EVBASE RN172 Rivian Running Boards
Specifications
- Product Name: 2025 Running Boards R1T
- Package Included:
- Running board: 2 pieces
- One-piece bolt: 6 pieces
- Nut: 12 pieces
- Bracket: 6 pieces
- Washer and spring washer: 24 pieces
- Installation tools
Product Usage Instructions
Installation
- Read the installation manual provided before using the product.
- Remove the original screws in the designated areas as shown in The manual.
- Fix the brackets using the original screws.
- Attach the running boards to the brackets using the one-piece bolts, nuts, washers, and spring washers as shown in the diagram.
Scan the QR code to get the manual
Read me first
- Read this document before using the product.
- The installation instructions may be slightly different from the actual operation. If there is any difference, please contact us according to the actual situation.
- Contact Evbase Customer Support for any repairs at: Email: service@evbase.com, Call: +1 (949) 358 4793 or SMS: +1 657-966-8047.
Warnings and Disclaimers
- Warning: All notes and disclaimers must be read before installation. Failure to do so can lead to improper installation, resulting in damage or injury.
- Important notice: You are welcome to purchase our company’s products. To protect the legitimate rights and interests of users, we hereby remind users that they must carefully read and fully understand the terms of this statement before using this product.
- If you use this product, your use will be deemed to be an acknowledgement of the entire content of this statement, and you agree to be bound by the following terms of this statement, and at the same time bear the consequences caused by irregular use.
- Our company reserves the right to update the above documents.
- Please be sure to operate this product according to the instructions.
Package Included
Driver side installation diagram
Driver Side Installation
Note: The installation method for both the driver side and the co-pilot side is the same.
- Remove the original screws in the red circle.
- Fix the bracket with the original screws.
- Secure the running board and bracket with one-piece bolts, nuts, washers, and spring washers according to the provided instructions.
- Remove the original screws in the red circle, and then fix the bracket with the original screw s. The installation method of the main and co-pilot is the same.
- Fix the running board and bracket with ④ one-piece bolt, ⑥ nut, ⑤ washer and spring washer according to the picture.
Need Help? Contact Us
- If you have any questions, please contact us at service@evbase.com
- +1 (949) 358 4793 (Mon-Fri: 9 AM – 6:30 PM PST)
- +1 657-966-8047
- evbase.com
Before contacting our Customer Support, please have your order number, videos, or images (if needed) ready for a fast and great solution. Send your customer number to get Evbase’s one-year extended warranty.
FAQs
Q: Are installation tools included in the package?
A: Yes, the package includes installation tools for your convenience.
Q: How do I contact Customer Support for repairs?
A: You can reach out to Evbase Customer Support via email at service@evbase.com, phone at +1 (949) 358 4793, or SMS at +1 657-966-8047.
Documents / Resources
![]() |
EVBASE RN172 Rivian Running Boards [pdf] Installation Guide RN172, 2025, RN172 Rivian Running Boards, RN172, Rivian Running Boards, Running Boards, Boards |