1. Product Overview
The TNCE FHM3-100E Series Dual Power Automatic Transfer Switch is a dedicated, purely mechanical switching device designed for reliable manual transfer between two power sources. It ensures continuous power supply to the load by preventing the simultaneous connection of both power sources through a robust mechanical interlock mechanism.
This series supports both 2-pole (2P) and 4-pole (4P) configurations, catering to single-phase and three-phase applications respectively. The switch operates manually via an external operating handle.
Typical Applications: Communication equipment, security systems, small medical instruments, lighting circuits, and other critical loads requiring power backup from sources like city grids, generators, or PV energy systems.
Figure 1: TNCE Dual Power Automatic Transfer Switch (2P and 4P models)
Product Demonstration Video
Video 1: Unboxing and Function Display of the TNCE Automatic Transfer Switch.
2. Important Safety Warnings
Incorrect installation and operation may cause severe electric shock, equipment damage, fire, or even personal injury.
Safety Information:
- Professional Installation: The installation, wiring, and maintenance of this product MUST be performed by a qualified electrician.
- Strictly No Live Work: Before performing any installation, wiring, or transfer operation, you MUST ensure that BOTH incoming power sources upstream of the switch are completely disconnected, and verify that all terminals are de-energized using appropriate voltage testers.
- A warning sign such as "Do Not Close, Men at Work" should be posted at the worksite.
Safe Operation Principles:
- During operation, ensure the switch is securely in one of the three stable positions: "Normal Source ON", "OFF", or "Reserve Source ON".
- It is strictly forbidden to force operation or bypass the mechanical interlock when both incoming power sources are live.
- Usage Environment: Install in a clean, dry, and well-ventilated indoor distribution cabinet.
3. Technical Specifications
| Item | Parameter | Notes |
|---|---|---|
| Model | FHM3-100E | |
| Rated Operational Voltage (Ue) | AC 220/380V | Single-Phase (2P) or Three-Phase (4P) |
| Rated Insulation Voltage (Ui) | AC 500V | |
| Rated Current (Ie) | 63A / 100A / 125A | Refer to the product nameplate for specific model rating |
| Rated Frequency | 50/60 Hz | |
| Number of Poles | 2P / 4P | No motorized mechanism or display |
| Operation Mode | Manual (External handle operation) | |
| Mechanical Interlock | Enforced Mechanical Interlock | Prevents paralleling of two sources |
| Conversion Power Outage Time | <8MS | Uninterruptible power supply switching function |
| Protection Degree | IP20 | When installed inside an enclosure |
Dimensions:
Figure 2: Dimensions for 2P and 4P models.
4. Unpacking and Inspection
Upon receiving your TNCE Dual Power Automatic Transfer Switch, carefully unpack the contents and perform the following checks:
- Verify that the main product body, operating handle, mounting screws, and this user manual are complete and present.
- Inspect the product for any visible damage that may have occurred during transportation.
- Manually operate the handle to feel the transition between the three stable positions ("Normal Source ON" - "OFF" - "Reserve Source ON"). Ensure the movement is smooth, distinct, and without sticking.
5. Installation and Wiring Guide
This procedure MUST be performed by a qualified electrician.
Step 1: Mechanical Installation
- Drill holes on the mounting plate of the distribution cabinet according to the switch's mounting hole spacing.
- Mount the switch body vertically and securely.
- Test the operation with the handle to ensure the mechanism moves flexibly and positions correctly.
Figure 3: 35 mm Standard Guide Rail Mounting.
Step 2: Electrical Wiring
CRITICAL! Power MUST be OFF before proceeding!
- Confirm all power sources are completely disconnected and verify de-energization using appropriate voltage testers.
- Incoming Connection (Normal Source): Connect the Line (L) and Neutral (N) wires of the Normal Power Source to the upper terminals on the "N" side of the switch body.
- Incoming Connection (Reserve Source): Connect the Line (L) and Neutral (N) wires of the Reserve Power Source to the upper terminals on the "R" side of the switch body.
- Outgoing Connection (Load): Connect the cables from the Load side to the lower output terminals of the switch.
- Check all connections to ensure they are secure and correct, and clean the work area.
Wiring Diagram for 2P Model:
Figure 4: Product Wiring Diagram for 2P (FHM3-100E/2P).
Wiring Diagram for 4P Model:
Figure 5: Product Wiring Diagram for 4P (FHM3-100E/4P).
6. Operation Instructions
Manual Transfer Procedure:
Transferring from Normal Source to Reserve Source:
- Turn OFF the upstream circuit breaker on the Normal source side.
- Move the operating handle from the "Normal Source ON" position, through the "OFF" position, to the "Reserve Source ON" position. You should feel a definite detent at each position.
- Turn ON the upstream circuit breaker on the Reserve source side. The load is now powered by the reserve source.
Transferring back from Reserve Source to Normal Source:
- Turn OFF the upstream circuit breaker on the Reserve source side.
- Move the operating handle from the "Reserve Source ON" position, through the "OFF" position, back to the "Normal Source ON" position.
- Turn ON the upstream circuit breaker on the Normal source side. The load is now restored to power from the normal source.
Figure 6: Manual handle and Auto/Manual switch.
7. Troubleshooting
| Symptom | Possible Cause | Professional Recommendation |
|---|---|---|
| Handle cannot be operated or is stuck |
|
|
| Load has no power after switching |
|
|
| Abnormal sparking or noise during operation |
|
|
8. Maintenance
Periodic Inspection (Recommended annually): A qualified electrician should inspect the tightness of connections, remove dust, and test the smoothness of manual operation with power completely off.
Warning: Any disassembly or adjustment of the switch body must be performed by trained professionals only.
9. User Tips
- Always prioritize safety. Before any interaction with the switch, ensure all power sources are disconnected and verified de-energized.
- Regularly check for any signs of wear, loose connections, or unusual sounds/smells. Address these promptly with a qualified professional.
- Keep the installation environment clean, dry, and well-ventilated to ensure optimal performance and longevity of the device.
- Familiarize yourself with the manual and practice the transfer procedure (with power off) to ensure smooth operation during an actual power event.
10. Compliance Declaration & Support
This product is designed and manufactured in accordance with the EU Low Voltage Directive LVD Directive 2014/35/EU and its harmonized standards, meeting its essential safety requirements. Referenced harmonized standards include but are not limited to EN 60947-1, EN 60947-3, etc.
CE and RoHS Compliant
For detailed item guides and documents, including a PDF version of the user manual, please refer to the official product page or contact customer support. The PDF manual can be found at: User manual (PDF).
For 24-hour professional consultation, guidance, and after-sales service, please scan the QR code on the product packaging or visit the TNCE Intelligent Store on AliExpress.