SurgeX SEQ-1U

Manuale utente del sequenziatore di potenza SurgeX ESP SEQ-1U

Model: SEQ-1U

Introduzione

Il SurgeX ESP SEQ-1U è un 20 Amp/120V power sequencer and conditioner designed to protect and manage power for sensitive audio/video systems. It ensures proper power-up and power-down sequences, preventing damaging pops, hissing sounds, and excessive inrush currents. This manual provides essential information for the safe and effective operation of your SEQ-1U unit.

Informazioni sulla sicurezza

AVVERTIMENTO:

Prodotto finitoview

Pannello frontale

Davanti view of the SurgeX ESP SEQ-1U power sequencer, showing the brand logo, model number, LCD display, key switch, and power button.

Figure 1: Front Panel of the SurgeX ESP SEQ-1U

The front panel of the SEQ-1U features the SurgeX brand logo and model number. A central LCD display shows the unit's status, including voltage (e.g., "STATUS: ALL OFF 118V") and protection status (e.g., "PROTECTION: GOOD"). To the left of the display, a key switch with associated lock icons provides security. On the right, "SEL" and "ADJ" buttons are used for navigation and adjustment, alongside a prominent blue "POWER" button.

Caratteristiche principali

Impostare

Montaggio su rack

The SEQ-1U is designed for standard 19-inch rack mounting. Secure the unit using appropriate rack screws (not included) to ensure stability. Allow adequate ventilation around the unit.

Collegamento di potenza

  1. Ensure the main power switch on the SEQ-1U is in the OFF position.
  2. Connect the unit's power cord to a dedicated 20 Amp, 120V AC power outlet.
  3. Verificare che la fonte di alimentazione sia stabile e che rientri nel volume specificatotage gamma.

Collegamento di apparecchiature

The SEQ-1U features two always-on outlets and three sequenced banks, each with two outlets.

Istruzioni per l'uso

Accensione/spegnimento

  1. Insert the key into the key switch on the front panel and turn it to the "ON" position.
  2. Press the blue "POWER" button. The unit will begin its power-up sequence, activating the sequenced banks with the configured delays.
  3. To power off, press the blue "POWER" button again. The unit will initiate the power-down sequence in reverse order.
  4. For complete power disconnection, turn the key switch to the "OFF" position and/or unplug the unit from the wall outlet.

Adjusting Sequence Delay

The SEQ-1U allows adjustment of the delay between sequenced banks (0-40 seconds).

  1. Use the "SEL" button to navigate through menu options on the LCD display.
  2. Use the "ADJ" button to modify the selected value (e.g., sequence delay time).
  3. Consult the on-screen prompts for specific instructions on saving your custom settings in non-volatile memory.

Informazioni sul display LCD

Il display LCD fornisce aggiornamenti di stato in tempo reale:

Manutenzione

Risoluzione dei problemi

ProblemaPossibile causaSoluzione
L'unità non si accende.No power from wall outlet; key switch in OFF position; tripped circuit breaker.Check wall outlet with another device; ensure key switch is ON; reset circuit breaker.
Equipment not powering on in sequence.Incorrect connection to outlets; sequence delay set too long/short; unit in bypass mode.Verify connections to sequenced banks; adjust sequence delay; ensure unit is in normal operating mode.
"PROTECTION: FAULT" displayed.Internal protection circuit activated due to severe surge.Disconnect all equipment, power cycle the unit. If fault persists, contact SurgeX support.

Specifiche

Garanzia e supporto

For warranty information, technical support, or service inquiries, please contact SurgeX customer service. Refer to the official SurgeX websito o la documentazione di acquisto per i dettagli di contatto e i termini di garanzia più aggiornati.

Risorse online: Visit the SurgeX official websito per FAQ, registrazione del prodotto e materiale di supporto aggiuntivo.

Documenti correlati - SEQ-1U

Preview SurgeX CONNECT Quick Start Guide
Concise guide for setting up and connecting SurgeX CONNECT devices, including firmware updates, account creation, and network configuration.
Preview Guida rapida all'avvio dell'unità di distribuzione protetta da sovratensioni controllabile tramite IP commutato SurgeX Axess+
Questa guida rapida fornisce informazioni essenziali per l'installazione e la configurazione dell'unità di distribuzione dell'alimentazione (PDU) con protezione da sovratensioni controllabile IP commutata SurgeX Axess+. Copre l'identificazione dell'unità, le procedure di installazione in rack, la descrizione dei componenti e i metodi per accedere all'unità. web interfaccia. I modelli compatibili includono SX-AP-129, SX-AP-169, SX-AP-109i e SX-AP-169i.
Preview Manuale utente dell'unità di distribuzione dell'alimentazione protetta da sovratensioni SurgeX DisplayPak+ con controllo IP commutato
Manuale utente per la serie SurgeX DisplayPak+ di PDU protette da sovratensioni controllabili tramite IP commutato, che descrive in dettaglio l'installazione e la configurazione tramite web server, gestione dell'alimentazione, funzionalità di sicurezza, risoluzione dei problemi e specifiche.
Preview Manuale utente dell'utilità di aggiornamento del firmware SurgeX Axess Elite
Questo manuale utente fornisce istruzioni per l'utilizzo dell'utility di aggiornamento SurgeX Axess Elite (AEUU) per gestire e aggiornare il firmware dei dispositivi SurgeX Axess Elite. ... filee impostazione dei valori predefiniti di fabbrica.
Preview Guida rapida di SurgeX Axess Elite+ SX-AEP-209
Guida rapida per l'unità di distribuzione dell'alimentazione SurgeX Axess Elite+ SX-AEP-209, che copre la configurazione, le connessioni e web accesso al browser.
Preview Istruzioni per l'installazione e guida rapida di SurgeX Vertical Series+ Smart PDU
Guida completa all'installazione e all'avvio rapido per la PDU intelligente SurgeX Vertical Series+. Copre precauzioni di sicurezza, inventario, connessioni fisiche, alimentazione CA, Ethernet, USB-OTG, indicatori LED, funzioni dei pulsanti e accesso al web interfaccia per l'installazione e la configurazione.