PowMr POW-SunSmart 6.5KP

Contents

PowMr POW-SunSmart 6.5KP Hybrid Solar Inverter User Manual

Model: POW-SunSmart 6.5KP | Brand: PowMr

1. Important Safety Instructions

Please keep this user manual properly for future reference!

⚠ Warning: It is essential to read, understand, and adhere to all safety instructions provided in this document. Failure to comply with safety regulations may result in property damage or personal injury.

Basic Guidelines

  1. Before using the equipment, carefully review all relevant sections of the device, battery, and instruction manual for all guidance and warning signs.
  2. Caution: To reduce the risk of injury, if you choose to use lead-acid batteries, please charge only deep cycle lead-acid batteries. Other types of lead-acid batteries may rupture, causing personal injury.
  3. This product does not contain user-serviceable parts. Do not disassemble the equipment. When maintenance or cleaning is required, take it to a qualified service center. Improper reassembly may pose risks of short-circuiting and fire. If any panel displays a malfunction, do not remove the front panel or operate the product. All operating procedures must be performed by trained professionals.
  4. To reduce the risk of electric shock, disconnect all wiring before performing any maintenance and cleaning. Switching off the main unit alone does not eliminate the risk of electric shock.
  5. Caution: Only qualified personnel should assemble the equipment with the battery.
  6. Charging frozen batteries is prohibited.
  7. Exercise extreme caution when using metal tools or placing them around the battery. Dropping tools can generate sparks or cause unpredictable risks such as short-circuiting the battery or other electronic components, potentially leading to explosions.
  8. When disconnecting AC or DC terminals, strictly follow the installation steps as outlined in the instruction manual's installation section.
  9. Before using this product, read the provided instructions to familiarize yourself with safety features and operating instructions. This product is designed and tested according to international standards. The equipment must be used exclusively for its intended purpose.

2. Product Overview

The PowMr POW-SunSmart 6.5KP is a new type of solar storage inverter that integrates PV storage, mains charge, and energy storage, outputting sinusoidal AC. Equipped with DSP control and advanced control algorithms, it offers high response speed and good reliability, suitable for various residential or commercial applications.

PowMr 6.5KW Single Phase & Split Phase Mode Solar Inverter with key specifications
Figure 2.1: PowMr 6.5KW Single Phase & Split Phase Mode Solar Inverter. Key specifications include 6.5KW AC Output Power, 140A Max AC Charging Current, 550Vdc Max PV Array Open Circuit Voltage, 150V Starting Voltage, and 75W No-load Power Consumption.

2.1 Features

  • Supports connection of various types of energy storage batteries such as lead-acid and lithium-ion batteries.
  • Features dual activation function for lithium-ion battery sleep; access to mains/PV power can activate the lithium-ion battery.
  • Supports split-phase/single-phase pure sine wave output.
  • Allows adjusting the voltage of each phase within the range of 100 Vac, 105 Vac, 110 Vac, 120 Vac, and 127Vac.
  • Supports two-channel PV input with simultaneous two-channel Maximum Power Point Tracking (MPPT) for charging/carrying capacity.
  • Two-channel MPPT with an efficiency of up to 99.9% and a maximum single-channel current of 18 A, perfectly fitting high-power modules.
  • Provides four charge modes: only PV, mains first, PV first, and mains + PV.
  • Includes a timed charge and discharge function, allowing users to set charge and discharge times based on time-of-use prices to save electricity costs.
  • Energy-saving mode reduces no-load energy losses.
  • Offers two output modes: mains bypass output and inverter output, ensuring uninterrupted power supply.
  • LCD display shows dynamic flowchart, system data, and operating status in real-time.
  • Provides 360° protection, including short circuit, overcurrent, overvoltage, undervoltage, and overload protection.
  • Supports CAN, USB, RS485 communication.

2.2 System Basic Architecture

The following illustration depicts the basic application of the inverter/charger. A complete system consists of the following parts:

  1. PV module: Converts solar energy into DC to charge batteries or into AC to supply power to loads.
  2. Mains or generator: Connected to AC input, it can charge batteries while supplying power to loads. When the battery and PV module supply power to the load, the system can generally operate without mains or generator.
  3. Battery: Ensures normal power supply for the system load when there is insufficient PV power and no mains.
  4. Household load: Can connect various household and office loads, including refrigerators, lighting fixtures, TVs, fans, air conditioners, and other AC loads.
  5. Inverter: The energy conversion device of the entire system.

Additional system architectures can be consulted with system integrators based on your requirements. This inverter can provide power to various electrical appliances in residential or office environments, including lamps, fans, refrigerators, air conditioners, and other motor-type appliances.

Diagram showing the basic system architecture of the hybrid solar inverter connecting to PV panel, generator, utility, external battery packs, and home appliances.
Figure 2.2: Basic System Architecture. This diagram illustrates how the inverter connects to PV panels, a generator, utility grid, external battery packs, and various home appliances.

2.3 Product Appearance

The inverter features a unique glass top cover design with a 6.25-inch display and touchscreen buttons.

Detailed view of the PowMr POW-SunSmart 6.5KP inverter, showing front, side, and bottom panels with labeled ports and controls.
Figure 2.3: Product Appearance. This image provides a detailed view of the inverter's front, side, and bottom panels, highlighting the LCD screen, physical buttons, LED indicators, ON/OFF rocker switch, PV input, battery positive/negative ports, dry contact, RS485/CAN port, WIFI port, USB-B port, CT, parallel communication port, AC input/output, generator port, and grounding screw.
Table 2.1: Product Components and Descriptions
No.ComponentNo.ComponentNo.Component
1LCD screen7Battery negative port13Grounding screw
2Physical button8Dry contact14AC input (L1+L2+N)
3LED indicator9RS485/CAN port15AC output (L1+L2+N)
4ON/OFF rocker switch10WIFI port16Generator port (L1+L2+N)
5PV input11USB-B port17AC input circuit breaker
6Battery positive port12CT18Parallel communication port

3. Installation

3.1 Unboxing and Inspection

Before assembly, please inspect the unit to ensure that the items in the packaging are undamaged. Inside the package, you will find the following items:

  • Inverter device
  • Instruction manual
  • Expansion screws
  • Battery fuses
Image showing the contents of the PowMr inverter package, including the inverter unit, user manual, communication cables, mounting hardware, and battery terminals.
Figure 3.1: Package Contents. The image displays the inverter, user manual, communication cables, mounting screws, and battery terminals.

3.2 Installation Tools

Before installation, please prepare the following tools:

Table 3.1: Required Installation Tools
CategoryTools
General ToolsMultimeter, Protective gloves, Insulated safety shoes
Protective clothing, Safety goggles, Antistatic wrist strap
Electric screwdriver, Socket wrench, Wire stripper
Phillips screwdriver, Electric drill, Hammer

3.3 Installation Location

Before selecting an installation location, consider the following points:

  • Install on a solid surface.
  • Position the inverter at eye level for easy viewing of the LCD display.
  • Maintain approximately 20cm spacing on each side and approximately 50cm spacing above and below the device for proper air circulation and heat dissipation.
  • Ensure ambient temperature remains between -10°C to 55°C for optimal operation.
  • It is recommended to install the device vertically against the wall.
  • Ensure other objects, as shown in the diagram, maintain sufficient distance from the inverter surface to ensure adequate heat dissipation and provide enough space for wiring removal.

⚠ Suitable for installation on concrete or other non-combustible walls.

Diagram illustrating proper installation spacing for the inverter on a wall, showing 50cm clearance above and below, and 20cm on the sides.
Figure 3.2: Installation Spacing. This diagram shows the recommended clearances for inverter installation: 50cm above and below, and 20cm on each side, to ensure proper ventilation and access.

DANGER:

  • Do not install the inverter near highly flammable materials.
  • Do not install the inverter in potentially explosive areas.
  • Do not install the inverter and lead-acid battery in enclosed spaces.
  • Do not install the inverter on combustible building materials.

CAUTION:

  • Do not install the inverter in direct sunlight.
  • Do not install or use the inverter in damp environments.

3.4 Removal of Terminal Cover and Insect-Proof Net

Diagram showing how to remove the terminal cover and insect-proof net from the inverter.
Figure 3.3: Terminal Cover and Insect-Proof Net Removal. This diagram illustrates the process of removing the terminal cover and the insect-proof net for maintenance.

NOTICE: When using the inverter in areas with poor air quality, the dustproof net is easily blocked by air particles. Please regularly remove and clean it to avoid affecting the air flow rate inside the inverter; otherwise it may cause inverter overheating (19/20 fault), and affect power supply and the service life of the inverter.

3.5 Inverter Installation

Drill 4 installation holes of the specified sizes on the wall with an electric drill, insert 2 expansion screws above, and fix the inverter with 2 M5 screws below.

Diagram showing the drilling template and steps for mounting the inverter on a wall.
Figure 3.4: Inverter Mounting Diagram. This diagram provides the dimensions and steps for drilling holes and securely mounting the inverter to the wall.

4. Wiring

4.1 Wiring Mode (depends on the output mode)

4.1.1 Split-phase mode (default)

Wiring diagram for split-phase output mode, showing L1, L2, and N connections with 120V and 240V outputs.
Figure 4.1: Split-phase Wiring Diagram. This diagram illustrates the connections for L1, L2, and Neutral, providing 120V and 240V outputs.
Table 4.1: Split-phase Mode Specifications
ItemDescription
Applicable modelPOW-SunSmart 6.5KP
AC output phase voltage (L-N)100 VAC-120 VAC, 120 VAC (default)
AC output line voltage (L-L)200 VAC-240 VAC, 240 VAC (default)

4.1.2 Single-phase mode

Wiring diagram for single-phase output mode, showing L and N connections with 120V output.
Figure 4.2: Single-phase Wiring Diagram. This diagram illustrates the connections for Live (L) and Neutral (N), providing 120V output.
Table 4.2: Single-phase Mode Specifications
ItemDescription
Applicable modelPOW-SunSmart 6.5KP
AC output phase voltage (L-N)100 VAC-120 VAC, 120 VAC (default)

4.2 Cable and Circuit Breaker Model

4.2.1 PV INPUT

Table 4.3: PV Input Cable and Breaker Specifications
Inverter ModelCable SizeMax. Input CurrentCircuit Breaker Model
POW-SunSmart 6.5KP4mm²/12AWG18A/18A2P-25A

4.2.2 Grid input

Table 4.4: Grid Input Cable and Breaker Specifications
Inverter ModelOutput ModeDiagramMax. CurrentCable SizeCircuit Breaker Model
POW-SunSmart 6.5KPSplit-phase modeL1 | L2 | N40A (L1/L2/N)10mm²/8AWG (L1\L2\N)3P-40A
Single-phase modeL | L2 | N40A(L1/L2) 80A(N)10mm²/8AWG(L1/L2) 20mm²/4AWG(N)2P-80A

4.2.3 Generator input

Table 4.5: Generator Input Cable and Breaker Specifications
Inverter ModelOutput ModeDiagramMax. CurrentCable SizeCircuit Breaker Model
POW-SunSmart 6.5KPSplit-phase modeL1 | L2 | N40A (L1/L2/N)10mm²/8AWG (L1\L2\N)3P-40A
Single-phase modeL | L2 | N40A(L1/L2) 80A(N)10mm²/8AWG(L1/L2) 16mm²/4AWG(N)2P-80A

4.2.4 Battery

Table 4.6: Battery Cable and Breaker Specifications
Inverter ModelCable SizeMax. CurrentCircuit Breaker Model
POW-SunSmart 6.5KP35mm²/2AWG150A2P-160A

4.2.5 AC output

Table 4.7: AC Output Cable and Breaker Specifications
Inverter ModelOutput ModeDiagramMax. CurrentCable SizeCircuit Breaker Model
POW-SunSmart 6.5KPSplit-phase modeL1 | L2 | N40A (L1/L2/N)10mm²/8AWG (L1\L2\N)3P-40A
Single-phase modeL | L2 | N40A(L1/L2) 80A(N)10mm²/8AWG(L1/L2) 16mm²/6AWG(N)2P-80A

NOTICE: The cable size is for reference only. If the distance between the PV array and the inverter or between the inverter and the battery is long, using thicker cables will reduce voltage drop and improve system performance.

PV input, AC input, and AC output terminals

  1. Use a wire stripper to strip off 6 mm-8 mm long insulation layer of the cable.
  2. Fix a sleeve at the end of the cable. (the sleeve is to be prepared by the user)

Battery terminal

  1. Use a wire stripper to strip off 6 mm-8 mm long insulation layer of the cable.
  2. Fix a ring terminal (attached) at the end of the cable.

4.3 GRID, LOAD and Gen wiring

Connect the live wire, neutral wire, and ground wire according to the cable position and sequence shown in the following figure.

Wiring diagram for GRID, LOAD, and Generator connections on the inverter's terminal block.
Figure 4.3: GRID, LOAD, and Gen Wiring. This diagram shows the correct connection points for live, neutral, and ground wires for grid, load, and generator inputs/outputs.

DANGER:

  • Before connecting AC input and output, be sure to disconnect the circuit breaker to avoid the risk of electric shock. Do not conduct live operation.
  • Please check whether the cables used are sufficient to meet the requirements. Cables that are too thin or of poor quality may pose serious safety hazards.

4.4 Battery wiring

Connect the positive and negative cables of the battery according to the cable position and sequence shown in the following figure.

Wiring diagram for battery connections on the inverter, showing positive and negative terminals.
Figure 4.4: Battery Wiring. This diagram illustrates the correct connection of positive and negative battery cables to the inverter.

DANGER:

  • Before connecting the battery, be sure to disconnect the circuit breaker to avoid the risk of electric shock. Do not conduct live operation.
  • Please check the positive and negative terminals of the battery for correct connection and no reverse connection; otherwise it may damage the inverter.
  • Please check whether the cables used are sufficient to meet the requirements. Cables that are too thin or of poor quality may pose serious safety hazards.

4.5 PV wiring

Connect the positive and negative terminals of the two-channel PV modules according to the cable position and sequence shown in the following figure.

Wiring diagram for PV module connections on the inverter, showing positive and negative terminals for two channels.
Figure 4.5: PV Wiring. This diagram shows the correct connection of positive and negative terminals for two PV module channels to the inverter.

DANGER:

  • Before connecting PV modules, be sure to disconnect the circuit breaker to avoid the risk of electric shock. Do not conduct live operation.
  • Please make sure that the open circuit voltage of the series connected PV modules does not exceed the maximum open circuit voltage of the inverter (in ASP series, this value is 550 V); otherwise, the inverter may be damaged.

4.6 Dry contact wiring

Use a small-sized screwdriver to push back in the direction indicated by the arrow, and then insert the communication cable into the dry contact port. (Communication cable section: 0.2mm²-1.5mm²)

Diagram showing how to connect the dry contact wiring to the inverter using a small screwdriver.
Figure 4.6: Dry Contact Wiring. This diagram illustrates the method for connecting the dry contact communication cable to the inverter.

4.7 Grounding

Please ensure that the grounding terminal is reliably connected to the grounding busbar.

Diagram showing the grounding terminal on the inverter and its connection point.
Figure 4.7: Grounding Connection. This diagram highlights the grounding terminal and its proper connection to a grounding busbar.

NOTICE: The grounding cable size shall not be less than 4 mm² and shall be as close as possible to the grounding point.

5. Operation

5.1 Starting the Inverter

After confirming reliable wiring and correct wiring sequence, restore the terminal cover to its original position.

  1. Step 1. Close the circuit breaker of the battery.
  2. Step 2. Press the rocker switch at the bottom of the inverter, and the screen and indicator will light up, indicating that the inverter is enabled.
  3. Step 3. Close the circuit breakers for PV input, AC input, and AC output in sequence.
  4. Step 4. Start loads one by one in order of power from small to large.

5.2 Operation and Display Panel

The operation and display panel of the inverter includes one LCD screen, three indicators, and four physical buttons.

Diagram of the inverter's LCD screen and physical buttons, showing their functions.
Figure 5.1: Operation and Display Panel. This diagram labels the LCD screen, LED indicators, and touchable keys (ESC, UP, DOWN, ENTER) for inverter control.
Table 5.1: Physical Button Functions
Physical buttonDescription
ESCEnter/Exit the setup menu.
UPGo to the next option.
DOWNGo to the previous option.
ENTERConfirm/Enter the option in setup menu.

LED Indicators

Table 5.2: LED Indicator Status
IndicatorsColorDescription
AC/INVYellowSteady on: utility grid bypass output.
Flash: inverter output.
CHARGEGreenSteady on: charging complete.
Flash: charging.
FAULTRedSteady on: level-1 fault.
Flash: level-2 fault.
Off: level-3 fault or level-4 fault.

Display Panel

Inverter LCD display showing real-time data and status icons.
Figure 5.2: LCD Display Panel. This image shows the various icons and data displayed on the inverter's LCD screen, including PV panel status, battery status, generator status, load status, and operational indicators.
Table 5.3: Display Panel Icons and Descriptions
IconDescriptionIconDescription
☀PV panel⚡Main
🔋Battery🏭Generator
⚙The inverter is working🏠Load
📶The inverter is communicating with the data collector🔇The buzzer is in mute mode
LThe inverter is in standby mode✓The inverter is working normally
⚠There is a fault⚙Settings
πLoad power: 80%–100%πSOC: 80%–100%
πLoad power: 60%–79%πSOC: 60%–79%
πLoad power: 40%–59%πSOC: 40%–59%
πLoad power: 20%–39%πSOC: 20%–39%
πLoad power: 5%–19%πSOC: 5%–19%
UNDER VOLTBattery under-voltageEND OF DISCHGBattery over-discharge
OVER LOADOverloadBMS FAULTBMS fault
COMSystem communication errorUVSystem under-voltage
OVSystem overvoltageUTToo low system temperature
OTToo high system temperatureOCSystem overcurrent
FULLBattery full powerUSERUser-defined battery
SLDSealed lead-acid batteryFLDFlooded lead-acid battery
GELGel lead-acid batteryNCMTernary Li-ion battery
LFPLFP Li-ion batteryECOEnergy-saving mode
PV LOADPV power is loadingPV CHGPV power is charging the battery
AC CHGAC input power is charging the batteryMAIN FIRSTThe output mode of the inverter is mains first
BYPASSThe output mode of the inverter is mains bypassSOLAR FIRSTThe output mode of the inverter is PV first
BATT FIRSTThe output mode of the inverter is battery first

5.3 LCD Screen Settings

NOTICE: On the screen, press the UP/DOWN button to view real-time data of the inverter in operation.

Flowchart of LCD screen navigation for settings and parameter viewing.
Figure 5.3: LCD Screen Navigation. This flowchart shows how to navigate from the Main Screen to view parameters, edit parameters, set parameters, and confirm parameters.
Table 5.4: LCD Screen Settings (Partial)
No.ItemOptionDescription
00ExitESCExit the setup menu.
01AC output modeUTI (default)Photovoltaic energy priority with the load, photovoltaic is not enough, the grid power and photovoltaic mixed load, photovoltaic energy is enough with the load, the excess energy to charge the battery, the grid power only starts charging when the battery is too discharged (06 Settings as "OSO(only PV)", the grid power will not charge), the battery is only discharged when off the grid.
SBUInverter first. The PV mode is to be applied first for loading, and only when the battery voltage is lower than the set value in the item 4, it will switch to the mains mode for loading. When the battery voltage is higher than the set value in the item 5, it will switch back to the PV mode from the mains mode.
SOLThe PV mode is to be applied first and when the PV power is unavailable or the battery voltage is lower than the set value in the item 4, it will switch to the mains mode.
SUBSolar energy priority charging, insufficient solar energy, grid energy and solar energy hybrid charging (if 06 Settings as "OSO(only PV)", the grid energy will not charge) and grid with load, when solar energy is enough to charge, excess energy not enough to load, excess solar energy and grid will hybrid load, the battery is discharged only when off the grid
02AC input frequency50.0 / 60.0 (default)In bypass mode, the AC output frequency will adapt to the mains frequency, and in other cases, the output will follow the preset value.
03AC input voltage rangeUPS (default) / APLUPS: When the output voltage is 120/110 V, the input voltage range is 90 V-140 V. APL: When the output voltage is 100/105 V, the input voltage range is 85 V-140 V.
04Battery to mains voltage threshold43.6 (default)When the parameter item 01 is SBU or SOL and the battery voltage is lower than the threshold, the output switches from inverter to mains. Setting range: 40 V-52 V.
05Mains to battery voltage threshold57.6 (default)When the parameter item 01 is SBU or SOL and the battery voltage is higher than the threshold, the output switches from mains to inverter. Setting range: 48 V-60 V.
06Battery charge modeSNU (default)When both PV power and mains are used to charge the battery at one time, the PV charge first and when the PV power is insufficient, the mains tags in. Only in bypass mode can both PV power and mains be used to charge the battery at one time, and only the PV charge mode can be enabled during inverter operation.
OSODo not enable the mains charge mode when in only PV charge mode.
07Battery charge current60APOW-SunSmart 6.5KP setting range: 0-140A.
08Battery typeGEL (default)Gel lead-acid battery.
USERUser-defined, and in this type, you can set all battery parameters.
SLDSealed lead-acid battery.
FLDFlooded lead-acid battery.
L14/L15/L16LFP battery L14/L15/L16, corresponding to 14, 15, and 16 series of LFP batteries.
N13/N14Ternary Li-ion battery N13/N14, corresponding to 13 and 14 series of ternary Li-ion batteries.
NObNo battery.
09Battery boost charge voltage56.8Setting range: 48 V-58.4 V, with a step of 0.4V, available for user-defined and lithium-ion battery types.
10Boost charge duration120The continuous charging time when the voltage reaches the set voltage during constant voltage charging, with a setting range of 5 min-900 min and a step of 5 min.
11Battery floating charge voltage55.2Setting range: 48 V-58.4 V, with a step of 0.4 V. This parameter cannot be set after successful BMS communication.
12Battery over-discharge voltage (delayed shutdown)42When the battery voltage is lower than the voltage and triggers the set value in the item 13, it will turn off the inverter output. Setting range: 40 V-51.2 V, with a step of 0.4 V.
13Battery over-discharge delay time5When the battery voltage is lower than the set value in the item 12 and triggers the delay time set in this parameter item, it will turn off the inverter output. Setting range: 5s-50s, with a step of 5s.
14Battery under-voltage alarm threshold44When the battery voltage is lower than the threshold, it will give an under-voltage alarm and the output will not shut down. Setting range: 40 V-52 V, with a step of 0.4 V.
15Battery discharge limit voltage40When the battery voltage is lower than the value, the output immediately shuts down. Setting range: 40 V-50 V, with a step of 0.4 V, available for user-defined and Li-ion batteries
16Battery equalizing chargingDIS(default) / ENADIS: Disable equalizing charge. ENA: Enable equalizing charge, but only available for flooded lead-acid batteries, sealed lead-acid batteries, and user-defined ones.
17Equalizing charge voltage58Setting range: 48 V-59.2 V, with a step of 0.4 V, but only available for flooded lead-acid batteries, sealed lead-acid batteries, and user-defined ones.
18Equalizing charge duration120Setting range: 5 min - 900 min, with a step of 5 min, but only available for flooded lead-acid batteries, sealed lead-acid batteries, and user-defined ones.
19Equalizing charge delay time240Setting range: 5 min - 900 min, with a step of 5 min, but only available for flooded lead-acid batteries, sealed lead-acid batteries, and user-defined ones.
20Equalizing charge interval30Setting range: 0 day - 30 days, with a step of 1 day, but only available for flooded lead-acid batteries, sealed lead-acid batteries, and user-defined ones.
21Equalizing charge Enable/DisableDIS (default) / ENADIS: Stop equalizing charge immediately. ENA: Start equalizing charge immediately.
22Energy-saving modeDIS (default) / ENADIS: Disable energy-saving mode. ENA: Enable energy-saving mode, and when the load power is below 50 W, it will turn off the inverter output after a 5-minute delay. When it exceeds 50 W, the inverter will automatically restart.
23Overload auto restartDIS (default) / ENADIS: Disable overload auto restart and when overload occurs, it will turn off the output and the inverter will no longer resume startup. ENA: Enable overload auto restart, and If overload occurs, the output will be turned off, and after a delay of 3 min, the output will restart. After 5 cumulative attempts, the inverter will no longer resume startup.
25Buzzer alarmDIS / ENA (default)DIS: Disable buzzer alarm. ENA: Enable buzzer alarm.
26Mode switch promptDIS / ENA (default)DIS: Disable prompt when the status of the main input source changes. ENA: Enable prompt when the status of the main input source changes.
27Inverter to bypass switchDIS / ENA (default)DIS: Disable auto switch to mains for loading in case of inverter overload. ENA: Enable auto switch to mains for loading in case of inverter overload.
28Grid charge current60APOW-SunSmart 6.5KP setting range: 0-80A.
30RS485 communication addressID: 1Setting range: 1-254.
31Parallel modeSIG (default)Single inverter operation
PALParallel operation
2P0/2P1/2P2Two-phase parallel operation
Set to "2P0" for the machine screens connected to P1. Assuming that the output voltage of the setting item [38] is set to 120 VAC. 1) When all the inverters connected to P2 are set to "2P1" on the screen, the voltage phase difference between P1 and P2 is 120°, the voltage between the live wire L1 of phase-P1 and the live wire L2 of phase-P2 is 120*1.732=208 VAC, and the voltage of L1-N and L2-N is 120 VAC. 2) When all the inverters connected to P2 are set to "2P2" on the screen, the voltage phase difference between P1 and P2 is 180°, the voltage between the live wire L1 of phase-P1 and the live wire L2 of phase-P2 is 120*2=240 VAC, and the voltage of L1-N and L2-N is 120 VAC.
3P1/3P2/3P3Three-phase parallel operation
Set to "3P1" on the screen for all the inverters connected to P1; set to "3P2" on the screen for all the inverters connected to P2; and set to "3P3" on the screen for those connected to P3. 1) Assuming that the output voltage of the setting item [38] is set to 120 VAC: then the voltage phase difference of P1-P2, P1-P3, and P2-P3 is 120°, the voltage between the live wire L1 of phase-P1 and the live wire L2 of phase-P2 is 120*1.732=208 VAC, and similarly the voltage of L1-L3 and L2-L3 is 208 VAC; the voltage of L1-N, L2-N, and L3-N is 120 VAC.
32RS485 communication functionDIS (default) / 485 / CANDIS: Enable PC and Remote Monitoring Protocol. 485: Enable the BMS communication function based on RS485 communication. CAN: Enable the BMS communication function based on CAN communication.
33BMS communicationPAC = PACE, RDA = Ruida, AOG = Aoguan, OLT = Oliter, HWD = Sunwoda, DAQ = Daqin, WOW = SRNE, PYL = Pylontech, UOL = Vilion.Select the corresponding communication protocol in item 33 when you set it to 485 or CAN in item 32.
35Battery under-voltage recovery threshold52When the battery is under voltage, the battery voltage needs to be greater than the threshold to restore the AC output of the battery inverter. Setting range: 44 V-54.4 V.
37Recharge voltage threshold for fully charged battery52After the battery is fully charged, the inverter stops charging, and recovers charging when the battery voltage is lower than the threshold. Setting range: 44 V-54 V.
38AC output voltage120Setting range: 100/105/110/120/127VAC.
39Charge current limit (when BMS works)LCSET / LCBMS (default)LCSET: The maximum battery charge current is not greater than the set value of [item 07]. LCBMS: The maximum battery charge current is not greater than the maximum value of BMS.
40Period-1 battery charge start time00:00:00Setting range: 00:00:00-23:59:00.
41Period-1 battery charge end time00:00:00Setting range: 00:00:00-23:59:00.
42Period-2 battery charge start time00:00:00Setting range: 00:00:00-23:59:00.
43Period-2 battery charge end time00:00:00Setting range: 00:00:00-23:59:00.
44Period-3 battery charge start time00:00:00Setting range: 00:00:00-23:59:00.
45Period-3 battery charge end time00:00:00Setting range: 00:00:00-23:59:00.
46Timed battery charge functionDIS (default) / ENADIS: Disable the function. ENA: After the timed mains charge/loading function is enabled, the power supply mode will turn into SBU, where mains is available for power supply in the set period or after battery over-discharge. If the timed discharge function is enabled at the same time, the power supply mode of the system will be changed into UTI, where mains is only available for power supply in the set charge period, and the system only switches to the power supply of battery inverter during the set discharge period or mains failure.
47Period-1 battery discharge start time00:00:00Setting range: 00:00:00-23:59:00.
48Period-1 battery discharge end time00:00:00Setting range: 00:00:00-23:59:00.
49Period-2 battery discharge start time00:00:00Setting range: 00:00:00-23:59:00.
50Period-2 battery discharge end time00:00:00Setting range: 00:00:00-23:59:00.
51Period-3 battery discharge start time00:00:00Setting range: 00:00:00-23:59:00.
52Period-3 battery discharge end time00:00:00Setting range: 00:00:00-23:59:00.
53Timed battery discharge functionDIS (default) / ENADIS: Disable the function. ENA: After the timed battery discharge function is enabled, the power supply mode will be changed into UTI, where the system only switches to the power supply of battery inverter during the set discharge period or mains failure.
54Current date00:00:00Year/Month/Day Setting range: 00:01:01-99:12:31.
55Current time00:00:00Setting range: 00:00:00-23:59:59.
56Leakage current protection enableDIS(default) / ENADIS: Disable leakage current protection. ENA: Enable leakage current protection.
57Charge stop current3The charge stops when the charge current is less than the set value. (unit: A)
58SOC setting for discharge alarming15When the capacity is less than the set value, the SOC alarms. (unit: %, only available during normal BMS communication)
59SOC setting for discharge cutoff5When the capacity is less than the set value, the discharge stops. (unit: %, only available during normal BMS communication)
60SOC setting for charge cutoff100When the capacity is greater than the set value, the charge stops. (unit: %, only valid during normal BMS communication)
61SOC setting for switching to mains10When the capacity is less than the set value, it switches to mains. (unit: %, only available during normal BMS communication)
62SOC setting for switching to inverter output100When the capacity is greater than the set value, it switches to the inverter output mode.
63Auto N-PE connection switch functionDIS (default) / ENADIS: Disable auto N-PE connection switch. ENA: Enable auto N-PE connection switch.
67Power sales setting0 (default)Setting range: 0-rated power.
68AC output phase mode0 / 180 (default)0: represents the single-phase mode. Assuming that the AC output voltage of item 38 is 120 V, the phase difference of L1-L2 is 0°, and L1/L2 can be connected in parallel, the phase voltage of L1-N/L2-N is 120 V. 180: represents the split-phase mode. Assuming that the AC output voltage of item 38 is 120 V, the phase difference of L1-L2 is 180°, the phase voltage of L1-N/L2-N is 120 V, and the voltage of L1-L2 is 240 V.
73Max charging current by generator40APOW-SunSmart 6.5KP setting range: 0-80A.
74Generator input power6KWSetting range: 0-10KW.
75Battery Temperature CompensationSelect whether to enable temperature compensation. (Applicable to lead-acid batteries; ineffective for lithium batteries.)
76External CT Ratio1000 (default)When an external CT is connected, enter the ratio indicated on the CT specification. Setting range: 0-5000
77Anti-Backflow Calibration Power100 W (default)Under anti-backflow operation, the calibration power is used to correct inverter sampling deviations. Default value: 100 W, setting range: 0-500 W
78Battery Discharge Current for Hybrid Load Mode100 A (default)Sets the battery discharge current when the battery and the grid supply the load simultaneously. Setting range: 0-140 A

5.4 Timed Charge/Discharge Function

POW-SunSmart 6.5KP has the timed power charge/discharge function. Users can set different charge and discharge periods according to the local time-of-use price, thus reasonably using mains and PV power. When mains is expensive, the battery inverter is used to supply power to the load; when mains is cheap, it can be used to supply power to and charge the load, thus helping users reduce electricity expenses to the full extent. Users can turn on/off the timed charge/discharge function in items 46 and 53 in the setup menu, and set charge and discharge periods in parameters 40-45 and 47-52.

Before using the function for the first time, please set the local time and date in parameters 54 and 55, and then you can set corresponding periods based on the local time-of-use price.

NOTICE:

Graph showing Peak-Valley Electricity Tariff and diagrams for Timed Charge/Loading and Timed Battery Discharge functions.
Figure 5.4: Timed Charge/Discharge Function. This figure illustrates the concept of peak-valley electricity tariffs and how the inverter's timed charge/loading and discharge functions can be configured over three definable periods to optimize energy usage and cost savings.

5.5 Battery Parameters

Lead-acid battery

Table 5.5: Lead-acid Battery Parameters
ParametersSealed lead acid battery (SLD)Gel lead acid battery (GEL)Flooded lead acid battery (FLD)User-defined (USE)Adjustable
Overvoltage disconnection voltage60V60V60V60V
Battery fully charged recovery point52V52V52V52V√
Boost charge voltage57.6V56.8V57.6V40~58.4V√
Undervoltage alarm voltage ([01] fault)44V44V44V40~52V√
Undervoltage alarm voltage recovery point ([01] fault)Undervoltage alarm voltage+0.8V
Low voltage disconnection voltage ([04] fault)42V42V42V40~51.2V√
Low voltage disconnection voltage recovery point ([04] fault) (setup item [35])52V52V52V52V√
Discharge limit voltage---40~50V√
Over-discharge delay time5s5s5s5~50s√
Boost charge duration---5~900 minutes√

Li-ion battery

Table 5.6: Li-ion Battery Parameters
ParametersTernary (N13)Ternary (N14)LFP (L16)LFP (L15)LFP (L14)Adjustable
Overvoltage disconnection voltage60V60V60V60V60V
Battery fully charged recovery point50.4V54.8V53.6V50.4V47.6V√
Boost charge voltage53.2V57.6V56.8V53.2V49.2V√
Undervoltage alarm voltage ([01] fault)43.6V46.8V49.6V46.4V43.2V√
Undervoltage alarm voltage recovery point ([01] fault)Undervoltage alarm voltage+0.8V
Low voltage disconnection voltage ([04] fault)38.8V42V48.8V45.6V42V√
Low voltage disconnection voltage recovery point ([04] fault) (setup item [35])46V49.6V52.8V49.6V46V√
Discharge limit voltage36.4V39.2V46.4V43.6V40.8V√
Over-discharge delay time30s30s30s30s30s√
Boost charge duration120 minutes120 minutes120 minutes120 minutes120 minutes√

6. Communication

6.1 Overview

Diagram of the inverter's communication ports, including USB-B, CT, WIFI, RS485/CAN, Dry Contact, and Parallel Port.
Figure 6.1: Communication Ports Overview. This diagram labels the various communication ports on the inverter for external connections.
Table 6.1: Communication Ports
No.PortNo.PortNo.Port
1USB-B port2CT port3WIFI port
4RS485/CAN port5Dry contact port6Parallel port

6.2 USB-B port

Diagram showing USB-B port connection to a computer for monitoring.
Figure 6.2: USB-B Port Connection. This diagram illustrates connecting the inverter's USB-B port to a computer using a USB2.0 printer cable for monitoring and parameter modification.

Users can use the upper computer software through the port to read and modify device parameters. If needing the installation package for the upper computer software, you can download it from the official website of SRNE, or contact us to get it.

6.3 WIFI port

The WIFI port is used to connect to the Wi-Fi/GPRS data acquisition module, and then users can view the operation status and parameters of the inverter via the mobile APP.

Diagram showing WIFI port connection to a Wi-Fi/GPRS module for remote monitoring via mobile app.
Figure 6.3: WIFI Port Connection. This diagram shows how to connect a Wi-Fi/GPRS data acquisition module to the inverter's WIFI port for remote monitoring via a mobile application.
Table 6.2: RJ45 Pin Definition for WIFI Port
RJ45 PinDefinition
Pin 15 V
Pin 2GND
Pin 3/
Pin 4/
Pin 5/
Pin 6/
Pin 7RS485-A
Pin 8RS485-B

6.4 RS485/CAN port

The RS485/CAN port is used to connect to the BMS of the Li-ion battery.

Diagram of the RS485/CAN port pinout for BMS communication.
Figure 6.4: RS485/CAN Port Pinout. This diagram details the pin assignments for the RS485/CAN port, used for communication with a Battery Management System (BMS).
Table 6.3: RJ45 Pin Definition for RS485/CAN Port
RJ45 PinDefinition
Pin 15 V
Pin 2GND
Pin 3/
Pin 4/
Pin 5/
Pin 6/
Pin 7RS485-A
Pin 8RS485-B

6.5 Dry contact port

The dry contact port has 4 functions:

  1. RSD power supply
  2. Remote ON/OFF
  3. Battery temperature sampling
  4. Remote generator start/stop
Diagram of the dry contact port pinout and its functions.
Figure 6.5: Dry Contact Port Pinout. This diagram shows the pin assignments for the dry contact port and their corresponding functions, including RSD power supply, remote ON/OFF, battery temperature sampling, and remote generator start/stop.
Table 6.4: Dry Contact Port Functions
FunctionDescription
RSD power supplyPIN 1 is GND, PIN 2 is RSD 12V+
Remote ON/OFFWhen pin 1 is connected to pin 3, the inverter will turn off the AC output. When disconnected, the inverter is in normal output.
Temperature sampling (reserved)Pins 1 and 4 can be used for battery temperature sampling compensation.
Remote generator start/stopWhen the battery voltage reaches the under-voltage alarm voltage (parameter 14) or the voltage threshold for mains to switch to the battery (parameter 04), pins 6 to 5 are normally open, and pins 7 to 5 are normally closed. When the battery voltage reaches the voltage threshold for the battery to switch to mains (parameter 05), or the battery is fully charged, pins 6 to 5 are normally closed, and pins 7 to 5 are normally open. (5/6/7 pin output: 125 VAC/1 A, 230 VAC/1 A, and 30 VDC/1 A)

NOTICE: If you need to use the remote start/stop function of the generator with dry contact, please ensure that the generator has an ATS and supports remote start/stop.

7. Fault Codes and Response Measures

7.1 Fault codes

Inverter LCD display showing fault code area.
Figure 7.1: Fault Code Display. This image highlights the area on the LCD display where fault codes are shown.
Table 7.1: Fault Codes and Descriptions
Fault CodeMeaningAffect Output or NotDescription
01BatVoltLowYesBattery under-voltage alarm.
02BatOverCurrSwYesOvercurrent software protection for average battery discharge current.
03BatOpenYesDisconnected battery alarm.
04BatLowEodYesUnder-voltage battery discharge stop alarm.
05BatOverCurrHwYesBattery overcurrent hardware protection.
06BatOverVoltYesCharge overvoltage protection.
07BusOverVoltHwYesBus overvoltage hardware protection.
08BusOverVoltSwYesBus overvoltage software protection.
09PvVoltHighYesPV overvoltage protection.
10PvBoostOCSwNoBoost overcurrent software protection.
11PvBoostOCHwNoBoost overcurrent hardware protection.
12SpiCommErrYesSPI communication fault of master and slave chips.
13OverloadBypassYesBypass overload protection.
14OverloadInverterYesInverter overload protection.
15AcOverCurrHwYesInverter overcurrent hardware protection.
16AuxDSpReqOffPWMYesSlave chip OFF request fault.
17InvShortYesInverter short-circuit protection.
18BussoftfailedYesBus soft-start failure.
19OverTemperMpptNoPV heat sink over-temperature protection.
20OverTemperInvYesInverter heat sink over-temperature.
21FanFailYesFan fault.
22EEPROMYesMemory fault.
23ModelNumErrYesModel setting error.
24BusdiffYesPositive and negative bus voltage imbalance.
25BusShortYesBus short-circuit.
26RlyshortYesInverter AC output backward to bypass AC output.
28LinePhaseErrYesMains input phase error.
29BusVoltLowYesBus low-voltage protection.
30BatCapacityLow1YesAlarm of battery capacity rate below 10% (taking effect after BMS communication is successful).
31BatCapacityLow2NoAlarm of battery capacity rate below 5% (taking effect after BMS communication is successful)
32BatCapacityLowStopYesBattery low-capacity OFF (taking effect after BMS communication is successful).
34CanCommFaultYesParallel can communication fault.
35ParaAddrErrYesParallel ID (communication address) setting error.
37ParaShareCurrErrYesParallel current sharing fault.
38ParaBattVoltDiffYesLarge battery voltage difference in parallel mode.
39ParaAcSrcDiffYesInconsistent mains input source in parallel mode.
40ParaHwSynErrYesHardware synchronization signal error in parallel mode.
41InvDcVoltErrYesInverter DC voltage error.
42SysFwVersionDiffYesInconsistent system firmware version in parallel mode.
43ParaLineContErrYesParallel connection fault.
44SerialnumbererrorYesFailure to set the serial number before leaving factory.
45Errorsettingofsplit-phasemodeYesSetting error of setting items in parallel mode.
56LowinsulationNoAbnormally low earth impedance of PV1+, PV2+, and PV-.
57Leakagecurrent overloadfaultYesSystem current leakage out of the standard.
58BMSComErrNoBMS communication fault.
60BMSUnderTemNoBMS under-temperature alarm (taking effect after BMS communication is successful).
61BMSOverTemNoBMS over-temperature alarm (taking effect after BMS communication is successful).
62BMSOverCurNoBMS overcurrent alarm (taking effect after BMS communication is successful).
63BMSUnderVoltNoBMS under-voltage alarm (taking effect after BMS communication is successful).
64BMSOverVoltNoBMS overvoltage alarm (taking effect after BMS communication is successful).

7.2 Troubleshooting

Table 7.2: Troubleshooting Guide
Fault CodeMeaningCauseSolution
/No screen displayThere is no power input, or the device switch at its bottom is not turned onCheck if the battery air-switch or PV air-switch has been closed; check if the switch is in "ON"; press any button on the screen to exit the screen sleep mode.
01Battery under-voltageThe battery voltage is lower than the value set in parameter [14]Charge the battery until the battery voltage exceeds the value set in parameter [14].
03Disconnected batteryThe battery is not connected, or the BMS of the lithium-ion battery is in the discharge protection stateThe battery is not connected, or the BMS of the lithium-ion battery is in the discharge protection state
04Battery over-dischargeThe battery voltage is lower than the value set in parameter 12Manual reset: Turn off the power, and restart. Automatic reset: Charge the battery until the battery voltage is higher than the value set in parameter [35]
06Rechargeable battery overvoltage protectionThe battery is in the overvoltage stateManually turn off the power, and restart. Check if the battery voltage exceeds the limit. If the limit is exceeded, discharge the battery until the voltage is below the overvoltage recovery threshold of the battery.
13Bypass overload (software detection)The output power or current of the bypass is overloaded within a certain periodReduce the load power, and restart the device. For more details, please refer to item 11 in Protection Function.
14Inverter overload (software detection)The output power or current of the inverter is overloaded within a certain periodReduce the load power, and restart the device. For more details, please refer to item 11 in Protection Function.
19Over-high temperature of the heat sink for PV input (software detection)The temperature of the heat sink for PV input exceeds 90°C for 3sWait until the temperature of the heat sink is below the over-temperature recovery temperature, when charge and discharge return to normal
20Over-high temperature of the heat sink for inverter output (software detection)The temperature of the heat sink for inverter output exceeds 90°C for 3sWait until the temperature of the heat sink is below the over-temperature recovery temperature, when charge and discharge return to normal
21Fan faultSoftware detection founds the fan has a faultShut down, manually flick the fan, and check if any foreign objects are blocking it
26AC input relay short-circuitStuck relay for AC outputManually shut down, and restart. If the fault occurs again after restarting, contact the after-sales service personnel to repair the machine
28Mains input phase faultThe phase of AC input is inconsistent with that of AC outputEnsure that the phase of AC input is the same as that of AC output. For example, if the output is in the split-phase mode, the input shall also be in the split-phase mode.

NOTICE: If you encounter product faults that cannot be solved by the methods listed in the above table, please contact our after-sales service department for technical support, and do not disassemble the device by yourself.

8. Protection Function and Product Maintenance

8.1 Protection function

Table 8.1: Inverter Protection Functions
No.Protection FunctionDescription
1PV current-limiting protectionWhen the charge current or power of the configured PV array exceeds the rated current and power of the inverter, it will charge at the rated current and power.
2PV overvoltage protectionIf the PV voltage exceeds the maximum allowable value of hardware, the machine will report the fault, and stop the step-up of PV to output sine AC waves.
3Reverse charge protection at nightAt night, as the battery voltage is greater than that of the PV module, it will prevent the battery from discharging to the PV module.
4Mains input overvoltage protectionWhen the mains voltage of each phase exceeds 140 VAC, it will stop mains from charging, and switch it to inverter output.
5Mains input under-voltage protectionWhen the mains voltage of each phase is lower than 90 VAC, it will stop mains from charge, and switch it to inverter output.
6Battery overvoltage protectionWhen the battery voltage reaches the overvoltage disconnect voltage threshold, it will automatically stop PV and mains from charging the battery, thus preventing damage to the battery due to overcharge.
7Battery under-voltage protectionWhen the battery voltage reaches the low-voltage disconnect voltage threshold, it will automatically stop discharging the battery, thus preventing damage to the battery due to over-discharge.
8Battery overcurrent protectionWhen the battery current exceeds the allowable range of hardware, the machine will turn off the output, and stop discharging the battery.
9AC output short-circuit protectionWhen a short-circuit fault occurs at the load output terminal, it will immediately turn off the output of AC voltage. Only after manually powering on the device, normal output restores.
10Heat sink over-temperature protectionWhen the internal temperature of the inverter is too high, the inverter will stop charging and discharging; when the temperature returns to normal, the inverter will charge and discharge again.
11Overload protectionAfter overload protection is triggered, the inverter output will be restored after 3 min, and after 5 times of overload, the output will be off until the frequency changer is restarted. (102%< load <110%): An error will be reported, and the output will be turned off after 5 min. (110%< load <125%): An error will be reported, and the output will be turned off after 10s. Load >125%: An error will be reported, and the output will be turned off after 5s.
12AC backward protectionPrevent the mains of battery inverter backward to bypass AC input
13Bypass overcurrent protectionBuilt-in circuit breaker for AC input overcurrent protection.
14Bypass wiring error protectionWhen the phase of the two bypass inputs is different from that of the inverter split-phase, the machine will prohibit connecting to the bypass, thus preventing the power failure or short circuit of load when connecting to the bypass.

8.2 Maintenance

In order to maintain the best long-term performance, it is recommended to conduct following checks twice a year.

  1. Make sure that the airflow around the inverter is smooth, and remove any dirt or debris from the heat sink.
  2. Check whether the insulation of all exposed wires is damaged by exposure to sunlight, friction with other objects around them, dryness, bite by insects or rodents, etc. Repair or replace wires if necessary.
  3. Verify the consistency of the indication and display with the device operation. Please pay attention to any faults or errors, and take corrective actions if necessary.
  4. Check all wiring terminals for corrosion, insulation damage, and signs of high temperature or burning/discoloration, and tighten the terminal screws.
  5. Check for dirt, nesting insects, and corrosion, clean up as required, and clean the Insect proof net regularly.
  6. If the arrester fails, replace it in time against lightning damage to the inverter or even other devices of the user.

DANGER: Before conducting any inspection or operation, please ensure that the inverter is disconnected from all power sources and that the capacitor is fully discharged to avoid the risk of electric shock.

Our company will not be held responsible for damage due to the following reasons:

  1. Damage caused by improper use or use in the wrong location.
  2. The open circuit voltage of the PV module exceeds the maximum allowable voltage.
  3. The operating temperature exceeds the limited operating temperature range.
  4. Unauthorized personnel dismantle, and repair the inverter.
  5. Force majeure: damage during transportation or handling of the inverter.

9. Specifications (Data Sheet)

Table 9.1: PowMr POW-SunSmart 6.5KP Data Sheet
Inverter ModelPOW-SunSmart 6.5KPSettable
Inverter output
Rated output power6500W
Max. peak power13,000 VA
Rated output voltage120/240 VAC (single-phase/split-phase)Y
Rated frequency50/60 HzY
Output wavePure sine wave
Switching time10 ms (typical value)
Parallel number6
Battery
Battery typeLithium-ion battery/lead-acid battery/user-defined batteryY
Rated battery voltage48 Vdc
Voltage range40 Vdc-60 VdcY
Max. mains/generator charge current80 AY
Max. mix charge current140 AY
PV input
MPPT channel number2
Max. input power5000W/5000W
Max. Input Current18/18 A
Max. open circuit voltage550 Vdc+550Vdc
MPPT operating voltage range150 Vdc-450 Vdc
Mains/generator input
Input voltage range65 VAC-140 VAC
Input frequency range50/60 Hz
Bypass overload current40A
Efficiency
MPPT tracking efficiency99.9%
Max. efficiency of battery93%
General
Dimension584.6mm*410 mm*133 mm
Weight18.9 kg
Protection levelIP20, for indoor use only
Ambient temperature-10°C-55°C, >45°C derating
Noise<60 dB
Cooling modeIntelligent fan
Communication
Built-in interfaceRS485/CAN/USB/dry contactY
External module (optional)Wi-Fi/GPRSY
Certification
SafetyIEC62109-1, IEC62109-2, and UL1741
EMCEN61000-6-1, EN61000-6-3, and FCC 15 class B
RoHSYes

10. Parallel Wiring

10.1 Parallel operation

The parallel operation supports up to six solar storage inverters. When using the parallel function, it is necessary to connect the parallel communication cable in a correct and reliable manner. See the figure below for the communication cable (packaging accessory):

Image of the parallel communication cable for the inverter.
Figure 10.1: Parallel Communication Cable. This image shows the cable used for connecting multiple inverters in parallel.

10.2 Cautions for parallel connection

Warning:

  1. PV wiring: In parallel connection, the PV array of each inverter must be independent, and the PV array of PV1 and PV2 for one inverter must also be independent.
  2. Battery wiring: In single-phase or three-phase parallel connection, all solar storage inverters must be connected to the same battery, with BAT+ connected to BAT+ and BAT- to BAT-, and before power on and start-up, it is necessary to check and ensure correct connection, wiring length, and cable size, so as to avoid the abnormal operation of parallel system output caused by wrong connection.
  3. LOAD wiring: In single-phase parallel connection, all solar storage inverters must be connected in the manner of L-to-L, N-to-N, and PE-to-PE, and before power on and start-up, it is necessary to check and ensure correct connection, wiring length, and cable size, so as to avoid the abnormal operation of parallel system output caused by wrong connection. In three-phase parallel connection, all solar storage inverters must be connected in the manner of N-to-N and PE-to-PE. The L lines of all inverters in the same phase shall be connected together, but the AC output L lines of different phases shall not be connected together. Other cautions are the same as those for single-phase parallel connection.
  4. GRID and GEN wiring: In single-phase parallel connection, all solar storage inverters must be connected in the manner of L-to-L, N-to-N, and PE-to-PE, and before power on and start-up, it is necessary to check and ensure correct connection, wiring length, and cable size, so as to avoid the abnormal operation of parallel system output caused by wrong connection. Meanwhile, it is not allowed to have multiple different AC source inputs to avoid damage to the external equipment of the inverter. The AC source input shall be consistent and unique. In three-phase parallel connection, all solar storage inverters must be connected in the manner of N-to-N and PE-to-PE. The L lines of all inverters in the same phase shall be connected together, but the AC output L lines of different phases shall not be connected together. Other cautions are the same as those for single-phase.
  5. Communication wiring: Our company's communication cable for parallel operation is a DB15 standard computer cable with shielding function, and it is used for single-phase or three-phase parallel connection. Each inverter shall be connected with one out and one in, that is, the male connector (out) of the inverter is to be connected to the female connector (in) of the parallel inverter, not the one of the inverter. In addition, DB15 terminal screws will be used to tighten the communication cable of each parallel inverter to avoid falling off or poor contact of the communication cable, followed by abnormal operation or damage of the system output.
  6. Before and after connecting the system, please carefully refer to the following system wiring diagrams to ensure that all wiring is correct and reliable before power on.

10.3 Wiring diagram for single-phase parallel connection (phase difference between L1 and L2: 0°)

The communication cable of parallel solar storage inverter is to be locked with screws after connecting. Set the item [31] to "PAL" and the item [68] to "0°." When setting the item [38] to "120 V," the output L-N voltage is 120 V.

10.3.1 Two parallel-connected solar storage inverters:

Wiring diagram for two parallel-connected solar storage inverters in single-phase mode.
Figure 10.2: Two Parallel Inverters (Single-phase). This diagram shows the connections for two inverters operating in single-phase parallel mode.

10.4 Wiring diagram for two-phase parallel connection (phase difference between L1 and L2: 0°)

(1) P1: Set the item [31] to "2P0;" P2: Set the item [31] to "2P1," all of the P1/P2 inverter item [68] can not be set, it is default "0" and the phase difference between P1 and P2 is 120°. When setting the item [38] to "120 V," the voltage between the live wire L1 of P1 phase and the live wire L2 of P2 phase is 208 V, and the L1-N voltage is 120 V.

(2) P1: Set the item [31] to "2P0;" P2: Set the item [31] to "2P2," all of the P1/P2 inverter item [68] can not be set, it is default "0" and the phase difference between P1 and P2 is 180°. When setting the item [38] to "120 V," the voltage between the live wire L1 of P1 phase and the live wire L2 of P2 phase is 240 V, and the L1-N voltage is 120 V, L2-N voltage is 120V.

10.4.1 Split-phase system (two inverters) - 1+1 system:

Wiring diagram for two parallel-connected solar storage inverters in two-phase split-phase mode.
Figure 10.3: Two Parallel Inverters (Two-phase Split-phase). This diagram shows the connections for two inverters operating in two-phase split-phase parallel mode.

10.4.2 Split-phase system (three inverters) - 2+1 system:

Wiring diagram for three parallel-connected solar storage inverters in two-phase split-phase mode.
Figure 10.4: Three Parallel Inverters (Two-phase Split-phase). This diagram shows the connections for three inverters operating in two-phase split-phase parallel mode.

10.4.3 Split-phase system (four inverters) - 3+1 system:

Wiring diagram for four parallel-connected solar storage inverters in two-phase split-phase mode.
Figure 10.5: Four Parallel Inverters (Two-phase Split-phase). This diagram shows the connections for four inverters operating in two-phase split-phase parallel mode.

10.4.4 Split-phase system (five inverters) - 4+1 system:

Wiring diagram for five parallel-connected solar storage inverters in two-phase split-phase mode.
Figure 10.6: Five Parallel Inverters (Two-phase Split-phase). This diagram shows the connections for five inverters operating in two-phase split-phase parallel mode.

10.4.5 Split-phase system (six inverters) - 5+1 system:

Wiring diagram for six parallel-connected solar storage inverters in two-phase split-phase mode.
Figure 10.7: Six Parallel Inverters (Two-phase Split-phase). This diagram shows the connections for six inverters operating in two-phase split-phase parallel mode.

10.5 Wiring diagram for split-phase parallel connection (phase difference between L1 and L2: 180°)

Set the item [31] to PAL, and set the item [68] to 180°. When setting the item [38] to "120 V," the L1-L2 voltage is 240 V, and the L1-N voltage is 120 V, L2-N voltage is 120V.

10.5.1 Two parallel-connected solar storage inverters:

Wiring diagram for two parallel-connected solar storage inverters in split-phase mode (180° phase difference).
Figure 10.8: Two Parallel Inverters (Split-phase 180°). This diagram shows the connections for two inverters operating in split-phase parallel mode with a 180° phase difference.

10.5.2 Three parallel-connected solar storage inverters:

Wiring diagram for three parallel-connected solar storage inverters in split-phase mode (180° phase difference).
Figure 10.9: Three Parallel Inverters (Split-phase 180°). This diagram shows the connections for three inverters operating in split-phase parallel mode with a 180° phase difference.

10.6 Wiring diagram for three-phase parallel connection

P1: Set the item [31] to "3P1;" P2: Set the item [31] to "3P2;" P3: Set the same to "3P3", all of P1/P2/P3 inverters item [68] can not be set, it is default "0°". At this point, the P1-P2, P1-P3, and P2-P3 phase difference is 120°. When setting the item [38] to "120 VAC," the voltage between the live wire L1 of P1 phase and the live wire L2 of P2 phase is 120*1.732=208 VAC. Similarly, the L1-L3 and L2-L3 voltage is 208 VAC:

10.6.1 Three-phase system (three inverters) - 1+1+1 system:

Wiring diagram for three parallel-connected solar storage inverters in three-phase mode.
Figure 10.10: Three Parallel Inverters (Three-phase). This diagram shows the connections for three inverters operating in three-phase parallel mode.

10.6.2 Three-phase system (four inverters) - 2+1+1 system:

Wiring diagram for four parallel-connected solar storage inverters in three-phase mode.
Figure 10.11: Four Parallel Inverters (Three-phase). This diagram shows the connections for four inverters operating in three-phase parallel mode.

10.6.3 Three-phase system (five inverters) - 3+1+1 system:

Wiring diagram for five parallel-connected solar storage inverters in three-phase mode.
Figure 10.12: Five Parallel Inverters (Three-phase). This diagram shows the connections for five inverters operating in three-phase parallel mode.

10.6.4 Three-phase system (six inverters) - 2+2+1 system:

Wiring diagram for six parallel-connected solar storage inverters in three-phase mode.
Figure 10.13: Six Parallel Inverters (Three-phase). This diagram shows the connections for six inverters operating in three-phase parallel mode.

10.6.5 Three-phase system (six inverters) - 3+2+1 system:

Wiring diagram for six parallel-connected solar storage inverters in three-phase mode.
Figure 10.14: Six Parallel Inverters (Three-phase). This diagram shows the connections for six inverters operating in three-phase parallel mode.

10.6.6 Three-phase system (six inverters) - 2+2+2 system:

Wiring diagram for six parallel-connected solar storage inverters in three-phase mode.
Figure 10.15: Six Parallel Inverters (Three-phase). This diagram shows the connections for six inverters operating in three-phase parallel mode.

Note for Parallel Operation:

  1. Before powering on and lighting up the screen, check for correct wiring according to the above wiring diagrams to avoid system problems.
  2. Check all connections for firm fixing to avoid detachment and abnormal system operation.
  3. When connecting the AC output to the load, complete wiring according to the requirements of the electrical load to avoid damage to the load.
  4. Set the item [38] to the same parameter, or only set it in the host inverter. During parallel operation, the voltage set in the host shall prevail, so the host inverter will forcibly set the item to the value for slave inverters. Only in standby mode can the item be set.
  5. The inverter defaults to single mode at the factory. If using the parallel or three-phase function, set the item [31] on the screen as follows: Power on one inverter each time, turn off the other inverters, and then set the item [31] according to the on-site system operation mode. After setting the inverter, turn off the inverter, and set the other inverters one by one. After all are set, power on all inverters at one time to enter the working state.
  6. After the system runs, measure the correct output voltage before connecting to loads.

11. User Tips

Based on common user inquiries and feedback, here are some helpful tips for using your PowMr POW-SunSmart 6.5KP Hybrid Solar Inverter:

  • Initial Setup: Always double-check all wiring connections (PV, battery, AC input/output, generator, grounding) before powering on. Incorrect wiring is a common cause of initial setup issues.
  • Battery Compatibility: Ensure your battery type (Lead-acid, Lithium-ion) is correctly selected in the LCD settings (Parameter 08) to prevent charging/discharging problems. For user-defined batteries, carefully set all parameters according to the battery manufacturer's specifications.
  • Parallel Operation: When setting up multiple inverters in parallel, follow the specific wiring diagrams and ensure the communication cable is securely connected. Pay close attention to the phase settings (Parameter 31) and voltage consistency (Parameter 38) across all units.
  • Remote Monitoring: Consider adding the optional Wi-Fi accessory for convenient remote monitoring of your system's status and parameters via the mobile app. This can help in proactive troubleshooting.
  • Ventilation: Regularly check and clean the insect-proof net and ensure adequate clearance around the inverter (as specified in Section 3.3) to maintain proper airflow and prevent overheating.
  • Troubleshooting: If the inverter displays a fault code, refer to Section 7.1 for the meaning and Section 7.2 for the recommended solution. Do not attempt to disassemble the unit yourself if issues persist; contact customer support.

12. Warranty and Support

For technical support, warranty claims, or any inquiries regarding your PowMr POW-SunSmart 6.5KP Hybrid Solar Inverter, please contact:

  • Company: SHENZHEN HEHEJIN INDUSTRIAL CO.,LTD
  • Tel/Fax: +86 755-28219903
  • Email: support@powmr.com
  • Website: www.powmr.com
  • Address: Henggang Street, Longgang District, Shenzhen, Guangdong, China

Please have your product model and any relevant fault codes or symptoms ready when contacting support to ensure efficient assistance.

© 2024 PowMr. All rights reserved.


Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.