INNOVATIVE

innovative E2-02-SS E2 CONNEX Dynamic Dual

innovative-E2-02-SS-E2-CONNEX-Dynamic-Dual

Modelsinnovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-1

IMPORTANT INSTRUCTIONS

WARNING

  • Do not use power tools during assembly.
  • The monitors shall not be positioned behind the edge of the desk.
  • It is highly recommended to engage the 180º lockout screw.innovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-2

TOOLS REQUIREDinnovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-3

PARTS LISTinnovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-4innovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-5 innovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-6 innovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-7

E2-01-SD

  1. Secure Top Down Mount (A) to worksurface. (see page 14)
  2. Insert and secure Pole w/collar (B) into mount (A). (see page 16)
  3. Adjust height of the collar on the pole and hand tighten the screw.
  4. Slide LCD Forearm (E) over pole (optional: secure it in place with the 3/32″ Hex Key (V) ).
  5. Slide Spacer (I) over Dynamic arm (H) shaft and insert arm to LCD Forearm (E). Secure it with Dog Washer (R) and Screw (S).
  6. Insert Slider (M) to Dynamic Arm (H). Secure it with Dog Washer (R) and Screw (S). (see page 18)
  7. Attach Quick Connect VESA Plate (N) to monitor using Screws (T) and insert it to Slider (M). (see page 18)
  8. Snap Cable Clip (Q) on the Pole (B).innovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-8

E2-02-D

  1. Secure Top Down Mount (A) to worksurface. (see page 14)
  2. Insert and secure Pole w/collar (B) into mount (A). (see page 16)
  3. Adjust height of the collar on the pole and hand tighten the screw.
  4. Slide LCD Forearm (E) over pole (optional: secure it in place with the 3/32″ Hex Key (V) ).
  5. Slide Spacer (I) over Dynamic arm (H) shaft and insert arm to LCD Forearm (E). Secure it with Dog Washer (R) and Screw (S).
  6. Insert Slider (M) to Dynamic Arm (H). Secure it with Dog Washer (R) and Screw (S). (see page 18)
  7. Attach Quick Connect VESA Plate (N) to monitor using Screws (T) and insert it to Slider (M). (see page 18)
  8. Snap Cable Clip (Q) on the Pole (B).innovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-9

E2-02-SD

  1. Secure Top-Down Mount (A) to worksurface. (see page 14)
  2. Insert and secure Pole (C) into mount (A). (see page 16)
  3. Slide Dual Yoke (F) over pole and secure it in place at desired height with the 3/32″ Hex Key (V), apply 30 in-lbs torque. (see page 17)
  4. 2x Insert 4″ Extension (J) to Dual Yoke (F). Secure it with Dog Washer (R) and Screw (S).
  5. 2x Slide Spacer (I) over Dynamic arm (H) shaft and insert arm to 4″ Extension (J). Secure it with Dog Washer (R) and Screw (S).
  6. 2x Insert Slider (M) to Dynamic Arm (H). Secure it with Dog Washer (R) and Screw (S). (see page 18)
  7. 2x Attach Quick Connect VESA Plate (N) to monitor using Screws (T) and insert it to Slider (M). (see page 18)
  8. Snap Cable Clip (Q) on the Pole (C).innovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-10

E2-02-SS

  1. Secure Top-Down Mount (A) to worksurface. (see page 14)
  2. Insert and secure Pole (C) into mount (A). (see page 16)
  3. Slide Dual Yoke (F) over pole and secure it in place at desired height with the 3/32” Hex Key (V), apply 30 in-lbs torque. (see page 17)
  4. 2x Insert 8″ Extension (K1) with Rotational Stop Slot to Dual Yoke (F). Secure it with Dog Washer (R) and Screw (S).
  5. 2x Insert 8” Extension (K) to 8” Extension (K1) with Rotational Stop Slot. Secure it with Dog Washer (R) and Screw (S).
  6. 2x Insert Slider (M) to 8” Extension (K). Secure it with Dog Washer (R) and Screw (S).
  7. 2x Attach Quick Connect VESA Plate (N) to monitor using Screws (T) and insert it to Slider (M). (see page 18)
  8. Snap Cable Clip (Q) on the Pole (C),innovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-11

E2-03-SD

  1. Secure Top Down Mount (A) to worksurface. (see page 14)
  2. Insert and secure Pole (C) into mount (A). (see page 16)
  3. Slide Dual Yoke (F) over pole and secure it in place at desired height with the 3/32″ Hex Key (V), apply 30 in-lbs torque. (see page 17)
  4. 2x Insert 12″ Extension (L) to Dual Yoke (F). Secure it with Dog Washer (R) and Screw (S).
  5. 2x Slide Spacer (I) over Dynamic arm (H) shaft and insert arm to 12″ Extension (L). Secure it with Dog Washer (R) and Screw (S).
  6. Slide Single Yoke (G) over pole and secure it in place at desired height with the 3/32″ Hex Key (V), apply 30 in-lbs torque. (see page 19)
  7. 2x Insert Slider (M) to Dynamic Arm (H). Secure it with Dog Washer (R) and Screw (S). (see page 18)
  8. 3x Attach Quick Connect VESA Plate (N) to monitor using Screws (T) and insert it to Slider (M) or Tilter (O). (see page 18)
  9. Snap Cable Clip (Q) on the Pole (C).innovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-12

E2-03-SSS

  1. Secure Top Down Mount (A) to worksurface. (see page 14)
  2. Insert and secure Pole (C) into mount (A). (see page 16)
  3. Slide Dual Yoke (F) over pole and secure it in place at desired height with the 3/32″ Hex Key (V), apply 30 in-lbs torque. (see page 17)
  4. 2x Insert 12″ Extension (L) to Dual Yoke (F). Secure it with Dog Washer (R) and Screw (S).
  5. 2x Insert 8″ Extension (K) to 12″ Extension (L) with Rotational Stop Slot. Secure it with Dog Washer (R) and Screw (S).
  6. 2x Insert 4″ Extension (J) to 8″ Extension (K) with Rotational Stop Slot. Secure it with Dog Washer (R) and Screw (S).
  7. Slide Center Arm Yoke (G) over pole and secure it in place at desired height with the 3/32″ Hex Key (V), apply 30 in-lbs torque.
  8. 2x Insert Slider (M) to 4″ Extension (J). Secure it with Dog Washer (R) and Screw (S).
  9. 3x Attach Quick Connect VESA Plate (N) to monitor using Screws (T) and insert it to Slider (M) or Tilter (O). (see page 18)
  10. Snap Cable Clip (Q) on the Pole (C)innovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-13

E2-01-HD

  1. Secure Top Down Mount (A) to worksurface. (see page 14)
  2. Insert and secure Pole (D) into mount (A). (see page 16)
  3. 2x Slide Single Yoke (G) over the Pole and secure it in place at desired height with the 3/32″ Hex Key (V), apply 30 in-lbs torque.
  4. 2x Insert HD Tilter (P) to Single Yoke (G). Secure it with Dog Washer (R) and Screw (S).
  5. 2x Snap Cable Clip (Q) on the Pole (D).innovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-14

DESK CLAMP CONFIGURATIONinnovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-15

THRU-DESK CONFIGURATION*innovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-16

SECURE POLE IN MOUNTinnovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-17

DUAL YOKE ASSEMBLYinnovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-18

SLIDER W/ QUICK CONNECT VESA PLATE ASSEMBLYinnovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-19

CENTER ARM TILTER W/ QUICK CONNECT VESA PLATE ASSEMBLYinnovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-19

DYNAMIC ARM COUNTERBALANCEinnovative-E2-02-SS-E2-CONNEX-Dynamic-Dual-21

Innovative Ergonomic Solutions
800 524 2744
customerservice@team-ies.com
team-ies.com

HAT Collective
408 437 8770
cs@hatcollective.com
hatcollective.com

Documents / Resources

innovative E2-02-SS E2 CONNEX Dynamic Dual [pdf] Instruction Manual
E2-02-SS, E2 CONNEX Dynamic Dual, E2-02-SS E2 CONNEX Dynamic Dual, Dynamic Dual

References

Leave a comment

Your email address will not be published. Required fields are marked *