Legrand 088192

Legrand Renov Floor Box 16/24M Instruction Manual

Model: 088192

Introduction

This manual provides essential information for the safe and efficient installation, operation, and maintenance of the Legrand Renov Floor Box 16/24M (Model 088192). Please read this manual thoroughly before using the product and retain it for future reference.

The Legrand Renov Floor Box is designed for organizing electrical installations within floor structures, providing a robust and integrated solution for power and data distribution.

Safety Information

WARNING: Electrical installations should only be performed by qualified personnel in accordance with all local and national electrical codes and regulations.

  • Always disconnect power before installing or servicing the floor box.
  • Ensure all connections are secure and properly insulated.
  • Do not expose the product to excessive moisture or extreme temperatures.
  • Use appropriate personal protective equipment (PPE) during installation.
  • Verify that the product is suitable for the intended application and environment.

Package Contents

Verify that all components are present and undamaged before proceeding with installation.

  • 1 x Legrand Renov Floor Box 16/24M (Model 088192)
  • Instruction Manual (this document)
  • Additional components may vary based on specific product configuration.

Setup and Installation

The Legrand Renov Floor Box 16/24M is designed for integration into floor structures. Proper installation ensures optimal performance and safety.

  1. Preparation:
    • Ensure the installation area is clean, dry, and free from obstructions.
    • Confirm that the floor opening dimensions match the specifications of the floor box (25 x 25 x 10 cm).
    • Gather all necessary tools, including screwdrivers, wire strippers, and safety equipment.
  2. Mounting the Floor Box:
    • Carefully place the floor box into the prepared opening in the floor.
    • Secure the box using appropriate fasteners (not included, refer to local building codes for suitable fixings) to ensure it is flush and stable with the floor surface.
  3. Wiring Connections:
    • Route electrical cables and data lines into the floor box through the designated entry points.
    • Connect wires to the appropriate modules or outlets within the box, following standard electrical practices and local codes. Ensure proper grounding.
    • Verify all connections are tight and secure.
  4. Module Installation (if applicable):
    • Install any required electrical outlets, data ports, or other modules into the floor box's internal frame.
    • Ensure modules are correctly seated and secured.
  5. Final Assembly:
    • Attach the cover or lid to the floor box, ensuring it fits securely and is flush with the floor.
    • Test all installed outlets and connections for proper functionality before use.

Operating Instructions

Once installed, the Legrand Renov Floor Box operates as a passive distribution point for power and data. Its primary function is to provide accessible and protected connections.

  • Accessing Connections: To access the internal connections, carefully open the lid or cover of the floor box.
  • Connecting Devices: Plug electrical devices or data cables into the installed outlets or ports within the floor box.
  • Closing the Box: After use, ensure the lid is securely closed to protect the internal components from dust, debris, and accidental damage.
  • Load Capacity: Do not exceed the maximum electrical load capacity of the installed outlets or the overall circuit. Refer to the specifications of the installed modules for details.

Maintenance

Regular maintenance ensures the longevity and safe operation of your Legrand Renov Floor Box.

  • Cleaning: Periodically clean the exterior of the floor box with a soft, damp cloth. Avoid abrasive cleaners or solvents. Ensure the box is dry before closing the lid.
  • Inspection: Annually inspect the floor box for any signs of wear, damage, or loose connections. Check the integrity of the lid and seals.
  • Internal Check: If accessible and safe to do so (with power disconnected), periodically check internal wiring and connections for tightness and corrosion.
  • Replacement: If any part of the floor box or its internal components becomes damaged, replace it immediately with genuine Legrand parts or equivalent.

Troubleshooting

This section addresses common issues you might encounter with the Legrand Renov Floor Box.

ProblemPossible CauseSolution
No power from outlets.
  • Circuit breaker tripped.
  • Loose wiring connection.
  • Faulty outlet module.
  • Check and reset the circuit breaker.
  • (With power off) Inspect and tighten wiring connections.
  • Replace the faulty outlet module.
Data connection issues.
  • Loose data cable.
  • Faulty data module.
  • Incorrect wiring.
  • Ensure data cables are securely plugged in.
  • Replace the faulty data module.
  • (With power off) Verify data wiring according to standards.
Lid does not close properly.
  • Obstruction inside the box.
  • Damaged lid or hinges.
  • Remove any objects obstructing the lid.
  • Inspect for damage; replace if necessary.

If you are unable to resolve an issue, contact a qualified electrician or Legrand customer support.

Specifications

FeatureDetail
Model Number088192
Product Dimensions (L x W x H)25 x 25 x 10 cm
Weight400 grams
BrandLegrand
Included ComponentsFloor Box (Cuve)
TypeRenov Floor Box (Bac cuve Renov Caisse de sol)

Warranty and Support

Legrand products are manufactured to high-quality standards. For specific warranty information, please refer to the warranty card included with your purchase or visit the official Legrand website.

For technical assistance, product inquiries, or to report an issue, please contact Legrand customer support through their official channels. Contact information can typically be found on the Legrand website or product packaging.

Legrand Official Website: www.legrand.com

Related Documents - 088192

Preview Legrand Boîtes de sol - Gamme couvercle recouvrant pour chape béton | Fiche Technique
Fiche technique Legrand détaillant la gamme de boîtes de sol à couvercle recouvrant pour chape béton, incluant références, dimensions, installation, caractéristiques techniques, accessoires et pièces détachées.
Preview Three Bill Pay Price Guide: Plans, Rates, and Add-ons
A comprehensive guide to Three's Bill Pay mobile plans, detailing pricing, data allowances, call and text rates, roaming charges, international rates, and available add-ons.
Preview Unifix 20.1 WB Solar Panel Mounting Bracket for Boats - Uniteck
Installation, safety, and warranty guide for the Uniteck Unifix 20.1 WB solar panel mounting bracket, designed for marine applications. Includes panel compatibility, performance data, and assembly instructions.
Preview Theben TECTA D280i AN - Détecteur de Mouvement Extérieur PIR - Spécifications Techniques et Fonctionnalités
Informations détaillées sur le détecteur de mouvement PIR mural extérieur Theben TECTA D280i AN, incluant fonctionnalités, spécifications techniques, zone de détection et accessoires. Optimisé pour les moteurs de recherche.
Preview FS S3260-24M Instruction Manuals: Safety and Compliance Information
Safety and compliance information for the FS S3260-24M, covering FCC, CE, UKCA, ISED, WEEE regulations, and grounding requirements.
Preview Three Multi Essentials SIM 24M Plan Terms and Conditions
Overview of the Three Multi Essentials SIM 24M price plan, including allowance details, roaming information, minimum term requirements, and charging policies.

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.