EMKE TR-DEVC

EMKE Bathroom Radiator and Towel Warmer User Manual

Model: TR-DEVC (75x40 cm, 244W, Anthracite)

1. Product Overview

The EMKE Bathroom Radiator and Towel Warmer is designed to provide efficient heating for your bathroom while also serving as a convenient towel drying and warming solution. This hot water radiator, with its anthracite finish and compact dimensions, integrates seamlessly into various interior designs.

EMKE Bathroom Radiator installed in a modern bathroom

Image 1.1: The EMKE Bathroom Radiator and Towel Warmer, anthracite, installed in a modern bathroom setting.

This manual provides essential information for the safe and correct installation, operation, and maintenance of your EMKE radiator. Please read it thoroughly before installation and keep it for future reference.

2. Safety Information

Please observe the following safety instructions to prevent injury and damage to the product.

3. Setup and Installation

The EMKE Bathroom Radiator is designed for straightforward installation. A detailed, illustrated assembly manual is included in the packaging. Please follow these general steps and consult the provided manual for specific instructions.

3.1. Package Contents

Verify that all components are present before beginning installation.

Included accessories for EMKE radiator: blind plugs, long screws, rubber rings, small screws

Image 3.1: Included accessories for installation, such as blind plugs, screws, and rubber rings.

3.2. Tools Required (Not Included)

3.3. Installation Steps

  1. Choose Location: Select a suitable wall location in your bathroom, ensuring sufficient space around the radiator for heat circulation and towel hanging.
  2. Mark Drilling Points: Using the provided mounting brackets and a spirit level, mark the drilling points on the wall.
  3. Drill Holes: Drill holes at the marked points and insert appropriate wall plugs.
  4. Mount Brackets: Securely attach the mounting brackets to the wall using the long screws. The adjustable wall distance allows for a range of 90-105 mm from the wall to the outer surface of the radiator.
  5. Diagram showing adjustable wall distance for EMKE radiator, ranging from 90mm to 105mm

    Image 3.2: The adjustable wall distance feature, allowing for flexible installation between 90-105 mm.

  6. Attach Radiator: Carefully hang the radiator onto the mounted brackets.
  7. Connect to Heating System: Connect the radiator to your hot water heating system. The radiator features a G1/2" connection thread with a 50 mm connection dimension, typically for a lower central external connection. Side connections are also possible.
  8. Diagram showing central and side connection options for the radiator, with G1/2 inch universal thread and 50mm connection distance

    Image 3.3: Illustration of central and side connection options. Note that valves are not included and must be purchased separately.

  9. Install Valves: Install the appropriate thermostat and shut-off valves (not included) according to their respective instructions.
  10. Bleed Radiator: After filling the heating system, bleed the radiator to remove any trapped air.
  11. Check for Leaks: Once the system is pressurized, carefully check all connections for leaks.

4. Operating Instructions

The EMKE Bathroom Radiator operates as part of your central hot water heating system.

5. Maintenance

Regular maintenance ensures the longevity and efficient operation of your EMKE radiator.

6. Troubleshooting

If you encounter issues with your EMKE radiator, refer to the table below for common problems and solutions. For complex issues, contact a qualified heating engineer.

ProblemPossible CauseSolution
Radiator not heating up or only partially warm.
  • Air trapped in the radiator.
  • Thermostat valve closed or set too low.
  • System pressure too low.
  • Blockage in the system.
  • Bleed the radiator using a radiator key.
  • Open the thermostat valve or increase the setting.
  • Check and increase the system pressure (consult your boiler manual or a professional).
  • Contact a qualified heating engineer.
Water leaking from connections.
  • Loose connections.
  • Damaged seals.
  • Tighten connections carefully.
  • Replace damaged seals. If unsure, contact a qualified plumber.
Unusual noises (e.g., gurgling).
  • Air in the system.
  • System pressure issues.
  • Bleed the radiator.
  • Check system pressure.

7. Technical Specifications

FeatureDetail
BrandEMKE
Model NumberTR-DEVC
Dimensions (H x W)750 mm x 400 mm (75 cm x 40 cm)
Heat Output244 W
Number of Heating Bars13
Suitable Room SizeApprox. 3 m²
Adjustable Wall Distance90 - 105 mm
Connection TypeHot Water Central Heating System
Connection ThreadG1/2"
Connection Dimension50 mm (center distance)
MaterialSPCC Steel with Environmental Protection Powder Coating
ColorAnthracite
Max. Operating Temperature95 °C
Recommended Flow/Return/Ambient Temp.75 °C / 65 °C / 20 °C
Standard ComplianceEN442
Product Weight5.34 kg
Table of product information showing various radiator sizes, heat outputs, and applicable room areas

Image 7.1: Detailed product information table, including dimensions, heat output, and suitable room area for various models.

8. Warranty and Support

EMKE is committed to providing high-quality products and customer satisfaction.

Related Documents - TR-DEVC

Preview EMKE SFTR Towel Rail Installation Instructions
Comprehensive installation guide for the EMKE SFTR towel rail, covering preparation, parts, step-by-step installation, and post-installation care.
Preview EMKE PTR PCTR Electric Towel Rail Installation and User Manual
Comprehensive installation and user guide for the EMKE PTR PCTR electric towel rail. Learn about setup, operation modes, app connectivity, and troubleshooting for your heated towel rail.
Preview EMKE ESFTR Electric Radiator Instruction Manual
Comprehensive instruction manual for the EMKE ESFTR Electric Radiator, covering installation, operation, technical specifications, app connectivity, and safety guidelines.
Preview EMKE PTR5050X4B/PTR5050X4W Installation Instructions
Comprehensive installation guide for EMKE PTR5050X4B and PTR5050X4W heated towel rails, covering parts, assembly steps, digital display operation, and safety warnings.
Preview EMKE Electric Towel Rack Installation Instructions
Comprehensive installation guide for EMKE electric towel racks, covering models like ESFTR8540X5W. Includes step-by-step instructions, digital display setup, and TUYA app connection for safe and proper mounting of your heated towel rail.
Preview EMKE PTR PCTR Electric Towel Rail Installation and User Manual
Comprehensive installation and user manual for the EMKE PTR PCTR electric towel rail heater, covering setup, operation, app control, and troubleshooting.