Ro-ràdh
Thank you for choosing the Ledvion LED Track Lighting System. This manual provides essential information for the safe and efficient installation, operation, and maintenance of your new lighting system. Please read these instructions carefully before installation and retain them for future reference.
Fiosrachadh Sàbhailteachd Cudromach
- Dì-cheangail an cumhachd aig a’ phrìomh bhriseadh-cuairt an-còmhnaidh mus dèan thu stàladh, cumail suas no ath-chur bulb.
- Bu chòir an stàladh a dhèanamh le dealanach teisteanasach no a rèir còdan dealain ionadail.
- Ensure the mounting surface can support the weight of the track lighting system.
- Na bi nas àirde na an wat as àirdetage specified for the GU10 fittings.
- Seachain conaltradh dìreach ri stòr solais LED.
- Cùm stuthan pacaidh a-mach à ruigsinneachd chloinne.
- Tha an toradh seo air a dhealbhadh airson cleachdadh a-staigh a-mhàin.
Susbaint pacaid
Dèan cinnteach gu bheil na pàirtean uile an làthair agus gun mhilleadh mus lean thu air adhart leis an stàladh.
- 1x 2-meter Track Rail
- 5x GU10 Track Spotlights
- Bathar-cruaidh stàlaidh (sgriuban, plugaichean balla)
- Ceangal cumhachd
- Cap crìochnachaidh
- Optional anti-glare grids (may be included)

Image: Components included in the Ledvion LED Track Lighting System package (SKU: LVT10001_2m5s).
Suidheachadh: Stiùireadh Stàlaidh
1. Mounting the Track Rail
- Choose a suitable location for the track rail, ensuring it is a flat and stable surface.
- Mark the drilling points on the ceiling or wall using the track rail as a template.
- Drill holes at the marked points and insert the wall plugs (if necessary).
- Secure the track rail to the surface using the provided screws.
- Connect the power supply wires to the power connector on the track rail, ensuring correct polarity (Live, Neutral, Earth). Consult a qualified electrician if unsure.
- Attach the end cap to the opposite end of the track rail.
2. Attaching the Spotlights
The spotlights feature a plug-and-play installation system for easy attachment and repositioning.
- Ensure the power is OFF at the main circuit breaker.
- Align the spotlight connector with the track rail slot.
- Push the spotlight firmly into the track until it clicks into place.
- Rotate the locking mechanism on the spotlight connector to secure it.
- Repeat for all five spotlights.
- Insert GU10 bulbs (not included) into each spotlight by twisting them into the socket.

Image: Plug and Play Installation for Ledvion track spotlights.

Image: Dimensions of the Ledvion 2M track rail and spotlights.
Stiùireadh Obrachaidh
1. A ’toirt cumhachd air / dheth
Once installed, restore power at the main circuit breaker. Operate the track lighting system using your standard wall switch connected to the circuit.
2. Adjusting Spotlights
Each spotlight can be individually adjusted to direct light precisely where needed. The spotlights can be tilted 350 degrees in all directions and rotated 90 degrees.

Image: Adjustable and Rotatable features of Ledvion track spotlights.
3. Gnìomhachd Dimmable
If you are using dimmable GU10 LED bulbs and an external dimmer switch compatible with LED lighting, you can adjust the light intensity to create the desired ambiance.
Cùram is cumail suas
- Glanadh: Ensure the power is off before cleaning. Wipe the track and spotlights with a soft, dry, or slightly damp aodach. Na cleachd luchd-glanaidh sgudail no solventan.
- Ath-chur bulb: Disconnect power before replacing bulbs. Allow bulbs to cool completely. Twist the GU10 bulb counter-clockwise to remove and clockwise to insert a new bulb. Use only GU10 LED bulbs.
- Anti-Glare Grid (Optional): If equipped, the anti-glare grid can be easily added or removed to prevent glare.

Image: Optional anti-glare grid for Ledvion spotlights.
Fuasgladh thrioblaidean
Thoir sùil air a’ chlàr gu h-ìosal airson cùisean cumanta agus na fuasglaidhean aca.
| Trioblaid | Adhbhar a dh’fhaodadh a bhith ann | Fuasgladh |
|---|---|---|
| Cha bhith solas a ’tionndadh. | No power, loose connection, faulty bulb. | Check circuit breaker. Ensure all connections are secure. Replace bulb. |
| Solais priobadh. | Bulb sgaoilte, dimmer neo-fhreagarrach, uèirleadh lochtach. | Tighten bulb. Ensure dimmer is LED compatible. Consult electrician for wiring check. |
| Spotlight not secure on track. | Locking mechanism not engaged. | Ensure spotlight is fully inserted and locking mechanism is rotated to secure position. |
Sònrachaidhean Bathar
| Feart | Mion-fhiosrachadh |
|---|---|
| Brand | Ledvion |
| Modail Àireamh | LVT10001_2m5s |
| Fad Track | 2 meters (2000 mm) |
| Overall Product Dimensions (packaged) | 105 x 20 x 15 cm |
| Cuideam nì | 2.14 cileagram |
| Stuth | Aluminium |
| Dath | Dubh |
| Voltage | 230 Volt |
| Seòrsa bulb | LED (GU10 fitting) |
| Dimmable | Yes (with compatible GU10 bulbs and external dimmer) |
| Stoidhle | SET 1 de sholais rèilichean |
| Dùthaich Tùs | Sìona |
Ùrachaidhean is Goireasan Roghainneil
The Ledvion track lighting system is expandable with various optional accessories to customize your lighting setup. These include different connectors and pendant spots.

Image: Optional upgrades and accessories for Ledvion track lighting.
Fiosrachadh Barantais
Ledvion products are manufactured to high-quality standards. This product comes with a standard manufacturer's warranty against defects in materials and workmanship. Please refer to your purchase documentation or contact customer support for specific warranty terms and conditions applicable in your region.
Taic Luchd-cleachdaidh
If you have any questions, require technical assistance, or need to report an issue, please contact your retailer or visit the official Ledvion weblàrach-lìn airson goireasan taic.
Dèanadair: Ledvion
Weblàrach: www.ledvion.com





