Amerec Pro 105/3Phase (9053-403), Contactor Box (9202-133), H3 Control (9201-041)

Amerec Pro 105/3Phase 10.5kW Sauna Heater User Manual

Models: Pro 105/3Phase (9053-403), Contactor Box (9202-133), H3 Control (9201-041)

1. Introduction

This manual provides essential instructions for the safe installation, operation, and maintenance of your Amerec Pro 105/3Phase 10.5kW Sauna Heater, Contactor Box, and H3 Control. Please read this manual thoroughly before installation and use to ensure proper function and safety. This system is designed for large, commercial-sized sauna rooms ranging from 390 to 600 cubic feet.

2. Important Safety Information

3. Setup and Installation

The Amerec Pro 105/3Phase sauna heater system requires professional installation. This section provides an overview; refer to the detailed installation guide provided with the product for complete instructions.

3.1. Components Overview

3.2. Heater Placement

Position the Pro 105 heater in the sauna room according to the provided installation diagrams, ensuring minimum clearances from walls, benches, and ceiling are maintained. The heater is floor-standing.

Amerec Pro 105 Sauna Heater

Image 1: Amerec Pro 105 Sauna Heater. This image shows the floor-standing heater unit, typically placed in a corner of the sauna room.

3.3. Rock Placement

Carefully place the Vulcanite rocks into the heater's rock compartment. Ensure rocks are stacked loosely to allow for proper air circulation through the heating elements. Do not pack rocks tightly. The heating elements must be completely covered by rocks.

3.4. Contactor Box Installation

The Contactor Box (9202-133) should be mounted outside the sauna room in a dry, accessible location. Follow the wiring diagrams provided with the Contactor Box for connecting it to the main power supply (208V/3Phase) and to the Pro 105 heater.

3.5. H3 Control Installation

Mount the H3 Control (9201-041) inside or outside the sauna room, depending on your preference and local codes. Connect the control unit to the Contactor Box using the specified low-voltage wiring. Ensure all connections are secure.

Amerec H3 Sauna Control Panel

Image 2: Amerec H3 Sauna Control Panel. This image displays the compact H3 control unit with a digital display and buttons for power, timer, light, and temperature adjustment.

3.6. Electrical Connections

All electrical wiring must comply with local and national electrical codes. The Pro 105 heater operates on 208V/3Phase power. Ensure the correct gauge wiring and circuit breakers are used. A qualified electrician must perform these connections.

4. Operating Instructions

The H3 Control simplifies the operation of your Amerec sauna heater.

4.1. Powering On/Off

4.2. Setting the Timer

The H3 Control features a 60-minute timer. This timer controls the duration of the heating cycle.

4.3. Adjusting Temperature

4.4. Controlling Lighting

4.5. Creating Steam (Löyly)

Once the heater has reached operating temperature, you may carefully ladle small amounts of water onto the hot rocks to create steam. Do not pour excessive water, as this can cool the elements and damage the heater. Use only clean water.

5. Maintenance

Regular maintenance ensures the longevity and safe operation of your Amerec sauna system.

5.1. Heater Cleaning

5.2. Rock Inspection and Replacement

5.3. Sauna Room Maintenance

6. Troubleshooting

If you encounter issues with your Amerec sauna system, refer to the following common problems and solutions. For complex issues, contact a qualified service technician.

ProblemPossible CauseSolution
Heater does not turn on.No power to the unit.
Control unit not connected.
Overheat protection activated.
Check circuit breaker/fuse. Ensure main power switch is on. Verify control unit wiring. Allow heater to cool down, then reset if applicable.
Heater turns on but does not heat.Heating elements failed.
Contactor box issue.
Incorrect temperature setting.
Contact a qualified electrician to inspect heating elements and contactor box. Verify temperature setting on H3 Control.
Sauna not reaching desired temperature.Sauna room too large for heater.
Poor insulation.
Improper rock placement.
Door/ventilation leaks.
Ensure room size is within 390-600 cu ft. Check insulation. Rearrange rocks for better airflow. Seal any air leaks.
H3 Control display is blank or unresponsive.No power to control.
Loose connection.
Control unit malfunction.
Check power to the contactor box. Verify wiring between control and contactor box. If issue persists, contact support.

7. Specifications

FeatureSpecification
Heater ModelAmerec Pro 105 (9053-403)
Contactor Box ModelAmerec 9202-133
Control ModelAmerec H3 (9201-041)
Power SourceAC
Voltage208 Volts (AC)
Phase3 Phase
Wattage10.5 kW
Sauna Room Volume390-600 cu ft
Included Rocks132 lbs Vulcanite rocks
Item Weight210 pounds (total system)
Package Dimensions29 x 20 x 19 inches

8. Warranty and Support

For warranty information, please refer to the documentation provided with your purchase or contact your authorized Amerec dealer. For technical support or service inquiries, please contact the seller or Amerec customer service. Keep your purchase receipt as proof of purchase for warranty claims.

This product is typically supported by a 30-day return policy from the seller, Steam and Sauna Connection. For specific support, please reach out to them directly.

Related Documents - Pro 105/3Phase (9053-403), Contactor Box (9202-133), H3 Control (9201-041)

Preview Amerec Sauna Heater Installation and Operating Instructions
Comprehensive guide for installing and operating Amerec Pro, Laava, and Octa series sauna heaters with SC control panels. Covers safety, electrical hook-up, operation, maintenance, and troubleshooting.
Preview Amerec Pro & Laava Sauna Heater Installation and Operating Instructions
Detailed installation and operating instructions for Amerec Pro and Laava electric sauna heaters, compatible with SL2-C (SaunaLogic 2) and External Switch controls. This guide covers safety warnings, step-by-step installation, electrical hook-up, wiring diagrams, room construction requirements, ventilation, maintenance, and troubleshooting for models 1105-XXX and 1105-XXX2. Includes essential information for proper setup and use.
Preview Amerec AK Series Steam Generator Specification Sheet
Detailed specification sheet for Amerec AK Series steam generators, covering performance features, control options (K60, KT60), sizing and rough-in guide, electrical and plumbing requirements, and installation instructions.
Preview Amerec Himalaya SL2 Series Sauna Heater Installation and Operating Instructions
Comprehensive guide for installing and operating Amerec Himalaya SL2 Series sauna heaters (Models 7.0 and 9.0) with SaunaLogic 2 control. Includes safety warnings, electrical hook-up, room construction, maintenance, troubleshooting, and BWT technology.
Preview Amerec ADK Automatic Drain Kit: Installation and Service Instructions
Detailed installation and service instructions for the Amerec ADK Automatic Drain Kit. This guide covers fitting the kit to Amerec AK/3K and AG/3G Steambath Generators, including plumbing, wiring, motor mounting, operational testing, and troubleshooting. Essential safety warnings and professional installation requirements are highlighted.
Preview Amerec AK Series Steam Generator Specification Sheet
Detailed specification sheet for Amerec AK Series steam generators, covering performance features, control options (K2 Touch Screen, K3 3-Button), sizing guide, electrical and plumbing requirements, and installation instructions.