KEVMOR CLEVER II Janser Gigant Stirring Station

KEVMOR CLEVER II Janser Gigant Stirring Station

Risk Assessment

Janser Gigant Stirring Station

Product: Janser Gigant Stirring Station
Location of Use: Construction sites, commercial flooring jobs, warehouse environments
Date of Assessment: 28/3/25
Assessor Name: Vincent Mort
Review Date: 28/3/26

Identify Hazards / Risky Activities

Step 1:

Hazard Description
Electrical hazard Risk of electric shock from damaged cords or contact with wet surfaces
Manual handling strain Injury risk when lifting heavy buckets, moving the unit, or handling material
Entanglement Risk of clothing, hair, or fingers caught in the mixing paddle
Slips, trips, and falls Wet or spilled material can create slippery surfaces
Dust inhalation When pouring in dry compounds or during cleaning
Noise exposure Potential hearing damage during prolonged use in enclosed spaces
Overexertion Risk of fatigue or strain from repetitive use or prolonged operation

Who Might Be Harmed and How

Step 2

Person at Risk How They Might Be Harmed
Operator Electrical shock, strain, entanglement, hearing damage, dust exposure
Co-workers Exposure to dust, slips from spilled material, tripping over cables
Maintenance crew Exposure during cleaning or disassembly; potential for electric shock
Clean-up personnel Risk of handling spills or waste without adequate protection

Risk Evaluation & Precautions

Step 3

Hazard Risk Level Precautions / Controls
Electrical hazard Medium Use RCD-protected outlets; inspect leads before use; avoid wet areas
Manual handling strain Medium Use lifting aids or team lift; avoid overfilling buckets; train on manual handling
Entanglement High Fit paddle guard; tie back hair; wear tight-fitting clothing; never reach inside when operating
Slips, trips, and falls Medium Keep work area clean; clean spills immediately; use non-slip mats if needed
Dust inhalation Medium Wear P2 mask when adding dry mix; operate in well ventilated area
Noise exposure Low– Medium Use hearing protection when in enclosed or echo-prone spaces
Overexertion Medium Rotate tasks to avoid fatigue; provide breaks

Risk Management Plan

Step 4

Controls in Place:

  • PPE Required: Safety boots, gloves, hearing protection, P2 mask, eye protection
  • Pre-use Inspection: Check cables, plug, mixer arm, and paddle guard
  • Training: All operators must be trained on setup, safe use, and emergency shut-off
  • Operating Guidelines: Never leave unit running unattended; use only for intended materials
  • Spill Response: Keep mop, bucket, and absorbent materials nearby for rapid clean-up
  • Storage & Transport: Lock wheels when stationary; transport using proper lifting technique

Review and Update

Step 5

Review Triggers:

  • Every 6 months or after a near miss/incident
  • When the unit is replaced or upgraded
  • If job site conditions change significantly

Next Review Date: 28/3/26

Logo

Documents / Resources

KEVMOR CLEVER II Janser Gigant Stirring Station [pdf] Instructions
CLEVER II Janser Gigant Stirring Station, CLEVER II, Janser Gigant Stirring Station, Gigant Stirring Station, Stirring Station

References

Leave a comment

Your email address will not be published. Required fields are marked *