BRConnect Gateway
“
Specifications
- Model: BRConnect Gateway
- Version: V1.1.0
- WiFi Standard: WiFi 4; 802.11n
- WiFi Frequency Range: 2.4 GHz
Product Usage Instructions
Scope of Delivery
The BRConnect Gateway comes with the following items:
- BRConnect Gateway unit
- Wall mount
- Power supply
- Instruction manual
- Mounting kit
Required Tools & Accessories:
- Hammer
- Drill
- Pencil
- Torx T20 screwdriver
- Spirit level
- Ethernet cable
- 230V socket
Safety Instructions
It is important to follow the safety instructions provided in
the manual:
- General: Do not carry out any work on the
BRConnect yourself. Do not open the housing. - Electrical Specialists: Follow guidelines for
handling electrical components. - End User: Keep the instruction manual
accessible for all product-related activities.
Product Overview
The BRConnect Gateway features LED indicators and connection
ports:
- LED Indicator: Indicates power status and connectivity.
- 24V DC Connection: Power input for the gateway.
- Reset Button: Allows for resetting the device.
- Ethernet LAN Socket: For connecting to the network.
Assembly
The assembly involves connecting string cables and setting up
the device as per the provided instructions.
Intended Use
The BRConnect Gateway is intended for use with the BRC Power
Manager M600-M to manage powerline connections via WiFi.
LED Overview
The LED indicator on the BRConnect Gateway provides visual
feedback based on its status:
- No Light: No power supply, check connection.
- Lights Up Blue: Indicates Bluetooth connection mode.
- Lights Up Green: Indicates power ON and connected state.
Frequently Asked Questions (FAQ)
Q: Where can I find additional languages for the product
manual?
A: Additional languages are available on our website at
www.brc-solar.de.
Q: What should I do if the LED indicator does not light
up?
A: If the LED indicator does not light up, check the power
supply first. If the issue persists, contact our support hotline
for assistance.
“`
BRConnect Gateway
Instruction manual BRConnect Gateway
1. / SCOPE OF DELIVERY…………………………………………………..1 2. / SAFETY INSTRUCTIONS………………………………………………………………………..2
A) / GENERAL…………………………………………………………………………………………………………………2 B) / ELECTRICAL SPECIALISTS………………………………………………….2 C) / END USER………………………………………………………………………………………………2 3. / PRODUCT OVERVIEW……………………………………………………………………3 A) / ASSEMBLY………………………………………………………………………………………………………………….3 B) / INTENDED USE…………………………………………………………………………..4 C) LED / LED OVERVIEW……………………………………………………………………………………………5 4. / INSTALLATION………………………………………………………………………………………….7 5. / POWER MANAGER APP………………………………………………8 6. / OPERATION AND MAINTENANCE…………………………………………….10 7. / REPLACEMENT AND REPAIR…………………………………………………..10 8. / DISPOSAL………………………………………………………………………………………..10 9. / PRODUCT COMPLIANCE AND CONTACT…………10
1. / SCOPE OF DELIVERY
/ Required tools
8
1
3
1x
1x
BRConnect
1x
9
6
7
1x
1x
1x
10
1x
2
4
1x
1x
/ Operating accessories
5
11
12
4x
1x
1x
1 BRConnect 2 3 4 5 Montagekit Scope of supply 1 BRConnect 2 Wall mount 3 Power supply 4 Instruction manual 5 Mounting kit
& 6 7 8 9 Torx T20 10 11 Ethernet 12 230V Required tools & accessories 6 Hammer 7 Drill 8 Pencil 9 Torx T20 screwdriver 10 Spirit level 11 Ethernet cable 12 230V socket
1
V1.1.0
/ ADDITIONAL LANGUAGES AVAILABLE ON OUR WEBSITE
WEBSITE WWW.BRC-SOLAR.DE
2. / SAFETY INSTRUCTIONS A)
GR
BRConnect . BRC Solar GmbH , BRConnect. BRConnect . , . , , , , . .
B)
. . . . , . . 5 . BRConnect . – . BRConnect. , BRConnect .
C)
BRConnect. . , . , .
2. / SAFETY INSTRUCTIONS
EN
A) GENERAL
The BRConnect may only be operated in accordance with the intended use and the specified technical data. Please note all instructions from BRC Solar GmbH given in the instruction manual as well as the warning notices on the BRConnect. The warning notices on the BRConnect must always be clearly legible and must not be removed, changed or manipulated. Applicable local laws, regulations, directives and standards must be given priority for operation, installation, uninstallation and maintenance. The safety instructions in the instruction manual are not complete and only serve as supplementary information.
2
B) ELECTRICAL SPECIALISTS
All work related to the product may only be carried out by qualified electricians. The electrician must comply with national and regional regulations. Please read and follow all instructions carefully before installation. If there are any uncertainties or you need detailed information call our service hotline. Electrical work may only be carried out in compliance with the 5 safety rules of electrical engineering. Only install an intact BRConnect with a complete scope of delivery. Only use the accessories included in the delivery – especially with regard to the power supply. Do not make any modifications to the BRConnect. Pay particular attention to running voltage-free string cables through the BRConnect during assembly to prevent electric shocks.
C) END USER
Under no circumstances should you carry out any work on the BRConnect yourself. Do not open the housing. Please keep the instruction manual so that it is available for all activities related to the product.
3. / PRODUCT OVERVIEW
A) / ASSEMBLY
GR EN
BRConnect 1
23 4
5a 5b
6a 6b
1 LED / LED 2 24V DC / 24V DC connection 3 / reset button 4 Ethernet LAN / Lan ethernet socket 5 1 /
cable bushing of string 1 5a S1- – / string 5b S1+ + / string +
6 2 /
cable bushing of string 2 6a S2- – / string 6b S2+ + / string +
7 3 /
cable bushing of string 3 7a S3- – / string 7b S3+ + / string +
3
V1.1.0
7a 7b
B)
GR
BRConnect , M600-M BRC Power Manager . M600-M BRConnect powerline . . BRC Power Manager, . . , 4. BRConnect, . :
BRConnect IP40 . . , . – 20°C +55°C. 2.000 . BRConnect Ethernet WLAN BRC Power Manager. BRC Power Manager.
WLAN-
WiFi 4; 802.11n
WLAN- 2,4 GHz
, . . . (https://brc-solar.de/downloads/) .
B) INTENDED USE EN
The BRConnect is a gateway which, in combination with the M600-M and the BRC Power Manager, is used for data monitoring of the photovoltaic system at module level. Data from the M600-M is communicated to the BRConnect using powerline communication via DC cables and processed there. The end user can view this data via the BRC Power Manager App, making it possible to monitor the photovoltaic system. In order to use the product as intended, a fixed installation is required, which must be carried out by a qualified electrician in accordance with the explanations under point 4. When setting up the BRConnect, please ensure compliance with the specified technical data. Pay particular attention to the following information:
The BRConnect is rated protection class IP40 and is therefore intended for indoor use. Please keep the device away from liquids, humidity and heat sources as well as direct sunlight. The product is designed for operation at ambient temperatures of – 20°C to + 55°C. The product is only approved for operation up to 2,000m above sea level. The BRConnect has Ethernet and WiFi interfaces to provide the data to the BRC Power Manager.
WiFi standard WiFi frequency range
WiFi 4; 802.11n 2.4 GHz
If the use deviates from the use explained here, this is considered improper use. The manufacturer
assumes no liability for damage caused by improper use. The information in the limited product warranty applies (https://brc-solar.de/downloads/).
4
C) LED / LED OVERVIEW
GR EN
LED / LED signal
/ Explanation
/ no light / lights up blue / s lowly flashes blue / lights up green / slowly flashes green / quickly flashes green / lights up yellow / lights up red
BRConnect , . , . / BRConnect has no power supply or is defective, check power supply. Otherwise contact support hotline. ( 7-8 ), Bluetooth Power Manager App . /
Visible immediately after starting (approx. 7-8 sec), then switches to Bluetooth connection mode and can be seen again
as normal state after successful setup via Power Manager App. Bluetooth /tablet. Power Manager, (. 8) 6. BRConnect = 1 on, 1 off. / Waiting for Bluetooth connection with mobile phone/tablet. Open Power Manager App, follow the app instructions (see page 8) up to step 6. Now the search for BRConnect is running = flashing frequency 1 second on, 1 second off. Bluetooth /tablet. Power Manager. IP WLAN Power Manager Ethernet. /
Bluetooth connection with mobile phone/tablet established. Set string information in Power Manager App. Enter the IP address and WiFi
settings via the Power Manager App or plug in the Ethernet cable. ( , ) = 1 , 1 . / Establishing connection to local network (no action necessary, check local network connection if the status persists) = flashing frequency 1 second on, 1 second off. , ( , ). ) = 200ms on, 200ms off. / Network connection active, establishing connection to cloud (no action necessary, check internet connection if the status persists) = flashing frequency 200ms on, 200ms off. , , BRConnect . , . /
Warning, functionality limited, please disconnect BRConnect from the power supply and reconnect it to restart.
If the signal persists, please contact support. , BRConnect . BRConnect . , . /
Error, BRConnect may be defective. Please disconnect BRConnect from the power supply and reconnect it to restart.
If the signal persists, please contact support.
5
6
V1.1.0
4. / INSTALLATION
GR EN
1 : , 4 ( 6 mm). 4 , 4 , . Attach the wall mount: Mark the position with a pencil and spirit level, drill 4 holes (size 6mm) and sink 4 dowel pins, mount the wall mount with 4 screws, washers and a screwdriver.
2 BRConnect : , .
Clip BRConnect onto the designated pins of the wall mount: To do this, press evenly on both sides until
you hear a click.
klick / click
klick / click
BRConnect
BRConnect
3 :
.
! ,
.
,
. DC: . , , DC.
Pass string cable through cable bushing: Make sure that the
string cable is voltage-free when passing through.
!
Pay attention to the correct connection arrangement of the string cables, otherwise errors or inoperability may occur. Note the
sticker on the top and peel it off.
Connect the string cable to the inverter with DC-switch off: Pay
attention to correct polarity.
Connect the string cable to the PV system, then switch on the
DC-side of the inverter.
S1+ 1 + / string 1 +
S2- 2 – / string 2 –
S1- 1 – / string 1 –
S2+ 2 + / string 2 +
4 24V Ethernet : LED BRConnect Bluetooth. Connect 24V and Ethernet: BRConnect LED lights up briefly in blue, then flashes slowly in blue and waits for Bluetooth connection.
BRConnect
5. / POWER MANAGER APP GR EN
1 : App Store Play Store / :
App Store Play Store.
2 ,
. / Register, log in, and click the plus symbol to set up a new plant. Internet connection is required for this.
3
. / Fill in general information and owner information.
4
wallbox . /Enter solar module and inverter data and select whether a battery storage or a wallbox is integrated.
5
. / Select Start configuration to continue the setup, or Save & configure later.
BRConnect
!
. / The optimizers must already be installed, and the BRConnect must be
powered for further setup.
6 BRConnect
Bluetooth. BRConnect . / BRConnect automatically waits for Bluetooth connection after starting. Select the BRConnect via the app and connect.
BRConnect
7
/
8
Video instructions for assembly and app setup
V1.1.0
7 (M600-M)
. / Enter how many optimizers (M600-M) are connected per string.
8 BRConnect Internet
WLAN Ethernet, . / Connect the BRConnect to the internet via WiFi or Ethernet. The app will then search for the available optimizers.
9
drag & drop . / Create a string plan using drag & drop and place the optimizers.
10 . /
Successful completion of the setup.
9
V1.1.0
6.
BRConnect . . BRConnect – .
7.
GR
BRConnect . ( 4):
DC. . BRConnect . Ethernet. . BRConnect ‘ . .
8.
. , BRConnect .
9.
BRC Solar GmbH, Gehrnstraße 7 D-76275 Ettlingen, , BRConnect , BRConnect . (www.brc-solar.de) BRC Solar GmbH.
6. OPERATION AND MAINTENANCE
Only clean the BRConnect with a dry, lint-free cloth. Do not use cleaning agents or solvents. The BRConnect is maintenance-free; If a problem persists, contact support.
EN
7. REPLACEMENT AND REPAIR
The steps for dismounting the BRConnect must be carried out in the reverse order of installation (see Chapter 4):
Switch off the DC-side of the inverter. Ensure that the string cables are voltage-free. Remove the power supply to disconnect the BRConnect from the circuit. Remove the Ethernet cable. Release the string cables from the cable bushings. Dismount the BRConnect by evenly removing it straight from the wall mount. Repairs must not be carried out.
8. DISPOSAL
The transport packaging can be recycled under local waste disposal. After use, the BRConnect and all associated components are to be disposed of as electronic waste in accordance with the laws applicable in the country.
9. PRODUCT COMPLIANCE AND CONTACT
BRC Solar GmbH, located at Gehrnstraße 7 in D-76275 Ettlingen, Germany, declares that the product BRConnect complies with the basic requirements of the national directives if the installation instructions are observed and the product is used as intended. A complete declaration of conformity can be found on the website (www.brc-solar.de) of BRC Solar GmbH.
10
Power Manager App
Power Manager App Apple App Store
Power Manager App Google Play Store
BRConnect Gateway
Instruction manual BRConnect Gateway
www.brc-solar.de
Documents / Resources
![]() |
BRC BRConnect Gateway [pdf] Instruction Manual V1.1.0, BRConnect Gateway, BRConnect, Gateway |