GEYA GPS8-17

Contents

GEYA GPS8-17 Automatic Transfer Switch Instruction Manual

Model: GPS8-17

1. Introduction

The GEYA GPS8-17 Automatic Transfer Switch (ATS) is a high-performance dual power controller designed to guarantee power continuity for critical loads. It combines rapid switching capabilities with advanced digital protection, monitoring voltage and current in real-time. The device automatically transfers the load to a backup power source (such as a generator, inverter, or secondary grid) when the main power fails or becomes unstable. Ideal for residential, commercial, and industrial applications, the GPS8-17 ensures your equipment remains safe and operational.

This model is specifically designed for Single Phase systems (L1-N1 vs L2-N2), making it ideal for switching between two independent single-phase sources.

Key Features:

  • Voltage/Current Monitoring and Protection: Real-time monitoring with adjustable overvoltage (OV), undervoltage (UV), and overcurrent (OC) protection.
  • Smart Auto-Manual Dual Mode: Instantly detects grid failures (L1) and switches to backup power (L2) within seconds using advanced microcontroller technology. Manual control allows overriding automation to select L1/L2 power sources via the intuitive interface.
  • Adjustable Parameters: Fine-tune protection thresholds and delays for specialized needs.
  • Priority Phase Setting: Configure which power source takes priority.
  • Digital Display: Clearly visible LED display for voltage and fault status.
  • DIN Rail Mounting: Designed for easy and secure installation.
  • Flame Retardant Shell: Constructed with flame retardant PA66 material for enhanced safety.

2. Safety Information

WARNING: The products must be installed by qualified electricians. All electrical connections shall comply with appropriate safety standards.

CRITICAL SAFETY ALERT: This product does not have an isolation function. Please disconnect the superior Main Circuit Breaker (MCB) during any maintenance or installation work to prevent electrical shock.

IMPORTANT WIRING CONSIDERATION: Unlike typical Automatic Transfer Switches, the N1 and N2 (neutral lines) of this product are connected internally. This device is primarily designed for phase selection within a single power source system or between two sources sharing a common neutral. It is NOT designed for switching between two truly independent power sources with separate neutral lines. Connecting independent power sources with separate neutrals to this device can create dangerous uncontrolled equalizing currents, leading to overheating, cable damage, and a significant fire hazard. Ensure your electrical setup is compatible or consult a qualified electrician before installation.

3. Product Overview

Panel Diagram and Controls

Panel Diagram of GEYA GPS8-17 Automatic Transfer Switch showing display, indicators, and buttons.
Figure 1: GEYA GPS8-17 ATS Panel Diagram

The panel features a digital display for monitoring voltages (L1, L2) and load current, along with indicator lights and control buttons:

  • L1 Display: Shows main power supply voltage.
  • L2 Display: Shows backup power supply voltage.
  • LOAD Display: Shows load current.
  • L1 Indicator: Lights up when L1 is active.
  • L2 Indicator: Lights up when L2 is active.
  • FLT Indicator: Fault indicator.
  • ① (Power Button): Used to manually turn on or off the load.
  • M (Setting Key): Press and hold for 3 seconds to enter the setting mode. After modifying settings, press and hold for 3 seconds to save.
  • ▲ (Up Arrow): Used to increase values when setting parameters.
  • ▼ (Down Arrow): Used to reduce values when setting parameters.

4. Installation

4.1 DIN Rail Mounting

The GEYA GPS8-17 is designed for 35MM DIN rail mounting, featuring securing clips and tunnel-type wiring ports for secure wiring.

Simple installation steps for DIN rail mounting: back panel display, press latch, insert into DIN rail, release latch.
Figure 2: DIN Rail Installation Steps
  1. Ensure the back panel display is visible.
  2. Press the latch on the device.
  3. Insert the device into the DIN rail.
  4. Release the latch to secure the device.

4.2 Wiring Diagrams

Connect the power sources and load to the appropriate terminals as shown in the diagrams below. Always ensure power is disconnected before wiring.

Standard wiring diagram for GEYA GPS8-17 ATS with main power, backup power, and load connections.
Figure 3: Standard Wiring Diagram

NOTE:

  • This product does not have an isolation function. Please disconnect the superior MCB during maintenance!!!
  • Unlike typical ATS, the N1 and N2 of this product are connected. Please note this feature as it may not be applicable in some scenarios.
Wiring diagram for GEYA GPS8-17 ATS with PV/DC-AC Converter and battery as a backup power source.
Figure 4: Wiring Diagram with PV/DC-AC Converter

NOTE: When the priority phase is set to L1, L1-N1 is the main power supply.

5. Operation

5.1 Automatic Switching Demonstration

Video 1: Demonstration of GEYA GPS8-17 ATS operation, showing automatic switching between L1 (photovoltaic power) and L2 (mains power) and manual control.

The video demonstrates the automatic transfer switch in action:

  1. Connect photovoltaic power to the upper N1 L1 port and mains power to the N2 L2 port. Connect the load to the lower end.
  2. Powering the L1 supply. After a 5-second delay, the load connects to L1. The L1 indicator light is on, and L1 voltage is displayed.
  3. Supply L2 power. L2 voltage is displayed.
  4. Disconnect L1. The product immediately switches to L2 power supply. The L2 indicator light is constantly on.
  5. Restore L1. The L1 light starts flashing. After a delay of a few seconds, it switches back to L1 power supply. The L1 light is constantly on.
  6. Default L1 as the main power supply with priority given to the main power supply.
  7. Long press the power button to control the circuit on/off.
  8. Set L2 as the main power source. Disconnect L2. The product automatically switches to L1 power supply.
  9. Restore L2. The L2 light starts flashing. Delayed switching back to L2 power supply.
  10. When set to automatic transmission, there is no distinction between primary and backup at this time.

5.2 Manual Control

Under normal operation, the load can be switched on or off manually by pressing the power button (①) for 0.5 seconds.

5.3 Power-on and Reset Delay

During power-on and fault reset, the product will count down and display according to the set delay time. It will enter the running state when the countdown ends.

6. Parameter Setting

To enter the parameter setting mode, press and hold the M key for 3 seconds. Use the ▲ and ▼ buttons to adjust values. Press and hold M for 3 seconds again to save the settings and exit. If no key is operated for 60 seconds, it will exit automatically without saving.

Flow chart illustrating the parameter setting process for GEYA GPS8-17 ATS, including overvoltage, undervoltage, overcurrent, and various delay settings.
Figure 5: Parameter Setting Flow Chart

Adjustable Parameters:

  • Overvoltage Setting (oU): Range OFF, 230V-300V. Default: 275V.
  • Overvoltage Recovery Value (oUr): Range 225V-295V. Default: 265V.
  • Undervoltage Setting (UU): Range 140V-210V, OFF. Default: 175V.
  • Undervoltage Recovery Value (UUr): Range 145V-215V. Default: 180V.
  • Over/Under Voltage Fault Action Time (Ut): Range 0.1s-10s. Default: 0.5s.
  • Overcurrent Setting (oC): Range OFF, 1A-63A, 80A. Default: 60A or 80A depending on model.
  • Overcurrent Action Delay (ocE): Range 2s-600s. Default: 5s.
  • Power-up Delay (tP): Range 2s-600s. Default: 5s.
  • Reset Time Setting (tr): Range 2s-900s. Default: 10s.
  • Switching Time between Primary and Backup Power (tS): Range 0s-900s. Default: 0s.
  • Fault Reset (rSt): ON-OFF. Default: ON.
  • Priority Phase (PrP): L1-L2-AUTO. Default: L1.

NOTE: When the switching time is set to 0, the actual switching time is approximately 0.2 seconds.

7. Functions Diagram (Working Logic)

The following diagrams illustrate the working logic of the ATS under various conditions, including fault reset and priority phase settings. These diagrams show the behavior of the ATS in response to changes in voltage (U>, U<), recovery, and delays (Tp, Tr, Tu, Tc, Ts).

Functional diagram showing ATS behavior with Fault reset ON and Priority phase L1.
Figure 6: Fault reset: ON, Priority phase: L1
Functional diagram showing ATS behavior with Fault reset ON and Priority phase AUTO.
Figure 7: Fault reset: ON, Priority phase: AUTO
Functional diagram showing ATS behavior with Fault reset OFF and Priority phase L1.
Figure 8: Fault reset: OFF, Priority phase: L1
Functional diagram showing ATS behavior during an overcurrent fault.
Figure 9: Overcurrent Fault

Legend for Diagrams:

  • Tp: Power-up delay (2-600s)
  • Tr: Reset delay time (2-900s)
  • Tu: Over/under voltage fault action time (0.1-10s)
  • Tc: Overcurrent fault action time (2-600s)
  • Ts: Switching time (0-900s)

8. Maintenance

Always disconnect the superior Main Circuit Breaker (MCB) before performing any maintenance on the GEYA GPS8-17 ATS to prevent electrical shock.

Disposal of Electrical Waste

All electrical waste should be disposed of in compliance with current WEEE regulations.

9. Troubleshooting

If the ATS is not functioning as expected, consider the following:

  • Check FLT Indicator: If the fault indicator (FLT) is on, refer to the parameter settings for fault reset (rSt) and check for over/undervoltage or overcurrent conditions.
  • Verify Power Sources: Ensure both main (L1) and backup (L2) power sources are stable and within the set voltage and current limits.
  • Review Parameter Settings: Incorrect parameter settings (e.g., over/undervoltage thresholds, delays, priority phase) can affect operation. Re-enter the setting mode and verify all values.
  • Wiring Connections: Double-check all wiring connections for tightness and correctness according to the wiring diagrams.
  • Switching Delays: Be aware that there are inherent delays (e.g., power-up delay, reset time, switching time) that might cause temporary power interruptions during transitions.

10. Technical Specifications

Dimensions diagram of the GEYA GPS8-17 Automatic Transfer Switch, showing width, height, and depth in millimeters.
Figure 10: Dimensions (mm)
ParameterSpecification
FunctionAutomatic transfer switch
Rated Supply VoltageAC 220V / 110V (L1-N1, L2-N2)
Rated Supply Frequency45Hz ~ 65Hz
Operation Voltage Range80V ~ 400V (L1-N1, L2-N2)
Rated Operational Current63A, 80A (AC1)
BurdenAC max. 3VA
Over Voltage SettingOFF, 230V-300V
Over Voltage Recovery Value225V-295V
Under Voltage Setting140V-210V, OFF
Under Voltage Recovery Value145V-215V
Voltage Trip Delay0.1s ~ 10s
Over Current Setting1A ~ 63A (or 80A)
Over Current Action Delay2s ~ 600s
Power-up Delay2s ~ 600s
Reset Time2s ~ 900s
Switching Time0s ~ 900s
Measurement Error<1%
Electrical Life (AC1)1 x 104
Mechanical Life1 x 106
Operating Temperature-20℃ ~ +60℃
Storage Temperature-35℃ ~ +75℃
Mounting/DIN RailDIN rail EN/IEC 60715
Protection DegreeIP40 for front panel/IP20 terminals
Operating PositionAny
Overvoltage CategoryIII
Pollution Degree2
Dimensions82 x 72 x 68mm
Weight280g

11. User Tips

  • Compact Design: The GPS8-17 is very compact and suitable for installation in electrical panels without significant space issues.
  • Fast Switching: The device generally switches quickly between power sources. For sensitive equipment like internet routers, consider adding a small 12V mini UPS to bridge the brief ~0.2-second power interruption that occurs during source switching, even when the switching time is set to 0.
  • Current Reading Discrepancy: Be aware that there might be minor discrepancies between the current readings on the ATS display and those from external meters. This is often within acceptable tolerances but worth noting for precise monitoring.
  • Neutral Connection: As highlighted in the safety section, this device has a common neutral. It is crucial to understand that it is designed for phase selection within a single power source system or between two sources sharing a common neutral. It is NOT suitable for switching between two truly independent power sources with separate neutral lines, as this can create hazardous conditions.
  • Inverter Compatibility: Some users have reported that this ATS works well with certain inverters (e.g., Victron Phenix) where other ATS models might cause issues. However, it may not work properly with all types of generators and charging stations (e.g., Ecoflow, Bluetti) if they do not share a common ground or neutral.

12. Warranty and Support

For warranty information, technical support, or inquiries, please contact GEYA Electrical Co., Ltd. using the details below:

  • Address: Wenzhou Bridge Industrial Zone, Beibaixiang Town, Yueqing, Zhejiang, China 325603
  • Mobile: 0086-13567770207
  • E-mail: sale@cngeya.com
  • Website: www.geya.net

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.