1. Product Overview
This product is the FHM3-100E Series 2P/4P Dual Power Automatic Transfer Switch. It is a dedicated, purely mechanical switching device designed for the reliable manual transfer between two single-phase power sources (the Normal source "N" and the Reserve source "R"), ensuring continuous power supply to the load. The switch incorporates a reliable mechanical interlock mechanism that strictly prevents the simultaneous connection of both power sources.
Key Features:
- Model: FHM3-100E
- Number of Poles: 2P or 4P (depending on model)
- Core Functions: Manual transfer between two power sources, mechanical interlock protection.
- Operation Mode: Manual operation (via an external operating handle).
- Typical Applications: Communication equipment, security systems, small medical instruments, lighting circuits, and other critical single-phase loads requiring power backup.
Video: Unboxing and overview of the TNCE FHM3-100E Series Dual Power Automatic Transfer Switch, showcasing both 2P and 4P models.
2. Important Safety Warnings
Incorrect installation and operation may cause severe electric shock, equipment damage, fire, or even personal injury.
Safety Information:
- Professional Installation: The installation, wiring, and maintenance of this product MUST be performed by a qualified electrician.
- Strictly No Live Work: Before performing any installation, wiring, or transfer operation, you MUST ensure that BOTH incoming power sources upstream of the switch are completely disconnected, and verify that all terminals are de-energized using appropriate voltage testers. A warning sign such as "Do Not Close, Men at Work" should be posted at the worksite.
Safe Operation Principles:
- During operation, ensure the switch is securely in one of the three stable positions: "Normal Source ON", "OFF", or "Reserve Source ON".
- It is strictly forbidden to force operation or bypass the mechanical interlock when both incoming power sources are live.
- Usage Environment: Install in a clean, dry, and well-ventilated indoor distribution cabinet.
3. Technical Specifications
| Item | Parameter | Notes |
|---|---|---|
| Model | FHM3-100E | |
| Rated Operational Voltage (Ue) | AC 230V / 110V | Single-Phase |
| Rated Insulation Voltage (Ui) | AC 500V / 690V AC | |
| Rated Current (Ie) | 63A, 100A, 125A | Refer to the product nameplate |
| Rated Frequency | 50/60 Hz | |
| Number of Poles | 2P or 4P | |
| Operation Mode | Manual (External handle operation) | No motorized mechanism or display |
| Mechanical Interlock | Enforced Mechanical Interlock | Prevents paralleling of two sources |
| Protection Degree | IP20 | When installed inside an enclosure |
| Is Smart Device | No | |
| Certification | CE, RoHS | |
| Input Power | City Power |
Dimensions:
Image: Dimensional drawing for FHM3-100E/2P (107mm x 96mm x 76mm) and FHM3-100E/4P (142mm x 96mm x 76mm).
4. Unpacking and Inspection
After unpacking, please check that the main product body, operating handle, mounting screws, and this manual are complete.
Inspect the product for any visible damage caused during transportation. Manually operate the handle to feel the transition between the three positions ("Normal Source ON" - "OFF" - "Reserve Source ON"), ensuring it is smooth, distinct, and without sticking.
5. Setup (Installation and Wiring Guide)
(To be performed by a qualified electrician)
Step 1: Mechanical Installation
- Drill holes on the mounting plate of the distribution cabinet according to the switch's mounting hole spacing.
- Mount the switch body vertically and securely.
- Test the operation with the handle to ensure the mechanism moves flexibly and positions correctly.
Image: Illustration of the switch mounted on a 35mm standard guide rail.
Step 2: Electrical Wiring (CRITICAL! Power MUST be OFF before proceeding!)
Confirm all power sources are completely disconnected and verify de-energization.
Incoming Connection:
- Connect the Line (L) and Neutral (N) wires of the Normal Power Source (N) to the upper terminals on the "N" side of the switch body.
- Connect the Line (L) and Neutral (N) wires of the Reserve Power Source (R) to the upper terminals on the "R" side of the switch body.
Outgoing Connection:
- Connect the cables from the Load side to the lower output terminals of the switch.
Check all connections to ensure they are secure and correct, and clean the work area.
Wiring Diagram (2P Model - City Power to Generator):
The 2P model features connections for a common power input (e.g., City Power) and a backup power input (e.g., Generator). Common control lines connect to the control terminals. The load output is connected to the lower terminals, and a backup control line is also present.
Wiring Diagram (4P Model - City Power to Generator):
The 4P model includes four terminals for common power input (R, S, T, N) and four for backup power input. Similar to the 2P model, common control lines connect to the control terminals, and the load output is connected to the lower terminals, with a backup control line.
6. Operating Instructions
Manual Transfer Procedure:
Transferring from Normal Source to Reserve Source:
- Turn OFF the upstream circuit breaker on the Normal source side.
- Move the operating handle from the "Normal Source ON" position, through the "OFF" position, to the "Reserve Source ON" position. You should feel a definite detent at each position.
- Turn ON the upstream circuit breaker on the Reserve source side. The load is now powered by the reserve source.
Transferring back from Reserve Source to Normal Source:
- Turn OFF the upstream circuit breaker on the Reserve source side.
- Move the operating handle from the "Reserve Source ON" position, through the "OFF" position, back to the "Normal Source ON" position.
- Turn ON the upstream circuit breaker on the Normal source side. The load is now restored to power from the normal source.
Image: The manual handle and manual/automatic switch for operation.
Image: Automatic switching function, highlighting a power failure transfer time of less than 8ms.
7. Troubleshooting
| Symptom | Possible Cause | Professional Recommendation |
|---|---|---|
| Handle cannot be operated or is stuck |
|
|
| Load has no power after switching |
|
|
| Abnormal sparking or noise during operation |
|
|
8. Maintenance
Periodic Inspection (Recommended annually): A qualified electrician should inspect the tightness of connections, remove dust, and test the smoothness of manual operation with power completely off.
Warning: Any disassembly or adjustment of the switch body must be performed by trained professionals only.
Image: The flame-retardant housing ensures good insulation and safety.
9. User Tips
Based on common user experiences with similar devices, consider the following tips:
- Always ensure a clear understanding of your power sources (Normal and Reserve) before installation and operation. Labeling your circuits clearly can prevent confusion.
- Regularly check the physical condition of the switch and connections for any signs of wear or damage, especially in environments with high dust or humidity.
- If you experience frequent power outages, familiarize yourself with the manual transfer procedure to ensure quick and safe switching when needed.
10. Compliance Declaration
This product is designed and manufactured in accordance with the EU Low Voltage Directive LVD Directive 2014/35/EU and its harmonized standards, meeting its essential safety requirements. Referenced harmonized standards include but are not limited to EN 60947-1, EN 60947-3, etc.
CE RoHS Compliant
11. Warranty and Support
For detailed warranty information, technical support, or service inquiries, please refer to the official product documentation or contact TNCE customer service.
A comprehensive user manual in PDF format is available for download: View User Manual (PDF)