow Step 11~12 on page 44 for the system control board. NOTE:After the IR Extension Cable is connected, route it through the adjacent cable hole as highlighted below to the rear. Connection port for IR Extension Cable
12.After connecting all Cables and wires, please follow Step 15~16 on page 46 for the System Control Box Covers. NOTE:Please ensure there are no sharp bends or twists in the Cables and wires.
13.Align the Lower System Control Box Mount Brackets with the Upper Mount Brackets to attach.
50
ភាសាអង់គ្លេស
14.Carefully place the Lower System Control Box Mount Brackets onto the Upper System Control Box Mount Brackets. NOTE:To avoid sharp bends or twists in the Cables, please pull them into the Cabinets and manage the Cables there.
Placing the Lower System Control Box Mount Bracket onto the Upper (Rear View) 15. Ensure the Lower System Control Box Mount Brackets sit securely on the Upper.
គណៈរដ្ឋមន្ត្រី
ការគ្រប់គ្រងប្រព័ន្ធ
Box After the System Control Box is connected, please go to page 54 for the LED Modules.
51
ភាសាអង់គ្លេស
Connecting the System Control Box (Separate Installation)
ផ្នែកខាងឆ្វេង និងខាងស្តាំនៃប្រអប់ត្រួតពិនិត្យប្រព័ន្ធត្រូវបានដំឡើងជាមុនជាមួយនឹងគម្របរបស់វានៅក្នុងរោងចក្រ។ បន្ទះត្រួតពិនិត្យប្រព័ន្ធសំខាន់គឺនៅខាងស្តាំ។
The safety wires are used to prevent the Right Cover from falling when accessing the System Control Box. Please ensure that the safety wires are never removed. Use caution as the System Control Box panel is separated into two pieces with wires attached. 1. Please follow Step 1~5 on page 40~41 for the System Control Box and the Connector Plate.
DO NOT try to remove or disconnect the safety wires. Please ensure that the safety wires are never removed. 2. Prepare the rubber hole plugs installed on the System Control Box by cutting the hole to size along the cross. The rubber hole plugs are used to protect the Cables from rubbing against any pointed edges. 3. Place the System Control Box accordingly over the drilled mounting holes to attach. 4. Carefully thread the Power and Network Cables through the holes provided in the System Control Box from behind. Ensure to use the correct cable holes for the Power and Network Cables. NOTE: · There are two Power and 15 Network Cables to thread. · Avoid sharp bends or twists on the Cables.
Network Cable holes
Power Cable holes 5. After threading the Power and Network Cables, install the System Control Box onto
the wall with the provided screws (M8 x 80 mm Expansion for masonry; wood screws for load bearing wood).
52
ភាសាអង់គ្លេស
6. Remove the pre-installed Power and Network Cables of the Cabinets from the System Control Box. NOTE: · There are five Power and 15 Network Cables to remove. · It is recommended to take photos of the completed wiring in the left and main system control boards before removing the Cables.
7. After removing the pre-installed Power and Network Cables of the Cabinets, connect the other end of the Network Cables to the network port that was disconnected from the System Control Box in Step 6. NOTE:There are 15 Network Cables to connect.
8. Please follow Step 9~10 on page 49~50 for the Power Cables and the System Control Box’s ground wire.
9. Please follow Step 11~12 on page 44 for the system control board. NOTE:After the IR Extension Cable is connected, route it through the adjacent cable hole as highlighted below to the rear. Connection port for IR Extension Cable
10. After connecting all cables and wires, please follow Step 15~16 on page 46 for the System Control Box Covers. Ensure there are no sharp bends or twists in the Cables and wires.
After the System Control Box is connected, please go to page 54 for the LED Modules.
53
ភាសាអង់គ្លេស
ការដំឡើងម៉ូឌុល LED
Please wear Anti-Static Gloves before handling the LED Modules. To avoid direct contact with the LED Modules, please remove watches, rings, bracelets, or other metal objects. Use caution when installing the LED Modules. 1. Starting from the LED Module labeled “1” in the top left corner, align each LED Module with the Cabinet, then carefully press the Module into place. NOTE:The arrow mark on the back of the LED Modules should be pointing down.
2. Attach the remaining LED Modules onto the Cabinets. Install from top left and move to bottom right, ensuring to match the corresponding numbers on the Module to the Cabinet.
NOTE:Before installing the LED Module, ensure that each Module is flush and that there is little to no gap between each. It may be necessary to gently tap the module to make it flush.
After all LED Modules are installed, please go to page 55 (Standard and Trolley Installation) or page 56 (Hidden and Separate Installation) for the Screen Bezels.
54
ភាសាអង់គ្លេស
Installing the Screen Bezels (Standard and Trolley Installation)
ផ្ទាំងប្លាស្ទិករបស់ Screen Bezels ត្រូវបានដំឡើងជាមុននៅលើ Bezels។ ត្រូវប្រាកដថាផ្ទាំងផ្លាស្ទិចទាំងអស់ត្រូវបានភ្ជាប់យ៉ាងត្រឹមត្រូវ មុនពេលដំឡើងអេក្រង់ Bezels នៅលើអេក្រង់។
ផ្ទាំងប្លាស្ទិក
1. Place the Screen Bezels to the correct side of the screen to attach. It is easier to start with the top Bezels first then put on the sides. The top Screen Bezels (left and right) are around 2 mm longer than the others. NOTE: · Each Screen Bezel is marked, so you’ll know which side to install. · If a Screen Bezel does not seem to fit, lift it up with caution and check if it is on the correct side to install. If the Bezel does not seem to fit at all, please contact your dealer. DO NOT force it into place.
2. តម្រឹមផ្ទាំងផ្លាស្ទិចនៃអេក្រង់ Bezel ជាមួយនឹងរន្ធដែលបានផ្តល់នៅក្នុងអេក្រង់។
3. ចុចចុះក្រោមនៅលើអេក្រង់ Bezel រហូតដល់អ្នកឮវាចុចចូលកន្លែង។ 4. ដាក់ Bezels អេក្រង់ដែលនៅសល់លើជ្រុងខាងឆ្វេង និងខាងស្តាំនៃអេក្រង់។
NOTE:There are five Screen Bezels on either left or right side of the screen to install. After all Screen Bezels are installed, please go to page 57 to finish the installation.
55
ភាសាអង់គ្លេស
Installing the Screen Bezels (Hidden and Separate Installation)
ផ្ទាំងប្លាស្ទិករបស់ Screen Bezels ត្រូវបានដំឡើងជាមុននៅលើ Bezels។ ត្រូវប្រាកដថាផ្ទាំងផ្លាស្ទិចទាំងអស់ត្រូវបានភ្ជាប់យ៉ាងត្រឹមត្រូវ មុនពេលដំឡើងអេក្រង់ Bezels នៅលើអេក្រង់។
ផ្ទាំងប្លាស្ទិក
1. Please follow Step 1~4 on page 55 for the left and right sides of the Screen Bezels. NOTE: · Each Screen Bezel is marked, so you’ll know which side to install. · If a Screen Bezel does not seem to fit, lift it up with caution and check if it is on the correct side to install. If the Bezel does not seem to fit at all, please contact your dealer. DO NOT force it into place.
2. Install the bottom Screen Bezels with the provided screws (M3 x10 mm). NOTE:There are five Screen Bezels to install.
After all Screen Bezels are installed, please go to page 57 to finish the installation.
56
ភាសាអង់គ្លេស
ការបើកអេក្រង់ LED
1. Make sure the System Control Box Power Cable is connected and plugged into a power outlet. NOTE:When the System Control Box Power Cable is connected to a power outlet, the Power Indicator Light will be a steady red. This means the LED Display is in standby mode. Please refer to the User Guide for more details.
2. អេក្រង់ LED របស់អ្នកឥឡូវនេះរួចរាល់ដើម្បីបើក។
LDP136-071C_IG_1b_ENG_20250909 Copyright © 2025 Viewសាជីវកម្ម Sonic ។ រក្សារសិទ្ធគ្រប់យ៉ាង។
57
ឯកសារ/ធនធាន
![]() |
ViewSonic LDP136-071C ទាំងអស់ក្នុងមួយផ្ទាល់ View អេក្រង់ LED [pdf] ការណែនាំអំពីការដំឡើង LDP136-071C, LDP136-071C All in One Direct View LED Display, LDP136-071C, All in One Direct View អេក្រង់ LED, ផ្ទាល់ View អេក្រង់ LED, View អេក្រង់ LED, អេក្រង់ LED, បង្ហាញ |

