SCS Sentinel OneGate 2

Rate this product if you’ve used it
Download PDF
Contents

SCS Sentinel OneGate 2 Swing Gate Automation System User Manual

Model: MBA0054-12V | Brand: SCS Sentinel

1. Introduction

Thank you for choosing the SCS Sentinel OneGate 2 Swing Gate Automation System. This manual provides essential information for the safe and efficient installation, operation, and maintenance of your gate opener. Please read this manual thoroughly before beginning installation or operation to ensure proper functionality and to prevent damage or injury.

2. Safety Information

Always observe the following safety precautions to reduce the risk of injury or damage:

  • Ensure all electrical connections are made by a qualified electrician and comply with local regulations.
  • Disconnect power to the system before performing any maintenance or repairs.
  • Keep children and pets away from the gate area during operation.
  • Do not attempt to operate the gate if any part of the system is damaged or malfunctioning.
  • Install safety devices such as photocells to prevent the gate from closing on obstacles.
  • Ensure the gate is properly balanced and moves freely before installing the automation system.

3. Package Contents

Verify that all components are present in the package:

  • 2 x 12V Articulated Arm Motors (1 main motor + 1 slave motor)
  • 2 x 4-Channel Remote Controls
  • 1 x 12V Flashing Warning Light
  • Mounting Screws and Tabs
  • Key for Manual Unlock
  • Instruction Manual (this document)
SCS Sentinel OneGate 2 swing gate automation kit with two motors, two remote controls, and a flashing light.

This image displays the complete SCS Sentinel OneGate 2 kit, including the two grey articulated arm motors, two grey four-channel remote controls, and a clear flashing warning light. These components are essential for automating a swing gate.

4. Setup and Installation

The installation process involves three main steps: mechanical installation, electrical connection, and programming.

Diagram showing three steps for installing the SCS Sentinel swing gate automation: mechanical installation, electrical connection, and programming/synchronization.

This diagram illustrates the three primary stages of installing the OneGate 2 system: first, the mechanical mounting of the motors to the gate and posts; second, connecting the electrical wiring; and third, programming and synchronizing the remote controls with the gate operators.

4.1 Mechanical Installation

Mount the articulated arm motors securely to your gate posts and gate leaves. Ensure the arms have a clear range of motion and that the gate can open and close smoothly without obstruction. Refer to the detailed diagrams in the included installation guide for precise measurements and mounting positions. The system is designed for gates up to 4 meters in length and 400 kg maximum weight.

4.2 Electrical Connection

Connect the 12V power supply to the control unit. Wire the main and slave motors according to the provided wiring diagram. If using optional accessories like photocells or an external keypad, connect them to the designated terminals on the control board. Ensure all connections are tight and insulated to prevent short circuits.

4.3 Programming and Synchronization

After mechanical and electrical installation, the system needs to be programmed. This typically involves a learning procedure where the gate travels its full open and close cycles to determine its limits. Follow the specific programming steps outlined in the detailed installation guide to synchronize the remote controls and set desired functionalities such as automatic closing time, pedestrian opening, and obstacle sensitivity.

5. Operating Instructions

5.1 Remote Control Operation

Your system comes with two 4-channel remote controls. Each button can be programmed to perform a specific function, such as full opening, partial (pedestrian) opening, or stopping the gate. Press the assigned button once to activate the gate. Pressing it again during operation will typically stop the gate.

Close-up of the SCS Sentinel four-channel remote control with four white buttons and a metal keyring.

A detailed view of the grey four-channel remote control, featuring four distinct white buttons for controlling various gate functions and a sturdy metal keyring for attachment.

5.2 Gate Functions

  • Full Opening: Opens both gate leaves completely.
  • Partial (Pedestrian) Opening: Opens only one gate leaf for pedestrian access.
  • Slow End of Race: The gate slows down as it approaches its fully open or closed position for smoother operation.
  • Stop on Obstacle: If an obstacle is detected (e.g., by photocells), the gate will stop or reverse its movement.
  • Automatic Closing: The gate will automatically close after a set delay (requires photocells for safety).
  • Manual Unlocking: In case of power failure, use the provided key to manually unlock the motors and operate the gate by hand.
  • Learning the Race: The system learns the gate's travel limits during initial setup or after a reset.
Illustration of a swing gate automated by SCS Sentinel OneGate 2 motors, shown in the fully open position.

An illustrative image depicting a double swing gate, equipped with the SCS Sentinel OneGate 2 articulated arm motors, fully opened to allow passage. The motors are discreetly mounted on the gate posts.

Close-up of the SCS Sentinel 12V flashing warning light with a clear dome and grey base.

This image shows the 12V flashing warning light, designed to alert pedestrians and vehicles when the gate is in motion. It has a clear, ribbed dome and a dark grey base.

6. Maintenance

Regular maintenance ensures the longevity and reliable operation of your gate automation system:

  • Monthly: Check for any obstructions in the gate's path. Clean the photocells (if installed) to ensure proper function.
  • Quarterly: Inspect all mounting hardware for tightness. Lubricate moving parts of the gate hinges and motor arms with appropriate grease.
  • Annually: Have a qualified technician inspect the electrical connections and overall system performance.
  • Keep the area around the motors clean and free of debris.

7. Troubleshooting

Refer to the table below for common issues and their potential solutions:

ProblemPossible CauseSolution
Gate does not respond to remote control.Dead remote battery; remote out of range; remote not programmed; power outage.Replace remote battery; move closer to gate; reprogram remote; check power supply.
Gate stops or reverses unexpectedly.Obstruction in gate path; dirty photocells; sensitivity setting too high.Remove obstruction; clean photocells; adjust sensitivity setting (refer to programming guide).
Gate opens partially.Partial opening mode activated; limits not set correctly.Ensure full opening button is pressed; re-run the learning procedure to set limits.
Motors make unusual noise.Lack of lubrication; worn parts; obstruction.Lubricate moving parts; inspect for worn components; check for obstructions.

8. Specifications

FeatureDetail
ModelOneGate 2
Item Model Number3701085200138
Manufacturer Part NumberMBA0054
Voltage12 Volts
Max Gate Length4 metres
Max Gate Weight400 kg
Product Dimensions30 x 41 x 31 cm
Item Weight1 kg
Operation ModeElectric
Recommended UseRemote Control

9. Warranty and Support

This product is covered by a manufacturer's warranty. Please refer to the warranty card included in your package for specific terms and conditions. For technical support, troubleshooting assistance, or to inquire about replacement parts, please visit the official SCS Sentinel website or contact their customer service department.

Official Website: www.scs-sentinel.com

Documents and downloads

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.

Was this page helpful?