1. Introduction
This is a multifunctional solar inverter, integrated with an MPPT solar charge controller, a high-frequency pure sine wave inverter, and a UPS function module in one machine. It is ideal for off-grid backup power and self-consumption applications and can operate with or without batteries.
The complete system requires additional devices such as PV modules, a generator, or a utility grid. A WiFi module is available as a plug-and-play monitoring device, allowing users to monitor the PV system status via mobile phone or website anytime, anywhere.

Figure 1: System Connection Diagram. Shows solar modules, generator or utility, external battery packs, and home appliances connected to the inverter.

Figure 2: Four Charging and Three Output Modes. Charging models include Solar First, Utility First, Solar and Utility, Only Solar. Load working models include Utility First, Solar First, and SBU First.
2. Safety Instructions
Please read and understand all safety instructions before installation, operation, or maintenance of the inverter. Failure to follow these instructions may result in electric shock, fire, serious injury, or death.
2.1. Labels on Inverter and in Documentation
- CAUTION!⚠ Do not disconnect under load!
- Danger: High Voltage! Electrical Hazard!⚡
- Wait 5 minutes:⏱ Start maintaining the INVERTER at least 5 minutes after disconnecting all external power supplies.
- Read Instructions:📖 Read instructions carefully before performing any operation.
- Grounding:⏚ The system must be firmly grounded for operator safety.
2.2. General Safety Precautions
- Ensure correct battery system type (lithium or lead-acid) is selected.
- All electrical installations must comply with local electrical safety standards and be performed by qualified professionals.
- When installing PV modules during daytime, cover them with opaque materials to avoid high terminal voltage.
- CAUTION: Charge only deep-cycle lead-acid or lithium rechargeable batteries. Other battery types may burst.
- Do not disassemble the unit. Refer servicing to qualified personnel.
- Disconnect all wiring before maintenance or cleaning. Turning off the unit does not eliminate shock risk.
- NEVER charge a frozen battery.
- Select appropriate cable sizes as per specifications for optimum operation.
- Exercise caution with metal tools near batteries to prevent sparks or short circuits.
- Follow installation procedures strictly when disconnecting AC or DC terminals.
- Ensure the inverter is connected to a permanent grounded wiring system.
- NEVER short circuit AC output and DC input. Do NOT connect to mains if DC input is short-circuited.
- Ensure the inverter is completely assembled before operation.
3. Specifications
| Feature | Specification |
|---|---|
| Model Number | ECG-HVM3.6K-24V |
| Brand Name | ECGSOLAX |
| Power Rating | 3600W (3.6KW) |
| Input Voltage (Battery) | 24V |
| Output Voltage (AC) | 220-240V |
| Output Current (Max) | 100A |
| Output Frequency | 50Hz/60Hz (Auto Sensing) |
| Max. PV Array Open Circuit Voltage | 500VDC |
| PV Array MPPT Voltage Range | 40VDC~450VDC |
| Start-up Voltage | 60VDC |
| Dimensions (L*W*H) | 30*35*16 CM |
| Weight | 5KG |
| Certification | CE |
| EU LVD Voltage | Below 50Vac or 75Vdc |
4. Setup and Installation
4.1. Unpacking and Inspection
Upon receiving the product, inspect the outer packaging for any damage. Open the box and check if the internal equipment is intact. If any damage is found, contact your local distributor immediately.
4.2. Installation Tools
The following tools are recommended for installation:
- Multi-meter
- Protective gloves
- Insulated anti-smashing shoes
- Safety glasses
- ESD wrist strap
- Hammer drill
- Electric screwdriver
- Cross screwdriver
- Rubber mallet
- Spirit level
- Wire cutter / stripper
- Terminal crimping tool
4.3. Mounting Unit
Considerations:
- Do not mount on flammable construction materials.
- Mount on a solid, non-combustible surface (e.g., concrete).
- Install at eye level for easy LCD display reading.
- Ambient temperature should be between -10°C and 60°C.
- Mount vertically.
- Ensure at least 30cm clearance around the unit for heat dissipation and wiring access.
Mounting Steps:
- Use an 8mm drill bit to drill two holes 160mm apart on the mounting surface.
- Insert M6 expansion screws into the drilled holes.
- Hang the inverter vertically, aligning the top screw with the installed screws.
- Before connecting wires, remove the bottom cover by unscrewing four screws.

Figure 3: Recommended Mounting Clearances (30cm all sides).
4.4. External Protective Grounding Connection
DANGER: Ensure a reliable grounding connection to prevent electrical shock hazards.
- Prepare a yellow-green grounding cable (customer-supplied).
- Remove insulation from the cable end and crimp an OT terminal tightly.
- Connect the ground cable to the inverter using the M4 screw.

Figure 4: Grounding Connection Point (PE cable of AC IN cable used as grounding).
4.5. AC Input / Output Connection
CAUTION:
- Install a separate AC breaker (recommended 25A) between the inverter and AC input source.
- Do NOT mis-connect input and output connectors (AC IN, AC OUT).
- Connect AC cables with correct polarity (L and N). Reversed connections may damage the inverter.
- The N line of input and output must NOT be connected together.
Cable Suggestion: 14 AWG (2.075 mm²).
Steps:
- Ensure AC power is disconnected and the AC circuit breaker is open.
- Remove 12mm insulation from cable ends, shorten conductor to 10mm, insert into tubular terminal, and crimp tightly.
- Insert AC input/output cables according to polarities (PE: Yellow-Green, L: Brown/Black, N: Blue) and tighten terminal screws. Connect PE first.

Figure 5: AC Input and Output Wiring. Shows connections for L, N, and PE.
CAUTION: Appliances like air conditioners require 2-3 minutes to restart. Ensure such appliances have a time-delay function to prevent damage from power fluctuations.
4.6. PV Connection
CAUTION:
- Install a separate DC circuit breaker (recommended 25A, >500VDC) between the inverter and PV modules.
- Do not ground positive or negative terminals of PV modules.
- Exposure to sunlight generates lethal high voltages. Adhere to safety precautions.
- Connect PV terminals to corresponding ports; reversing polarity will damage the inverter.
Cable Suggestion: 14 AWG (2.075 mm²).
PV Module Selection:
- Open circuit Voltage (Voc) of PV modules must not exceed 500VDC.
- Voc of PV modules should be higher than the start-up voltage (60VDC).
- PV Array MPPT Voltage Range: 40VDC~450VDC.
Steps:
- Ensure the DC circuit breaker is open.
- Remove 12mm insulation from cable ends, shorten conductor to 10mm, insert into tubular terminal, and crimp tightly.
- Use a multi-meter to check and confirm correct polarities.
- Insert PV cables according to polarities (PV+: Red, PV-: Black) and tighten terminal screws.

Figure 6: PV Connection Points (PV+ and PV-).
4.7. Battery Connection
4.7.1. Lead-acid Battery Connection
CAUTION: Install a separate DC over-current protector or disconnect device (recommended 175A) between the battery and inverter.
Cable Suggestion: 2 AWG (25 mm²).
Steps:
- Unscrew pre-fixed screws on battery poles. Prepare 2 DT terminals for AWG2 cables.
- Remove 12mm insulation from cable ends, shorten conductor to 10mm, insert into DT terminal, and crimp tightly.
- Pass the battery cable through the bottom shell hole, tighten terminal screws. Ensure correct polarity at both battery and inverter.
- Connect all battery packs as required (suggested at least 200Ah capacity).
WARNING: Shock Hazard! Installation must be performed with care due to high battery voltage in series. Ensure positive (+) connects to positive (+) and negative (-) connects to negative (-).

Figure 7: Battery Connection Points (BAT+ and BAT-).
4.7.2. Lithium Battery Connection
If using a lithium battery, first check protocol compatibility.
Steps:
- Connect power cables as described for lead-acid batteries.
- Connect the RJ45 terminal of the battery communication cable to the inverter's BMS communication port (RS485 or CAN).
- Insert the other end of the RJ45 cable into the lithium battery's communication port.
- Set the battery type to 'Llb' or 'FEL' in Program 17 of the inverter settings.
BMS Port Pin Assignment:
- Pin 1: RS485B
- Pin 2: RS485A
- Pin 4: CANH
- Pin 5: CANL
4.8. Final Assembly
After all wiring is complete, reattach the bottom cover by screwing in the four screws.
4.9. Smart Communication Stick Connection (Optional)
Insert the smart communication stick directly into the COM port to connect to the cloud platform. Refer to the solar APP quick configuration guide for models with built-in WiFi monitoring.
5. Operating Instructions
5.1. Power ON/OFF
Once the unit is properly installed and batteries are connected, press the ON/OFF switch (located on the bottom of the case) to turn on the unit.
5.2. Operation and Display Panel
The front panel features four indicators, four function keys, and an LCD display to show operating status and power information.
5.2.1. LED Indicators
- AC Status (Green): Solid On (mains normal), Flashing (mains normal, not in operation), Off (mains abnormal).
- Invert Indicator (Yellow): Solid On (output from battery/PV), Off (other states).
- Charging Indicator (Yellow): Solid On (float charging), Flashing (constant voltage charging), Off (other states).
- Fault Indicator (Red): Solid On (fault occurs), Flashing (warning condition), Off (working properly).
5.2.2. Function Buttons
- ESC: Exit setting mode.
- UP: Go to previous selection.
- DOWN: Go to next selection.
- ENTER: Confirm selection or enter setting mode.
5.2.3. LCD Display Icons
The LCD displays various icons for AC input, PV input, output, load, battery status, and other information (alarm/fault codes).

Figure 8: Overview of LCD Display Icons.
5.3. LCD Settings
To enter setting mode, press and hold the ENTER button for 2 seconds. Use UP/DOWN to navigate, ENTER to confirm, and ESC to exit.
Key settings include:
- Output Voltage/Frequency: Adjust AC output parameters.
- Output Source Priority: Set preference for Solar, Grid, or Battery (PBG).
- Output Mode: Select mode for Appliance (APP), UPS, or Generator (GEN).
- Charger Source Priority: Prioritize PV and Grid (PNG), Only PV (OPV), Grid (GRD), or PV.
- Grid Charging Current: Set the maximum current for grid charging.
- Battery Type: Select battery chemistry (AGM, Flooded, Ternary Lithium, Lithium Iron, User-Defined).
- Battery Voltage Points: Configure return to mains, shutdown, constant voltage, float charge, and low voltage thresholds.
- Battery Equalization Settings: Enable and configure equalization parameters.
- BMS Communication: Configure protocol for battery management system.
5.4. Display Information
Pressing UP or DOWN cycles through various display screens showing information such as AC input voltage/frequency, battery voltage/current, PV voltage/power, output voltage/power, and firmware version. For systems with BMS, additional battery status information is displayed.
6. Maintenance
To ensure optimal performance and longevity of your ECGSOLAX Hybrid Solar Inverter, regular maintenance is recommended:
- Cleaning: Periodically clean the exterior of the inverter with a dry, soft cloth. Ensure the unit is powered off and disconnected from all power sources before cleaning.
- Ventilation: Ensure that the inverter's ventilation openings are clear of dust and debris to allow for proper airflow and heat dissipation. Check the dust filter regularly and clean it if it appears dirty.
- Connections: Periodically check all electrical connections (AC, DC, PV, Battery) for tightness and signs of corrosion. Tighten any loose connections.
- Environment: Ensure the inverter is operating within its specified ambient temperature range and is not exposed to direct sunlight or excessive moisture.
7. Troubleshooting
This section provides guidance on identifying and resolving common issues indicated by fault codes, alarm codes, or general system behavior.
7.1. Fault Reference Codes
When a fault occurs, the fault indicator will be solid red, and the buzzer will sound intermittently. The system may attempt to restart. If the fault persists after multiple restarts, the inverter will remain in fault status. Power off the unit completely or wait 30 minutes before restarting.
Common Fault Codes:
- Fault Code 2 (Bus voltage high): Check PV string voltage (must not exceed 500VDC). If in parallel operation, ensure output voltage settings are consistent.
- Fault Code 3 (Bus voltage low): Disconnect load, restart. If it recovers, reduce impact loads.
- Fault Code 5 (Over temperature): Check fan rotation, clean dust filter, ensure ambient temperature is below 45°C, and verify 30cm clearance around the unit.
- Fault Code 8 (Bus short circuit): Disconnect load, restart. If it recovers, reduce impact loads.
- Fault Code 10 (INV over voltage) / 11 (INV under voltage): In battery mode, inverter voltage is outside set limits.
- Fault Code 14 (Over load): Load exceeds specified limits. Reduce load.
- Fault Code 26 (BMS fault): Check BMS communication cable connection and battery background controller information.
7.2. Alarm Reference Codes
When an alarm occurs, the LED red light will flash, and the LCD will display the alarm code. The inverter does not enter fault mode.
Common Alarm Codes:
- Alarm Code 50 (Battery open): Battery voltage is below set point.
- Alarm Code 51 (Battery low voltage shutdown): Battery voltage is below set point.
- Alarm Code 55 (Battery over charge): Battery voltage is higher than set value.
- Alarm Code 56 (BMS loss): BMS communication failed. Check communication cable, battery dial switch settings, and protocol matching.
- Alarm Code 58 (Fan error): No fan speed signal detected.
- Alarm Code 60 (Overload): Load exceeds 102%. Reduce load.
- Alarm Code 68 (SOC Under): Lithium battery SOC is lower than set value.
8. Battery Equalization
The equalization function helps reverse negative chemical effects like stratification and removes sulfate crystals from battery plates, which can reduce overall battery capacity. It is recommended to equalize lead-acid batteries periodically. Note: Do not activate this mode when using lithium batteries.
8.1. How to Apply Equalization
Enable battery equalization in LCD setting Program 29. Then configure the following:
- Equalization voltage point (Program 30)
- Equalization charging time (Program 31)
- Equalization delay time (Program 32)
- Equalization interval time (Program 33)
- Immediate equalization mode activation (Program 34)
8.2. When to Equalize
In the float stage, when the set equalization interval is reached or equalization is activated immediately, the controller will enter the Equalize stage.

Figure 9: Equalization Voltage Profile (Bulk, Absorption, Float, Equalize).
8.3. Equalize Charging Time and Timeout
During equalization, the controller charges the battery until it reaches the equalization voltage. Constant-voltage regulation maintains this voltage. The battery remains in the Equalize stage until the set time. If the voltage isn't reached by timeout, the charge controller extends the time until it is achieved. If voltage is still low after extended timeout, equalization stops, and it returns to float stage.

Figure 10: Equalize Charging Time and Timeout Profile.
9. User Tips
- Regularly check all cable connections for tightness to prevent power loss or overheating.
- Keep the inverter's ventilation areas clear to ensure efficient cooling and prevent thermal shutdowns.
- Monitor your battery's state of charge and health through the LCD display to optimize its lifespan.
- For optimal performance, ensure your PV array is clean and free from obstructions.
10. Warranty and Support
For warranty information, technical support, or service inquiries, please contact your authorized ECGSOLAX dealer or the manufacturer directly. Please retain your purchase receipt as proof of purchase for any warranty claims.