Tecmojo 12U
TECMOJO 12U Open Frame Network Rack: Installation and Operation Manual
Model: 12U
1. Introduction
This manual provides detailed instructions for the assembly, installation, and operation of your TECMOJO 12U Open Frame Network Rack. Please read these instructions carefully before beginning assembly to ensure proper setup and safe use of the product. Retain this manual for future reference.
2. Product Overview
The TECMOJO 12U Open Frame Network Rack is designed for organizing IT and AV equipment. It features a 4-post design, mobility with casters, and includes server shelves and mounting hardware for 19-inch network, audio, and video devices.
2.1 Key Features
- Load Capacity: Constructed from durable cold-rolled steel, offering a load-bearing capacity of 260 lbs (floor-mounted).
- Mobility: Equipped with four casters for easy movement. Casters include brakes for stability.
- Included Shelves: Comes with two ventilated 1U server shelves.
- Anti-Slip Design: Features anti-slip shelf stops to secure devices on shelves.
- Cable Management: Integrated grommet holes on the top panel for organized cable routing.
- Versatile Mounting: Supports both standalone and wall-mounted configurations.
2.2 Components Included
Verify that all components listed below are present before beginning assembly:

Figure 1: Included Components
- 12U Open Frame Server Rack (main frame components)
- 1U 14-inch Rack Shelf x 2
- Shelf Stop x 4
- Rack Shelf Back Support x 4
- Caster x 4
- L Wrench x 1
- Velcro Strap x 4
- Cable Tie x 4
- 10-32 Screw x 25 (for equipment mounting)
- M5*30 Wall Mounting Screw x 4
- Mounting Hole Drilling Template x 1
3. Specifications
| Attribute | Value |
|---|---|
| Model | 12U |
| Product Dimensions (D x W x H) | 20.2" x 20.5" x 21.0" (512mm x 520mm x 534mm) |
| Item Weight | 31.7 pounds |
| Material | Alloy Steel (Cold Rolled Steel) |
| Color | Black |
| Load Capacity (Floor-mounted) | 260 lbs |
| Load Capacity (Wall-mounted) | 130 lbs |
| Rack Type | 4-Post Open Frame |

Figure 2: Product Dimensions
4. Setup and Assembly
Assembly typically requires one person and takes approximately 30-60 minutes. A power screwdriver is recommended for efficiency, though an L wrench is provided.
4.1 Assembly Steps
- Unpack Components: Carefully remove all parts from the packaging and verify against the 'Components Included' list.
- Assemble Frame: Connect the side posts to the top and bottom frame sections using the provided hardware. Ensure all screws are tightened securely.
- Install Casters: Attach the four casters to the bottom frame. Ensure the casters with brakes are positioned for easy access.
- Install Shelves: Position the 1U ventilated shelves at desired heights within the rack. Secure them using the provided 10-32 screws.
- Attach Shelf Stops and Back Supports: Install the anti-slip shelf stops on the shelves to prevent equipment movement. Attach the rack shelf back supports for enhanced stability and load capacity.

Figure 3: Rack with Equipment, showing Anti-Slip Shelf Stops and Back Support
4.2 Wall Mounting (Optional)
For wall-mounted installations, use the included mounting hole drilling template and M5*30 wall mounting screws. Ensure the mounting surface can support the rack's weight and equipment (up to 130 lbs).

Figure 4: Wall Mounting Template and Option
5. Operating Instructions
5.1 Installing Equipment
- Align your 19-inch rack-mountable equipment with the tapped holes on the rack posts.
- Use the provided 10-32 screws to secure equipment. Ensure equipment is evenly distributed to maintain stability.
- For non-rack-mountable equipment, place them on the ventilated shelves and use the anti-slip shelf stops to prevent movement.
5.2 Cable Management
Utilize the grommet holes on the top panel for routing cables. Use the included Velcro straps and cable ties to organize and secure cables, preventing strain and improving airflow.

Figure 5: Detailed Features: Grommet Holes, Tapped Holes, and Casters
5.3 Mobility and Stability
- To move the rack, ensure all caster brakes are disengaged.
- When the rack is in its desired position, engage the caster brakes to prevent unintended movement.
6. Maintenance
- Cleaning: Wipe the rack surfaces with a soft, damp cloth. Avoid abrasive cleaners that may damage the finish.
- Inspection: Periodically check all screws and connections to ensure they remain tight. Re-tighten as necessary.
- Load Distribution: Ensure equipment weight is evenly distributed to maintain rack stability and prevent stress on components.
7. Troubleshooting
- Rack Instability: Ensure all frame screws are fully tightened. Verify that caster brakes are engaged when the rack is stationary. Check for uneven weight distribution of equipment.
- Difficulty Mounting Equipment: Ensure equipment is 19-inch rack-mountable. If holes do not align, verify the rack posts are correctly assembled and not warped. Some minor adjustments may be needed during initial setup.
- Missing Parts: Refer to the 'Components Included' list. If parts are missing, contact Tecmojo customer support.
8. Warranty and Support
For warranty information or technical support, please refer to the official Tecmojo website or contact their customer service department. Keep your purchase receipt for warranty claims.
Ask a question about this manual
Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.