1. Introduction and Overview
The GEYA GPS8 Series Automatic Transfer Switch (ATS) is a high-performance dual power controller designed to guarantee power continuity for critical loads. It combines rapid switching capabilities with advanced digital protection, monitoring voltage and current in real-time. This device automatically transfers the load to a backup power source (such as a generator, inverter, or secondary grid) when the main power fails or becomes unstable. The GPS8 ensures your equipment remains safe and operational in residential, commercial, and industrial applications.
The series includes:
- GPS8-17: A dual power supply automatic transfer switch, typically for 63A AC220V (L1-N1, L2-N2) configurations.
- GPS8-18: A three-way power supply automatic transfer switch, typically for 63A or 80A AC220V (L1, L2, L3-N) configurations.
For a detailed user manual in PDF format, please refer to the User Manual (PDF).
2. Safety Information
WARNING: The products must be installed by qualified electricians. All electrical connections shall comply with appropriate safety standards.
- This product does not have isolation function. Always disconnect the superior MCB (Miniature Circuit Breaker) during maintenance to prevent electrical shock.
- Ensure all wiring is correctly sized for the rated current and voltage.
- Do not operate the device with wet hands or in damp conditions.
- Verify all connections are secure before applying power.
3. Product Features
- Integrated Protection: Combines 2/3-way automatic power transfer with over/under voltage and overcurrent protection, enhancing load safety and reducing installation costs.
- Real-time Monitoring: Digital tube displays voltage and current values for easy observation and maintenance.
- Flexible Settings: Configurable power-on delay, protection delay, transfer delay, and adjustable power priority (no rewiring needed).
- Convenient Control: Panel button with 0.5s long-press anti-misoperation function to turn on/off load power (L line only).
- True RMS Monitoring: Accurate voltage and current monitoring.
- DIN Rail Mounting: Easy installation on standard 35mm DIN rails.
- Flame Retardant Shell: Constructed from PA66 material for enhanced safety.

4. Technical Specifications
| Parameter | Specification (GPS8-18) |
|---|---|
| Function | Automatic transfer switch |
| Rated supply voltage | AC220V (L1, L2, L3-N) |
| Rated supply frequency | 45-65Hz |
| Operation voltage range | 80V-400V (L1, L2, L3-N) |
| Rated operational current | 63A, 80A (AC1) |
| Burden | AC max. 3VA |
| Over voltage operation value | OFF, 230V-300V |
| Under voltage operation value | 140V-210V, OFF |
| Over/under voltage action delay | 0.1s-10s |
| Over current operation value | 1A-63A, 80A |
| Over current action delay | 2s-600s |
| Power-up delay | 2-600s |
| Reset time | 2-900s |
| Switching time | 0-900s |
| Measurement error | ≤ 1% |
| Electrical life (AC1) | 1×104 |
| Mechanical life | 1×106 |
| Operating temperature | -20°C - +60°C |
| Storage temperature | -35°C - +75°C |
| Mounting/DIN rail | Din rail EN/IEC 60715 |
| Protection degree | IP40 for front panel/IP20 terminals |
| Operating position | Any |
| Overvoltage category | III |
| Pollution degree | 2 |
| Dimensions | 82 x 72 x 68 mm |
| Weight | 320g |

5. Installation
5.1 Mounting
The GEYA GPS8 Series ATS is designed for 35mm DIN rail mounting. It can be directly installed in household lighting distribution boxes.


5.2 Wiring Diagrams
IMPORTANT NOTE: For both GPS8-17 and GPS8-18 models, the Neutral (N) poles are straight through to the load end N poles. They are NOT cut off or switched by the device. This means the neutral connection is continuous and not interrupted by the ATS. Ensure your system design accounts for this characteristic.

Scenario 1: Power conversion between photovoltaic inverter and mains power.
Scenario 2: Power conversion between mains and backup power sources such as generators.

Scenario 1: Power conversion between photovoltaic inverter, mains power, and generator.
Scenario 2: A power consumption scenario in which different phases are used as single-phase power supplies in a three-phase power system (equivalent to phase selector function).

6. Operation
6.1 Panel Diagram and Controls

- Power Button (circle with line): Used to manually turn on or off the load.
- 'M' Button: Press and hold for 3 seconds to enter the setting mode. After modifying a setting, press and hold for 3 seconds to save.
- Up Arrow Button: Used to increase the value when setting parameters.
- Down Arrow Button: Used to reduce the value when setting parameters.
- LED Indicators (L1, L2, L3): Indicate the currently selected phase.
- FLT LED: Fault indicator.
6.2 Parameter Setting
To enter parameter settings, press and hold the 'M' key for 3 seconds. Use the Up/Down arrow keys to adjust values. Press and hold 'M' again for 3 seconds to save and exit. If no key is operated for 60 seconds, the device will automatically exit the setting mode.

Factory Settings:
| Parameter | Range | Step value | Factory settings |
|---|---|---|---|
| Over voltage value | OFF, 230V-300V | 1V | 275V |
| Over voltage recovery value | 225V-295V | 1V | 265V |
| Under voltage value | 140V-210V, OFF | 1V | 175V |
| Under voltage recovery value | 145V-215V | 1V | 180V |
| Voltage fault action time | 0.1s-10s | 0.1s | 0.5s |
| Over current value | OFF, 1A-63A, 80A | 0.1A | 60A, 80A |
| Over current action delay | 2s-600s | 1s | 5s |
| Power on delay time | 2s-600s | 1s | 5s |
| Reset time | 2s-900s | 1s | 10s |
| Switching time | 0s-900s | 0s | |
| Fault reset | ON-OFF | ON | |
| Priority phase | L1-L2-L3-AUTO | L1 |
6.3 Manual Control
Under normal operation, the load can be switched on or off manually by pressing the power key for 0.5 seconds.
6.4 Power-on and Reset Delay
During power-on and fault reset, the product will count down and display according to the set delay time. It will enter the running state when the countdown ends.

6.5 Usage Demonstration Video
Watch this video for a practical demonstration of the GPS8-18 63A model's usage, including wiring and automatic switching.
7. Functional Diagrams
The priority phase of the product can be set. For example, if the priority phase is set to L1, the product will automatically select L1 as the input first. In any case, if only L1 is normal, it will automatically switch to L1. If the priority phase is set to AUTO, the product will automatically select the voltage normal phase as the input.
You can understand the working logic of the product through the following functional diagrams:

Key to Diagrams:
- Tp: Power-up delay (2-600s)
- Tr: Reset delay time (2-900s)
- Tu: Over/under voltage fault action time (0.1-10s)
- Tc: Overcurrent fault action time (2-600s)
- Ts: Switching time (0-900s)
Note: When the switching time is set to 0, the actual switching time is about 0.2 seconds.
8. Applications
The GEYA GPS8 Series ATS is suitable for a wide range of applications requiring reliable power transfer and protection:
- Hospitals
- Commercial Buildings
- Data Centers
- Industrial Facilities
- Telecom Hubs

9. Troubleshooting
- No Power/Display: Check input power connections and ensure circuit breakers are closed. Verify the rated supply voltage is within the specified range.
- Load Not Switching: Ensure all input power sources are active and stable. Check parameter settings for priority phase and switching delays. If the fault indicator (FLT) is on, refer to the functional diagrams for fault conditions.
- Overvoltage/Undervoltage/Overcurrent Trip: The device is functioning as designed to protect your load. Check the incoming power quality and load current. Adjust protection settings if necessary, but always ensure they are within safe operating limits for your equipment.
- Slow Switching: Some users have noted that switching between lines can be perceived as slow, potentially causing brief reboots for sensitive loads. Review the 'Switching time' parameter setting (Ts) and adjust if possible, or consider the nature of your connected loads.
- N-Pole Continuity: Remember that the neutral line is always straight through and not switched. If your application requires switched neutral, this device may not be suitable.
10. User Tips
- Verify Neutral Connection: As highlighted in the manual and user feedback, the neutral (N) line is common and not switched by the ATS. Plan your wiring accordingly, especially if you have specific neutral isolation requirements.
- Parameter Adjustment: Take advantage of the adjustable parameters for over/under voltage, overcurrent, and various delays to fine-tune the ATS to your specific power environment and load requirements.
- Professional Installation: Always have the device installed by a qualified electrician to ensure safety and compliance with local electrical codes.
- Monitor Display: Regularly check the digital display for real-time voltage and current values, and the LED indicators for active power source and fault status.
11. Maintenance
- Regular Inspection: Periodically inspect the device for any signs of physical damage, loose connections, or overheating.
- Cleanliness: Keep the device clean and free from dust and debris to ensure proper ventilation and operation.
- Firmware Updates: Check the manufacturer's website (www.geya.net) for any available firmware updates or updated instruction manuals.
- Environmental Conditions: Ensure the operating environment remains within the specified temperature and humidity ranges.
12. Warranty and Support
For warranty information, technical support, or service inquiries, please contact GEYA Electrical Co., Ltd. directly:
- Address: Wenzhou Bridge Industrial Zone, Beibaixiang Town, Yueqing, Zhejiang, China 325603
- Mobile: 0086-13567770207
- E-mail: sale@cngeya.com
- Website: www.geya.net