Package Contents
- Core Gree AC KNX Gateway
- Connection cable
Technical Specification
Components
- Status LED
- Prog. LED
- Prog KEY
- KNX-TP
- Input 1
- Input 2
- COM
- A/C UNIT
Safety Remarks
Warnings
- Installation, electrical connection, configuration and commissioning of the device can only be carried out by qualified personnel in compliance with the applicable technical standards and laws of the respective countries.
- The electrical connection of the device can only be carried out by qualified personnel. The incorrect installation may result in electric shock or fire. Before making the electrical connections, make sure the power supply has been turned off.
- Do not connect the main voltage (230V AC) to digital input and KNX connector of the device.
- Opening the housing of the device causes the immediate end of warranty period.
- In case of tampering, the compliance with the essential requirements of the applicable directives, for which the device has been certified, is no longer guaranteed.
Check compatibility list before installation
Device Connection
Check compatibility list before installation
CONNECTION
The device comes with a cable for direct connection to the related terminals of the Air Conditioner Indoor Unit.
The device should not be connected to the air conditioner with any cable rather than the one that comes with it.
CONNECTION TO THE INDOOR UNIT
- Disconnect the main power from the AC unit.
- Open the internal controller board.
- Find the Hl, H2 terminals
- Connect Yellow and Green cables on the installation cable supplied with the device to Hl and H2 terminals on the air conditioner (cables can be connected in any direction due to no polarity), and the black connector to the A/C Unit connector of the device
Cutting the cable, shortening it or making any other physical modifications may cause the device not to work properly.
CONNECTION TO THE KNX BUS
- Disconnect power of the KNX bus.
- Connect to the KNX TP-1 (EIB) Bus Line using the device’s standard KNX connector (red/black), respect polarity.
- Reconnect power of the KNX bus.
Mounting
Commissioning
- Configuration and commissioning of the device require the use of the ETS4 or later releases. These activities must be carried out according to the design of the building automation system done by a qualified planner.
- For the configuration of the device parameters the corresponding application program or the whole Core product database must be loaded in the ETS program. For detailed information on configuration options, refer to the application manual of the device available on the website www.core.com.tr
- For commissioning the device the following activities are required
- make the electrical connections as described above,
- turn on the bus power supply,
- switch the device operation to the programming mode
- download into the device the physical address and the configuration with the ETS program.
- At the end of the download the operation of the device returns to normal mode
- Now the bus device is programmed and ready to use
Core Bina Otomasyon Sistemleri Ltd. Sti.
Fatih Mahallesi Ege Caddesi No:42/5
Gaziemir – izmir – Turkiye
Documents / Resources
![]() |
core CR-CG-GRE-KNX-01 Gree AC Gateway [pdf] User Guide CR-CG-GRE-KNX-01, CR-CG-GRE-KNX-01 Gree AC Gateway, Gree AC Gateway, AC Gateway, Gateway |