1. Introduction
This manual provides essential information for the proper installation, operation, and maintenance of the Caleffi 302 631 Boiler Group. Please read these instructions carefully before installation and use to ensure safe and efficient operation. Retain this manual for future reference.
Important Safety Information: Always ensure that installation and maintenance are performed by qualified personnel in accordance with local regulations and standards. Disconnect power and depressurize the system before any service.
2. Product Overview and Components
The Caleffi 302 631 Boiler Group is a pre-assembled safety unit designed for home heating systems with a power output up to 50 kW. It is constructed from durable brass and includes key safety and operational components.

Figure 1: Caleffi 302 631 Boiler Group. This image displays the Caleffi 302 631 Boiler Group, a pre-assembled unit designed for home heaters. It features a brass body, a visible pressure gauge for monitoring system pressure, a safety valve with a red cap for pressure relief, and an automatic quick bleed vent at the top for air removal. The unit is shown resting on a grey insulating material.
Key components include:
- Pressure Gauge: Indicates the current pressure within the boiler system.
- Safety Valve: Automatically releases excess pressure to prevent system damage. Features a red cap.
- Quick Bleed Vent: Automatically expels air from the system, improving efficiency and preventing airlocks.
3. Setup and Installation
The Caleffi 302 631 Boiler Group is designed for straightforward installation. It is suitable for heating systems up to 50 kW, adhering to DIN 4751 standards.
3.1 Pre-Installation Checks
- Verify that the boiler group is compatible with your heating system's specifications.
- Inspect the unit for any visible damage from shipping.
- Ensure all necessary tools and additional plumbing components are available.
3.2 Installation Steps
- Turn off the boiler and allow it to cool. Isolate the system and drain it if necessary.
- Identify the appropriate connection points on your boiler for the safety group.
- Connect the Caleffi 302 631 Boiler Group to the system using appropriate fittings. Ensure all connections are tight and leak-free.
- Position the quick bleed vent at the highest point possible to facilitate air removal.
- Ensure the discharge pipe from the safety valve is correctly routed to a safe drainage point, preventing scalding or property damage.
- Refill the system and carefully check for leaks.
- Bleed any remaining air from the system using the quick bleed vent or other system bleed points.
4. Operating Instructions
Once installed, the Caleffi 302 631 Boiler Group operates largely automatically to maintain system safety and efficiency.
4.1 Monitoring System Pressure
- Regularly observe the pressure gauge. The optimal operating pressure range is typically indicated by a green zone on the gauge face.
- If the pressure consistently falls below the recommended range, the system may need to be refilled.
- If the pressure consistently exceeds the recommended range, the safety valve should activate. If it does not, or if pressure continues to rise, immediately shut down the boiler and consult a qualified technician.
4.2 Automatic Air Vent Function
The quick bleed vent automatically releases air that accumulates in the system. No manual intervention is typically required during normal operation. Ensure the vent cap is not overtightened, allowing air to escape.
5. Maintenance
Regular maintenance ensures the longevity and reliable operation of your Caleffi Boiler Group.
5.1 Safety Valve Check
- It is recommended to manually test the safety valve at least once a year.
- To test, briefly turn the red cap or lever to allow a small amount of water to discharge. This helps prevent the valve from seizing.
- Ensure the discharge pipe is clear and safely routed before performing this test.
- If the valve does not operate freely or leaks after testing, it must be replaced.
5.2 Quick Bleed Vent Inspection
- Periodically check the quick bleed vent for any signs of leakage or blockage.
- Ensure the vent cap is slightly loosened (as per manufacturer's instructions for automatic vents) to allow air release.
5.3 General Cleaning
Keep the exterior of the boiler group clean. Avoid using abrasive cleaners that could damage the brass or plastic components.
6. Troubleshooting
This section addresses common issues you might encounter with the Caleffi 302 631 Boiler Group.
| Problem | Possible Cause | Solution |
|---|---|---|
| Pressure gauge reading is too low. | Insufficient water in the system. | Refill the heating system to the recommended pressure. Check for leaks. |
| Pressure gauge reading is too high. | System overfilled, expansion vessel fault, or safety valve malfunction. | Check expansion vessel. If pressure continues to rise and safety valve does not activate, shut down boiler and contact a technician. |
| Water dripping from safety valve. | Normal operation (minor discharge due to pressure fluctuations), or valve seat contamination/failure. | If minor, it may be normal. If continuous or excessive, test valve. If issue persists, valve may need cleaning or replacement. |
| Water dripping from quick bleed vent. | Normal operation (expelling air/water), or vent malfunction. | Ensure vent cap is not overtightened. If continuous leakage, the vent may need replacement. |
| No air being released from vent. | Vent cap overtightened or vent blocked. | Loosen vent cap slightly. Clean vent if necessary. Replace if still not functioning. |
For issues not listed here or if solutions do not resolve the problem, contact a qualified heating technician.
7. Specifications
Detailed technical specifications for the Caleffi 302 631 Boiler Group:
| Specification | Detail |
|---|---|
| Model Number | 302 631 |
| Manufacturer | Caleffi S.p.A. |
| Part Number | 9001802 |
| Maximum Boiler Power | Up to 50 kW |
| Material | Brass, Plastic |
| Item Weight | 2.2 pounds (approx. 1 kg) |
| Product Dimensions (L x W x H) | 9.84 x 3.15 x 7.87 inches (approx. 25 x 8 x 20 cm) |
| Included Components | Boiler group (pre-assembled with pressure gauge, safety valve, quick bleed vent) |
| Certification | Kesselsicherheitsgruppe (Boiler Safety Group) |
8. Warranty Information
For detailed warranty terms and conditions, please refer to the official warranty documentation provided with your purchase or visit the Caleffi S.p.A. official website. Warranty coverage typically applies to manufacturing defects and is subject to proper installation and use as outlined in this manual.
9. Support
If you require technical assistance, have questions regarding installation, operation, or maintenance, or need to report a product issue, please contact Caleffi S.p.A. customer support or your authorized Caleffi dealer.
Manufacturer: Caleffi S.p.A.
For contact information, please visit the official Caleffi website: www.caleffi.com





