HUAWEI SUN2000 Smart PV Solution

HUAWEI-SUN2000-Smart-PV-Solution-product-image

Product Information

Specifications

  • Component: Inverter (master and slave)
  • Model: SUN2000-(2KTL-6KTL) -L1, SUN2000-(8K, 10K)-LC0, SUN2000-(8K, 10K)-LC0-ZH
  • Energy storage system (ESS): LUNA2000-(5-30)-S0, LUNA2000-(7, 14, 21)-S1
  • Backup Box: Backup Box-B0
  • Smart Power Sensor: Single-Phase: DDSU666-H YDS70-C16 DDSU71 DDSU1079-CT, Three-Phase: DTSU666-H DTSU666-HW YDS60-80 DTSU71 DHSU1079-CT
  • Smart Dongle: SDongleA-03(4G), SDongleB-06(4G), SDongleA-05(WLAN-FE)
  • Smart PV Optimizer: SUN2000-450W-P2, SUN2000-600W-P

Product Usage Instructions

Networking
Ensure proper networking setup according to the Smart Dongle Networking scenario. A maximum of three inverters and six ESSs can be connected in this configuration.

Cable Connections (Single-Phase Inverter L1 + ESS S0 + Backup Box B0)

  • Before connecting cables, ensure all switches are OFF to prevent electric shocks.
  • Use outdoor shielded twisted pair cables for signal cables.
  • Ensure the wiring sequence of the Backup Box matches that of the inverter AC terminals.
  • Connect other cables to slave inverters based on the connection method for the master inverter.

Component Connections

  • Follow the cable connections as specified in the user manual for each component.
  • Ensure correct polarity and secure connections for all cables.

FAQ

  • Q: Can I connect the ESS LUNA2000-(7, 14, 21)-S1 to different inverters?
    • A: No, the ESS LUNA2000-(7, 14, 21)-S1 cannot connect to different inverters. It should be connected to the specified Backup Box.
  • Q: How many inverters and ESSs can be connected in the Smart Dongle networking scenario?
    • A: In the Smart Dongle networking scenario, a maximum of three inverters and six ESSs can be connected.
  • Q: What type of cables should be used for signal connections?
    • A: Signal cables must be outdoor shielded twisted pair cables for proper connectivity and signal transmission.

Residential Smart PV Solution Quick Guide
(Single-Phase PV+ESS Scenario + Smart Dongle Networking)

Issue: 06
Date: 2024-07-15

Networking

HUAWEI SUN2000 Smart PV Solution HUAWEI-SUN2000-Smart-PV-Solution-image (2)

Note

  1. The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute a warranty of any kind, express or implied.
  2. For details about the solution components, installation, and cable connections, see the corresponding user manuals and quick guides.
  3. The cable colors involved in this document are for reference only. Select cables in accordance with local cable specifications.

Product Overview

HUAWEI-SUN2000-Smart-PV-Solution-image (2)

Component Model Description
Inverter (master and slave) SUN2000-(2KTL-6KTL) -L1 SUN2000-(8K, 10K)-LC0 SUN2000-(8K, 10K)-LC0-ZH
  • A maximum of three inverters can be cascaded.
  • L1/LC0 inverters can be cascaded.
Energy storage system (ESS) LUNA2000-(5-30)-S0 LUNA2000-(7, 14, 21)-S1
  • If there is only one ESS, it must be connected to the master inverter.
  • Each inverter can connect to a maximum of two ESSs, each L1 can connect to a maximum of one ESS.
  • The LUNA2000-(5-30)-S0 and LUNA2000-(7, 14, 21)-S1 cannot connect to the same inverter in a parallel system.
  • If inverters are cascaded, the LUNA2000-(5-30)-S0 and LUNA2000-(7, 14, 21)-S1 cannot connect to different inverters.
Backup Box Backup Box-B0
  • AC input voltage range: 198–253 V
  • If there is only one Backup Box, it must be connected to the master inverter.
  • The SUN2000-(8K, 10K)-LC0, SUN2000-(8K, 10K)-LC0-ZH cannot be connected to the Backup Box.
Smart Power Sensor Single-Phase: DDSU666-H YDS70-C16 DDSU71 DDSU1079-CT Three-Phase: DTSU666-H DTSU666-HW YDS60-80 DTSU71 DHSU1079-CT
  • The Smart Power Sensor must be connected to the master inverter.
  • It connects to the inverter over RS485 for output power management and power limiting.
  • Only L1 supports the three-phase smart power sensor.
Smart Dongle SDongleA-03(4G) SDongleB-06(4G) SDongleA-05(WLAN-FE)
  • The Smart Dongle must be connected to the master inverter.
  • It connects to the management system and performs power scheduling.
  • The SDongleA-03 (4G) is compatible only with the SUN2000-(2KTL- 6KTL)-L1.
Optimizer SUN2000-450W-P2 SUN2000-600W-P For details about the optimizer supported by the inverter, see SUN2000 Smart PV Optimizer User Manual

Note:
In the Smart Dongle networking scenario, a maximum of three inverters and six ESSs can be connected.

Cable Connections (Single-Phase Inverter L1 + ESS S0 + Backup Box B0)

Danger
Before connecting cables, ensure that all switches are OFF. Otherwise, electric shocks may occur.

Note
Signal cables must be outdoor shielded twisted pair cables.

Note
The wiring sequence of the Backup Box must be consistent with that of the inverter AC terminals.

HUAWEI-SUN2000-Smart-PV-Solution-image (4) HUAWEI-SUN2000-Smart-PV-Solution-image (5)

Note
Connect other cables to slave inverters by referring to the connection method for the master inverter.

Cable Type No. One End The Other End
Component Port Port Component
DC power cable  1 Master inverter PV1+ Positive terminal PV strings
PV1- Negative terminal
 2 Master inverter BAT+ BAT+ ESS 1
BAT- BAT-
 3 ESS1 BAT+ BAT+ ESS 2
BAT- BAT-
Signal cable  4  Master inverter COM-3 COM-7 (right) ESS 1
COM-4 COM-4 (right)
COM-5 COM-2 (right)
COM-6 COM-3 (right)
 5 ESS 1 COM-2 (left) COM-2 (right) ESS 2
COM-3 (left) COM-3 (right)
COM-4 (left) COM-4 (right)
COM-7 (left) COM-7 (right)
COM-8 (left) COM-8 (right)
COM-9 (left) COM-9 (right)
 6 Master inverter COM-1 COM-1 Slave inverter 1
COM-2 COM-2
7 Slave

inverter 1

COM-1 COM-1 Slave inverter 2
COM-2 COM-2
Cable Type  

No.

One End The Other End
Component Port Port Component
Signal cable  8 Master inverter COM-8 X4-1 Backup Box
COM-5 X4-2
 9 Master inverter COM-3 25 DDSU666-H
COM-4 24
AC

power

cable

 10 Master inverter AC-L X3-2 (L) Backup Box
AC-N X3-6 (N)
AC-PE X3-10 (PE)
 11 Backup load power distribution box L X1-1 Backup Box
N X1-2
PE X1-4
12 AC power distribution box L X2-1 Backup Box
N X2-4
PE X2-6
13 AC power distribution box L 3 DDSU666-H
N 4
14 AC power distribution box  

L

5 DDSU666-H CT
6

Cable Connections (Single-Phase Inverter L1 + ESS S1 + Backup Box B0)

Note
The wiring sequence of the Backup Box must be consistent with that of the inverter AC terminals.

HUAWEI-SUN2000-Smart-PV-Solution-image (6) HUAWEI-SUN2000-Smart-PV-Solution-image (6)Danger
Before connecting cables, ensure that all switches are OFF. Otherwise, electric shocks may occur.

Note
Signal cables must be outdoor shielded twisted pair cables.

Note
Connect other cables to slave inverters by referring to the connection method for the master inverter.

Cable Type No. One End The Other End
Component Port Port Component
DC power cable  1 Master

inverter

PV1+ Positive terminal PV strings
PV1- Negative

terminal

 2 Master inverter BAT+ BAT+ ESS
BAT- BAT-
Signal cable  3 Master inverter COM-3 COM-3 ESS
COM-4 COM-2
COM-5 COM-5
COM-6 COM-4
4 Master

inverter

COM-1 COM-1 Slave

inverter 1

COM-2 COM-2
 5 Slave inverter 1 COM-1 COM-1 Slave inverter 2
COM-2 COM-2
 6 Master inverter COM-8 X4-1 Backup Box
COM-5 X4-2
 7 Master inverter COM-3 25 DDSU666-H
COM-4 24
Cable Type  

No.

One End The Other End
Component Port Port Component
AC

power

cable

 8 Master inverter AC-L X3-2 (L) Backup Box
AC-N X3-6 (N)
AC-PE X3-10 (PE)
 9 Backup load power distribution box L X1-1 Backup Box
N X1-2
PE X1-4
10 AC power distribution box L X2-1 Backup Box
N X2-4
PE X2-6
 11 AC power distribution box L 3 DDSU666-H
N 4
12 AC power distribution box  

L

5 DDSU666-H CT
6

Cable Connections (Single-Phase Inverter LC0 + ESS S0)

HUAWEI-SUN2000-Smart-PV-Solution-image (8) HUAWEI-SUN2000-Smart-PV-Solution-image (9)

Danger
Before connecting cables, ensure that all switches are OFF. Otherwise, electric shocks may occur.

Note
Signal cables must be outdoor shielded twisted pair cables.

Note
Connect other cables to slave inverters by referring to the connection method for the master inverter.

Cable Type  

No.

One End The Other End
Component Port Port Component
DC power cable 1 Master inverter PV1+ Positive terminal PV strings
PV1- Negative

terminal

2 Master inverter BAT+ BAT+ ESS 1
BAT- BAT-
3 ESS 1 BAT+ BAT+ ESS 2
BAT- BAT-
 

 

 

 

 

Signal

cable

4

 

ESS 1 COM-2 (left) COM-2 (right) ESS 2
COM-3 (left) COM-3 (right)
COM-4 (left) COM-4 (right)
COM-7 (left) COM-7 (right)
COM-8 (left) COM-8 (right)
COM-9 (left) COM-9 (right)
5  

Master

inverter

COM-3 COM-7 (right)  

 

ESS 1

COM-4 COM-4 (right)
COM-5 COM-2 (right)
COM-6 COM-3 (right)
Cable Type  

No.

One End The Other End
Component Port Port Component
Signal

cable

 6  

Slave inverter 1

COM-1 COM-1 Slave inverter 2
COM-2 COM-2
 7 Master inverter COM-1 COM-1 Slave inverter 1
COM-2 COM-2
 8 Master inverter COM-3 25 DDSU666-H
COM-4 24
Cable Type  

No.

One End The Other End
Component Port Port Component
 

 

 

AC

power

cable

 9  

Master inverter

AC-L L AC power Power distribution box
AC-N N
AC-PE PE
 10 AC power distribution box L 3  

DDSU666-H

N 4
 11 AC power distribution box  

L

5 DDSU666-H CT
6

Cable Connections (Single-Phase Inverter LC0 + ESS S1)HUAWEI-SUN2000-Smart-PV-Solution-image (9) HUAWEI-SUN2000-Smart-PV-Solution-image (9)

Danger
Before connecting cables, ensure that all switches are OFF. Otherwise, electric shocks may occur.

Note
Signal cables must be outdoor shielded twisted pair cables.

Cable Type  

No.

One End The Other End
Component Port Port Component
 

 

 

DC power

cable

 1  

Master

inverter

PV1+ Positive terminal  

PV strings

PV1- Negative

terminal

 2 Master inverter BAT+ BAT+  

ESS 1

BAT- BAT-
 3  

ESS 1

BAT+ BAT+  

ESS 2

BAT- BAT-
 

 

 

 

 

Signal

cable

 4

 

 

 

 

ESS 1

COM-7 COM-7  

 

 

ESS 2

COM-8 COM-8
COM-9 COM-9
COM-10 COM-10
COM-11 COM-11
COM-12 COM-12
 

Master

inverter

COM-3 COM-3  

 

ESS 1

COM-4 COM-2
COM-5 COM-5
COM-6 COM-4
Cable Type  

No.

One End The Other End
Component Port Port Component
 

 

Signal

cable

 6  

Slave inverter 1

COM-1 COM-1 Slave inverter 2
COM-2 COM-2
 7  

Master inverter

COM-1 COM-1 Slave inverter 1
COM-2 COM-2
 8 Master inverter COM-3 25 DDSU666-H
COM-4 24
Cable Type  

No.

One End The Other End
Component Port Port Component
 

 

 

AC

power cable

 

Master inverter

AC-L L AC power Power distribution

box

AC-N N
AC-PE PE
10 AC power distribution box L 3  

DDSU666-H

N 4
 11 AC power distribution box  

L

5 DDSU666-H CT
6

Cable Connections (Single-Phase Inverter LC0/L1 Cascading)

Note
The following figure shows the signal cable cascading of LC0/L1 single-phase inverters. For the complete networking wiring diagram, refer to the preceding cable connection diagrams.HUAWEI-SUN2000-Smart-PV-Solution-image (12)

System Commissioning

App-based Deployment ProcedureHUAWEI-SUN2000-Smart-PV-Solution-image (13)

Downloading and Installing the FusionSolar App

  • Search for FusionSolar in the app store to download the app.
  • Scan the QR code below to download the app.

HUAWEI-SUN2000-Smart-PV-Solution-image (14)

Installer Registration

Initial registration
Create the first installer account, and generate a domain named after the company.

HUAWEI-SUN2000-Smart-PV-Solution-image (14)

Non-initial registration
If the company requires multiple installer accounts, log in to the FusionSolar app and tap Add user to create another installer account.

HUAWEI-SUN2000-Smart-PV-Solution-image (16)

Setup Wizard (Connecting to the Inverter WLAN for Commissioning)

HUAWEI-SUN2000-Smart-PV-Solution-image (17) HUAWEI-SUN2000-Smart-PV-Solution-image (17)

(Optional) Cascade inverters.

HUAWEI-SUN2000-Smart-PV-Solution-image (17)

Set the ESS parameters.

HUAWEI-SUN2000-Smart-PV-Solution-image (20)

Set the communication networking.

HUAWEI-SUN2000-Smart-PV-Solution-image (21)

HUAWEI-SUN2000-Smart-PV-Solution-image (21)

Add a plant
HUAWEI-SUN2000-Smart-PV-Solution-image (23)

Checking the Plant Status

HUAWEI-SUN2000-Smart-PV-Solution-image (24)

Checking the Plant StatusHUAWEI-SUN2000-Smart-PV-Solution-image (37)

Off-Grid/Grid-tied Control Parameters

Enabling Off-Grid Mode

HUAWEI-SUN2000-Smart-PV-Solution-image (25) HUAWEI-SUN2000-Smart-PV-Solution-image (26)

Setting Grid-tied Point Control

HUAWEI-SUN2000-Smart-PV-Solution-image (26) HUAWEI-SUN2000-Smart-PV-Solution-image (28)

Physical Layout of Smart PV Optimizers

Attaching SN Labels
Remove the SN labels from optimizers and attach them to the physical layout template based on the actual positions of the optimizers in the plant.

HUAWEI-SUN2000-Smart-PV-Solution-image (29)

Taking a Photo of the Physical Layout Template
Ensure that the four positioning points on the template are within the frame.HUAWEI-SUN2000-Smart-PV-Solution-image (30)

Generating a Physical Layout on the App

Enter the Layout screen

HUAWEI-SUN2000-Smart-PV-Solution-image (31)

Generating a Physical Layout on the App Automatically

Upload the template and generate a layout

HUAWEI-SUN2000-Smart-PV-Solution-image (32) HUAWEI-SUN2000-Smart-PV-Solution-image (33)

Creating a Physical Layout on the App Manually
Edit the physical layout and specify the quantity of inverters and PV modules as required.

HUAWEI-SUN2000-Smart-PV-Solution-image (34)

Bind the inverter or optimizer SN

HUAWEI-SUN2000-Smart-PV-Solution-image (35)

Adjust the physical layout

HUAWEI-SUN2000-Smart-PV-Solution-image (36)

Documents / Resources

HUAWEI SUN2000 Smart PV Solution [pdf] Owner's Manual
SUN2000, SUN2000 Smart PV Solution, Smart PV Solution, PV Solution, Solution
HUAWEI SUN2000 Smart PV Solution [pdf] User Guide