BTS logoBTS logo 2

BTS E5 DS5 Intelligent Energy Storage

INTELLIGENT ENERGY STORAGE
BTS E5 … E20-D5
5 / 10 / 15 / 20 kWhBTS E5 DS5 Intelligent Energy Storage - fig

E5-DS5 Intelligent Energy Storage

  • Modular and integrated design for easy transportation and installation
  • Flexible battery capacity expansion
  • User-friendly one-button battery operation
  • Maximal battery energy with pack optimization
  • Extremely low battery self- consumption in sleep mode
  • Energy storage specially for ME / HYD 5…20KTL-3PH inverters
Datasheet
System Parameters
BTS E5-DS5 BTS E10-DS5 BTS E10-DS5 BTS E20-DS5
System BTS E5 DS5 Intelligent Energy Storage - fig 1 BTS E5 DS5 Intelligent Energy Storage - fig 2 BTS E5 DS5 Intelligent Energy Storage - fig 3 BTS E5 DS5 Intelligent Energy Storage - fig 4
Battery type LFP
Battery distribution unit BTS 5K-BDU
Number of battery distribution units 1
Battery module BTS 5K
Nurnber of battery modules 1 2 3 4
Battery total energy (kWh)’ 5. 10. 1336 20.
Usable energy (kW)’ 5. 10. 14. 19
Rated power (kW) 23 5 8. 10
Rated voltage (V) 400
Voltage range for full load (V) 350 — 425
Rated charge/discharge current (A) 7 I 14 I 21 28
Degree of protection IP65
Ambient temperature range’ -10°C — 50°C
Allowable relative humidity range 5 — 95%
Max. operating altitude’ 4000 m
v
Weight (kg) 59 110 161
Dimension (mm) 708’170’680 708’170’1100 708’170’1520 708’170′ ,.
708’170’1100
Installation Floor stand
Cooling Natural
Display LED indicators
Communication CAN
Compatible inverters Please refer to the BTS ES … 204355 configuration hsl
Battery Module
Model BTS 5K
Battery module energy (kWh) 5.12
Depth of discharge 90.00%
Rated power (W) 2500
Dimension (mm) 708*170*420
Weight (kg) 50
Battery Distribution Unit
Model BTS 5K-BDU
Max. charge/discharge current (A) 35
Dimension (mm) 708*170*200
Weight (kg) 7.5
Standard
Certificates UN 38.3, IEC 62619, IEC 62040-1, SAA, etc.
  1. Test conditions: 0.2C charge/discharge at 25°C, 100% DoD.
  2. Based on the battery cell.
  3. Please refer to the temperature derating curve.
  4. If the altitude is >2000 m, derating is required. Please refer to the derating curve.

BTS E5 / BTS E10 / BTS E15 / BTS E20-D5_EN_202206

Documents / Resources

BTS E5-DS5 Intelligent Energy Storage [pdf] Instruction Manual
E5-DS5 Intelligent Energy Storage, E5-DS5, Intelligent Energy Storage, Energy Storage

References

Leave a comment

Your email address will not be published. Required fields are marked *