HUAWEI SUN2000 Smart PV Solution
Product Information
Specifications
- Component: Inverter (master and slave)
- Model: SUN2000-(2KTL-6KTL) -L1, SUN2000-(8K, 10K)-LC0, SUN2000-(8K, 10K)-LC0-ZH
- Energy storage system (ESS): LUNA2000-(5-30)-S0, LUNA2000-(7, 14, 21)-S1
- Backup Box: Backup Box-B0
- Smart Power Sensor: Single-Phase: DDSU666-H YDS70-C16 DDSU71 DDSU1079-CT, Three-Phase: DTSU666-H DTSU666-HW YDS60-80 DTSU71 DHSU1079-CT
- Smart Dongle: SDongleA-03(4G), SDongleB-06(4G), SDongleA-05(WLAN-FE)
- Smart PV Optimizer: SUN2000-450W-P2, SUN2000-600W-P
Product Usage Instructions
Networking
Ensure proper networking setup according to the Smart Dongle Networking scenario. A maximum of three inverters and six ESSs can be connected in this configuration.
Cable Connections (Single-Phase Inverter L1 + ESS S0 + Backup Box B0)
- Before connecting cables, ensure all switches are OFF to prevent electric shocks.
- Use outdoor shielded twisted pair cables for signal cables.
- Ensure the wiring sequence of the Backup Box matches that of the inverter AC terminals.
- Connect other cables to slave inverters based on the connection method for the master inverter.
Component Connections
- Follow the cable connections as specified in the user manual for each component.
- Ensure correct polarity and secure connections for all cables.
FAQ
- Q: Can I connect the ESS LUNA2000-(7, 14, 21)-S1 to different inverters?
- A: No, the ESS LUNA2000-(7, 14, 21)-S1 cannot connect to different inverters. It should be connected to the specified Backup Box.
- Q: How many inverters and ESSs can be connected in the Smart Dongle networking scenario?
- A: In the Smart Dongle networking scenario, a maximum of three inverters and six ESSs can be connected.
- Q: What type of cables should be used for signal connections?
- A: Signal cables must be outdoor shielded twisted pair cables for proper connectivity and signal transmission.
Residential Smart PV Solution Quick Guide
(Single-Phase PV+ESS Scenario + Smart Dongle Networking)
Issue: 06
Date: 2024-07-15
Networking
Note
- The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute a warranty of any kind, express or implied.
- For details about the solution components, installation, and cable connections, see the corresponding user manuals and quick guides.
- The cable colors involved in this document are for reference only. Select cables in accordance with local cable specifications.
Product Overview
Component | Model | Description | |
Inverter (master and slave) | SUN2000-(2KTL-6KTL) -L1 SUN2000-(8K, 10K)-LC0 SUN2000-(8K, 10K)-LC0-ZH |
|
|
Energy storage system (ESS) | LUNA2000-(5-30)-S0 LUNA2000-(7, 14, 21)-S1 |
|
|
Backup Box | Backup Box-B0 |
|
|
Smart Power Sensor | Single-Phase: DDSU666-H YDS70-C16 DDSU71 DDSU1079-CT | Three-Phase: DTSU666-H DTSU666-HW YDS60-80 DTSU71 DHSU1079-CT |
|
Smart Dongle | SDongleA-03(4G) SDongleB-06(4G) SDongleA-05(WLAN-FE) |
|
|
Optimizer | SUN2000-450W-P2 SUN2000-600W-P | For details about the optimizer supported by the inverter, see SUN2000 Smart PV Optimizer User Manual |
Note:
In the Smart Dongle networking scenario, a maximum of three inverters and six ESSs can be connected.
Cable Connections (Single-Phase Inverter L1 + ESS S0 + Backup Box B0)
Danger
Before connecting cables, ensure that all switches are OFF. Otherwise, electric shocks may occur.
Note
Signal cables must be outdoor shielded twisted pair cables.
Note
The wiring sequence of the Backup Box must be consistent with that of the inverter AC terminals.
Note
Connect other cables to slave inverters by referring to the connection method for the master inverter.
Cable Type | No. | One End | The Other End | ||
Component | Port | Port | Component | ||
DC power cable | 1 | Master inverter | PV1+ | Positive terminal | PV strings |
PV1- | Negative terminal | ||||
2 | Master inverter | BAT+ | BAT+ | ESS 1 | |
BAT- | BAT- | ||||
3 | ESS1 | BAT+ | BAT+ | ESS 2 | |
BAT- | BAT- | ||||
Signal cable | 4 | Master inverter | COM-3 | COM-7 (right) | ESS 1 |
COM-4 | COM-4 (right) | ||||
COM-5 | COM-2 (right) | ||||
COM-6 | COM-3 (right) | ||||
5 | ESS 1 | COM-2 (left) | COM-2 (right) | ESS 2 | |
COM-3 (left) | COM-3 (right) | ||||
COM-4 (left) | COM-4 (right) | ||||
COM-7 (left) | COM-7 (right) | ||||
COM-8 (left) | COM-8 (right) | ||||
COM-9 (left) | COM-9 (right) | ||||
6 | Master inverter | COM-1 | COM-1 | Slave inverter 1 | |
COM-2 | COM-2 | ||||
7 | Slave
inverter 1 |
COM-1 | COM-1 | Slave inverter 2 | |
COM-2 | COM-2 |
Cable Type |
No. |
One End | The Other End | ||
Component | Port | Port | Component | ||
Signal cable | 8 | Master inverter | COM-8 | X4-1 | Backup Box |
COM-5 | X4-2 | ||||
9 | Master inverter | COM-3 | 25 | DDSU666-H | |
COM-4 | 24 | ||||
AC
power cable |
10 | Master inverter | AC-L | X3-2 (L) | Backup Box |
AC-N | X3-6 (N) | ||||
AC-PE | X3-10 (PE) | ||||
11 | Backup load power distribution box | L | X1-1 | Backup Box | |
N | X1-2 | ||||
PE | X1-4 | ||||
12 | AC power distribution box | L | X2-1 | Backup Box | |
N | X2-4 | ||||
PE | X2-6 | ||||
13 | AC power distribution box | L | 3 | DDSU666-H | |
N | 4 | ||||
14 | AC power distribution box |
L |
5 | DDSU666-H CT | |
6 |
Cable Connections (Single-Phase Inverter L1 + ESS S1 + Backup Box B0)
Note
The wiring sequence of the Backup Box must be consistent with that of the inverter AC terminals.
Danger
Before connecting cables, ensure that all switches are OFF. Otherwise, electric shocks may occur.
Note
Signal cables must be outdoor shielded twisted pair cables.
Note
Connect other cables to slave inverters by referring to the connection method for the master inverter.
Cable Type | No. | One End | The Other End | ||
Component | Port | Port | Component | ||
DC power cable | 1 | Master
inverter |
PV1+ | Positive terminal | PV strings |
PV1- | Negative
terminal |
||||
2 | Master inverter | BAT+ | BAT+ | ESS | |
BAT- | BAT- | ||||
Signal cable | 3 | Master inverter | COM-3 | COM-3 | ESS |
COM-4 | COM-2 | ||||
COM-5 | COM-5 | ||||
COM-6 | COM-4 | ||||
4 | Master
inverter |
COM-1 | COM-1 | Slave
inverter 1 |
|
COM-2 | COM-2 | ||||
5 | Slave inverter 1 | COM-1 | COM-1 | Slave inverter 2 | |
COM-2 | COM-2 | ||||
6 | Master inverter | COM-8 | X4-1 | Backup Box | |
COM-5 | X4-2 | ||||
7 | Master inverter | COM-3 | 25 | DDSU666-H | |
COM-4 | 24 |
Cable Type |
No. |
One End | The Other End | ||
Component | Port | Port | Component | ||
AC
power cable |
8 | Master inverter | AC-L | X3-2 (L) | Backup Box |
AC-N | X3-6 (N) | ||||
AC-PE | X3-10 (PE) | ||||
9 | Backup load power distribution box | L | X1-1 | Backup Box | |
N | X1-2 | ||||
PE | X1-4 | ||||
10 | AC power distribution box | L | X2-1 | Backup Box | |
N | X2-4 | ||||
PE | X2-6 | ||||
11 | AC power distribution box | L | 3 | DDSU666-H | |
N | 4 | ||||
12 | AC power distribution box |
L |
5 | DDSU666-H CT | |
6 |
Cable Connections (Single-Phase Inverter LC0 + ESS S0)
Danger
Before connecting cables, ensure that all switches are OFF. Otherwise, electric shocks may occur.
Note
Signal cables must be outdoor shielded twisted pair cables.
Note
Connect other cables to slave inverters by referring to the connection method for the master inverter.
Cable Type |
No. |
One End | The Other End | ||
Component | Port | Port | Component | ||
DC power cable | 1 | Master inverter | PV1+ | Positive terminal | PV strings |
PV1- | Negative
terminal |
||||
2 | Master inverter | BAT+ | BAT+ | ESS 1 | |
BAT- | BAT- | ||||
3 | ESS 1 | BAT+ | BAT+ | ESS 2 | |
BAT- | BAT- | ||||
Signal cable |
4
|
ESS 1 | COM-2 (left) | COM-2 (right) | ESS 2 |
COM-3 (left) | COM-3 (right) | ||||
COM-4 (left) | COM-4 (right) | ||||
COM-7 (left) | COM-7 (right) | ||||
COM-8 (left) | COM-8 (right) | ||||
COM-9 (left) | COM-9 (right) | ||||
5 |
Master inverter |
COM-3 | COM-7 (right) |
ESS 1 |
|
COM-4 | COM-4 (right) | ||||
COM-5 | COM-2 (right) | ||||
COM-6 | COM-3 (right) |
Cable Type |
No. |
One End | The Other End | ||
Component | Port | Port | Component | ||
Signal
cable |
6 |
Slave inverter 1 |
COM-1 | COM-1 | Slave inverter 2 |
COM-2 | COM-2 | ||||
7 | Master inverter | COM-1 | COM-1 | Slave inverter 1 | |
COM-2 | COM-2 | ||||
8 | Master inverter | COM-3 | 25 | DDSU666-H | |
COM-4 | 24 | ||||
Cable Type |
No. |
One End | The Other End | ||
Component | Port | Port | Component | ||
AC power cable |
9 |
Master inverter |
AC-L | L | AC power Power distribution box |
AC-N | N | ||||
AC-PE | PE | ||||
10 | AC power distribution box | L | 3 |
DDSU666-H |
|
N | 4 | ||||
11 | AC power distribution box |
L |
5 | DDSU666-H CT | |
6 |
Cable Connections (Single-Phase Inverter LC0 + ESS S1)
Danger
Before connecting cables, ensure that all switches are OFF. Otherwise, electric shocks may occur.
Note
Signal cables must be outdoor shielded twisted pair cables.
Cable Type |
No. |
One End | The Other End | ||
Component | Port | Port | Component | ||
DC power cable |
1 |
Master inverter |
PV1+ | Positive terminal |
PV strings |
PV1- | Negative
terminal |
||||
2 | Master inverter | BAT+ | BAT+ |
ESS 1 |
|
BAT- | BAT- | ||||
3 |
ESS 1 |
BAT+ | BAT+ |
ESS 2 |
|
BAT- | BAT- | ||||
Signal cable |
4
|
ESS 1 |
COM-7 | COM-7 |
ESS 2 |
COM-8 | COM-8 | ||||
COM-9 | COM-9 | ||||
COM-10 | COM-10 | ||||
COM-11 | COM-11 | ||||
COM-12 | COM-12 | ||||
5 |
Master inverter |
COM-3 | COM-3 |
ESS 1 |
|
COM-4 | COM-2 | ||||
COM-5 | COM-5 | ||||
COM-6 | COM-4 |
Cable Type |
No. |
One End | The Other End | ||
Component | Port | Port | Component | ||
Signal cable |
6 |
Slave inverter 1 |
COM-1 | COM-1 | Slave inverter 2 |
COM-2 | COM-2 | ||||
7 |
Master inverter |
COM-1 | COM-1 | Slave inverter 1 | |
COM-2 | COM-2 | ||||
8 | Master inverter | COM-3 | 25 | DDSU666-H | |
COM-4 | 24 |
Cable Type |
No. |
One End | The Other End | ||
Component | Port | Port | Component | ||
AC power cable |
9 |
Master inverter |
AC-L | L | AC power Power distribution
box |
AC-N | N | ||||
AC-PE | PE | ||||
10 | AC power distribution box | L | 3 |
DDSU666-H |
|
N | 4 | ||||
11 | AC power distribution box |
L |
5 | DDSU666-H CT | |
6 |
Cable Connections (Single-Phase Inverter LC0/L1 Cascading)
Note
The following figure shows the signal cable cascading of LC0/L1 single-phase inverters. For the complete networking wiring diagram, refer to the preceding cable connection diagrams.
System Commissioning
App-based Deployment Procedure
Downloading and Installing the FusionSolar App
- Search for FusionSolar in the app store to download the app.
- Scan the QR code below to download the app.
Installer Registration
Initial registration
Create the first installer account, and generate a domain named after the company.
Non-initial registration
If the company requires multiple installer accounts, log in to the FusionSolar app and tap Add user to create another installer account.
Setup Wizard (Connecting to the Inverter WLAN for Commissioning)
(Optional) Cascade inverters.
Set the ESS parameters.
Set the communication networking.
Add a plant
Checking the Plant Status
Checking the Plant Status
Off-Grid/Grid-tied Control Parameters
Enabling Off-Grid Mode
Setting Grid-tied Point Control
Physical Layout of Smart PV Optimizers
Attaching SN Labels
Remove the SN labels from optimizers and attach them to the physical layout template based on the actual positions of the optimizers in the plant.
Taking a Photo of the Physical Layout Template
Ensure that the four positioning points on the template are within the frame.
Generating a Physical Layout on the App
Enter the Layout screen
Generating a Physical Layout on the App Automatically
Upload the template and generate a layout
Creating a Physical Layout on the App Manually
Edit the physical layout and specify the quantity of inverters and PV modules as required.
Bind the inverter or optimizer SN
Adjust the physical layout
Documents / Resources
![]() |
HUAWEI SUN2000 Smart PV Solution [pdf] Owner's Manual SUN2000, SUN2000 Smart PV Solution, Smart PV Solution, PV Solution, Solution |
![]() |
HUAWEI SUN2000 Smart PV Solution [pdf] User Guide SUN2000 Smart PV Solution, SUN2000, Smart PV Solution, PV Solution, Solution |