PowMr POW-SunSmart LVM12K

Contents

PowMr POW-SunSmart LVM12K Hybrid Solar Inverter User Manual

Model: POW-SunSmart LVM12K

Brand: PowMr

1. Important Safety Instructions

Warning: It is essential to read, understand, and adhere to all safety instructions provided in this document. Failure to comply with safety regulations may result in property damage or personal injury.

Basic Guidelines

  • Before using the equipment, carefully review all relevant sections of the device, battery, and instruction manual for all guidance and warning signs.
  • Caution: To reduce the risk of injury, if you choose to use lead-acid batteries, please charge only deep cycle lead-acid batteries. Other types of lead-acid batteries may rupture, causing personal injury.
  • This product does not contain user-serviceable parts. Do not disassemble the equipment. When maintenance or cleaning is required, take it to a qualified service center. Improper reassembly may pose risks of short-circuiting and fire. If any panel displays a malfunction, do not remove the front panel or operate the product. All operating procedures must be performed by trained professionals.
  • To reduce the risk of electric shock, disconnect all wiring before performing any maintenance and cleaning. Switching off the main unit alone does not eliminate the risk of electric shock.
  • Caution: Only qualified personnel should assemble the equipment with the battery.
  • Charging frozen batteries is prohibited.
  • Exercise extreme caution when using metal tools or placing them around the battery. Dropping tools can generate sparks or cause unpredictable risks such as short-circuiting the battery or other electronic components, potentially leading to explosions.
  • When disconnecting AC or DC terminals, strictly follow the installation steps as outlined in the instruction manual's installation section.
  • Before using this product, read the provided instructions to familiarize yourself with safety features and operating instructions. This product is designed and tested according to international standards. The equipment must be used exclusively for its intended purpose.

Installation Safety

  • Do not use this product in areas where there is a risk of gas or dust explosions.
  • Consult with the battery manufacturer's relevant literature to ascertain the compatibility of this product with the battery. Always adhere to the safety instructions provided by the battery manufacturer.
  • This is a safety-class product equipped with a protective grounding terminal. Continuous protective grounding must be provided by the AC input/output terminals.
  • Grounding Instructions: The inverter/charger should be connected to a permanent grounding wire system to ensure full compliance with local requirements and regulations for installing the inverter. When grounding protection may have been compromised, the product must be shut down to prevent accidental electric shock.
  • To ensure optimal operation of the inverter/charger, adhere to the required specifications and select appropriate cable sizes, which are crucial for the correct operation of the inverter/charger.
  • Before connecting to the mains power, ensure that the available power supply meets the parameters specified in the product manual.
  • Do not short-circuit the AC output and DC input. Do not connect the mains power when the DC output is short-circuited.
  • Ensure that the equipment is used in conditions compliant with standards. Do not operate the product in moist or dusty environments. Ensure there is sufficient clearance space around the product and check that ventilation holes are not blocked.
  • Ensure that the required system voltage does not exceed the capacity of the product.

Transportation and Storage

  • Ensure that the power and battery cables are disconnected before storing or transporting the product.
  • If the equipment is not in its original packaging during transportation, any transport damage is not the responsibility of the manufacturer.
  • Store the product in a dry environment, with storage temperature between -25°C to 60°C.
  • Refer to the battery manufacturer's manual for information on battery transportation, storage, charging, recharging, and disposal.

Please follow these instructions diligently to ensure safe installation, operation, transportation, and storage of the product.

2. Product Overview

The POW-SunSmart series is a new type of solar energy storage inverter. It integrates solar charging, utility charging and energy storage with AC sine wave output. It adopts DSP control and utilizes advanced algorithms to deliver fast response, high reliability, and industrial-grade performance. This series is ideal for demanding industrial applications.

2.1 Features

  • Supports lead acid battery and li-ion battery connections.
  • With a dual activation function when the li-ion battery is dormant; either mains/photovoltaic power supply access can trigger the activation of the li-ion battery.
  • Support single-phase pure sine wave output.
  • Supports six different voltage levels of 100/105/110/115/120/127Vac per phase.
  • Supports two solar inputs and simultaneous tracking of two solar maximum power charging/loading capacity functions.
  • Dual MPPT with 99.9% efficiency and maximum 25A current in a single circuit, perfectly adapted to high power modules.
  • 2 charging modes are available: solar only, grid/solar hybrid charging.
  • With the time-slot charging and discharging setting function, you can set the time period for cutting in/out of mains charging and switch the time period between battery discharging and mains bypass power supply mode.
  • Energy saving mode function to reduce no-load energy losses.
  • With two output modes of utility bypass and inverter output, with uninterrupted power supply function.
  • LCD large screen dynamic flow diagram design, easy to understand the system data and operation status.
  • 360° protection with complete short circuit protection, over current protection, over under voltage protection, overload protection, backfill protection, etc.
  • Support CAN, USB, and RS485 communication.

2.2 System Connection Diagram

The diagram below shows the system application scenario of this product. A complete system consists of the following components:

  1. PV modules: converts light energy into DC energy, which can be used to charge the battery via an inverter or directly inverted into AC power to supply the load.
  2. Utility grid or generator: connected to the AC input, it can supply the load and charge the battery at the same time. The system can also operate generally without the mains or generator when the battery and the PV module power the load.
  3. Battery: The role of the battery is to ensure the regular power supply of the system load when the solar energy is insufficient and there is no mains power.
  4. Home load: Various household and office loads can be connected, including refrigerators, lamps, televisions, fans, air conditioners, and other AC loads.
  5. Inverter: The energy conversion device of the whole system.

The actual application scenario determines the specific system wiring method.

PowMr 12KW Hybrid Solar Inverter with key specifications and US Stock label
Figure 2.2.1: PowMr 12KW Hybrid Solar Inverter showing 120V/240V AC output, 200A MPPT solar charging, 48V DC battery voltage, Max PV 550Vdc, Parallel up to 6 units, and Dual MPPT. This image also indicates US Stock availability.

2.3 Production Overview

Internal view of the PowMr Hybrid Solar Inverter with terminal cover open, showing circuit board, breakers, and wiring connections.
Figure 2.3.1: Internal view of the PowMr Hybrid Solar Inverter with the terminal cover open, revealing the circuit board, various breakers, and wiring connections for battery, grid, load, and PV inputs.

The inverter features various terminals and indicators for comprehensive system management:

No.ItemNo.Item
1LED Indicators14Load Ground Terminal
2LCD Screen15Grid Input Ground Terminal
3Touchable Keys16Transmitter-PLC
4WIFI Port17AFCI
5RS485 Port18Parallel Port A
6External CT Port19Parallel Port B
7CAN Port20Dry Contact
8PV1 Terminals21USB-B Port
9PV2 Terminals22Battery Terminal
10Utility Terminals (L1+L2+N)+Breaker23Battery Circuit Breaker
11Load Terminals (L1+L2+N)+Breaker24PV Circuit Breaker
12Generator Terminals (L1+L2+N)+Breaker25ON/OFF Switch
13Generator Ground Terminal26USB-A Port

2.4 Dimension Drawing

Side view of the PowMr Hybrid Solar Inverter
Figure 2.4.1: Side view of the PowMr Hybrid Solar Inverter, illustrating its compact design.
Top-down view of the PowMr Hybrid Solar Inverter showing cooling fans and PV switch
Figure 2.4.2: Top-down view of the PowMr Hybrid Solar Inverter, highlighting the cooling fans and the PV switch for solar input control.
Bottom view of the PowMr Hybrid Solar Inverter with labeled connection ports
Figure 2.4.3: Bottom view of the PowMr Hybrid Solar Inverter, clearly labeling the connection ports for Battery, COM1, COM2, PV1, GRID, LOAD, and GEN.
Another side view of the PowMr Hybrid Solar Inverter, emphasizing the cooling system
Figure 2.4.4: An additional side view of the PowMr Hybrid Solar Inverter, providing a different perspective of its design and cooling features.

3. Installation

3.1 Select the Mount Location

POW-SunSmart series can be used outdoors (protection class IP65). Please consider the followings before selecting the location:

  • Choose a solid wall to install the inverter.
  • Mount the inverter at eye level.
  • Adequate heat dissipation space must be provided for the inverter.
  • Installation location should be a cool and ventilated place, under a photovoltaic panel or under the eaves, to avoid direct sunlight exposure.
  • The ambient temperature should be kept between -25°C and 60°C (-13°F and 140°F) to ensure optimal operation.

DANGER

  • Do not install the inverter where highly flammable materials are nearby.
  • Do not install the inverter in potential explosive areas.
  • Do not install the inverter with lead-acid batteries in a confined space.

CAUTION

  • Do not install the inverter in direct sunlight.

3.2 Mount the Inverter

Drill four mounting holes in the wall with an electric drill according to the specified dimensions. Then insert four M8*60 expansion bolts into the holes.

3.3 Remove the Terminal Cover & Anti Insect Net

Using a screwdriver, remove the fan shroud and open the cover.

NOTICE

  • When using the device in areas with poor air quality, the fan cover is easily blocked by air particles. Please disassemble and clean the fan regularly to avoid affecting the inverter's internal air flow rate, which may trigger the device over-temperature protection fault (19/20 faults) affecting the power supply and the service life of the inverter.

4. Connection

4.1 Split-Phase Mode

The inverter supports split-phase output, providing 120V (L-N) and 240V (L1-L2) AC output. The default L-N voltage is 120Vac, and the default L1-L2 voltage is 240Vac.

4.2 Cable & Circuit Breaker Requirement

PV Input

ModelCable DiameterMax. PV Input CurrentCircuit Breaker Spec
8KW Model6mm²/10AWG25A2P-25A
10KW Model6mm²/10AWG25A2P-25A
12KW Model6mm²/10AWG25A2P-25A

Battery

ModelCable DiameterMax. Battery CurrentCircuit Breaker Spec
8KW Model53mm²/0AWG200A2P-250A
10KW Model67mm²/00AWG230A2P-250A
12KW Model67mm²/00AWG270A2P-250A

AC Input

ModelCable DiameterCircuit Breaker Spec
8KW Model13mm²/6AWG (L1/L2/N)3P-63A
10KW Model13mm²/6AWG (L1/L2/N)3P-63A
12KW Model13mm²/6AWG (L1/L2/N)3P-63A

Generator Input

ModelCable DiameterCircuit Breaker Spec
8KW Model13mm²/6AWG (L1/L2/N)3P-63A
10KW Model13mm²/6AWG (L1/L2/N)3P-63A
12KW Model13mm²/6AWG (L1/L2/N)3P-63A

AC Output

ModelCable DiameterCircuit Breaker Spec
8KW Model13mm²/6AWG (L1/L2/N)3P-63A
10KW Model13mm²/6AWG (L1/L2/N)3P-63A
12KW Model13mm²/6AWG (L1/L2/N)3P-63A

NOTICE

The wire diameter is for reference only. If the distance between the PV array and the inverter or between the inverter and the battery is long, using a thicker wire will reduce the voltage drop and improve the performance of the system.

4.3 GRID & LOAD & GEN Connection

Connect the live, neutral and ground wires according to the cables' position and order shown in the diagram below.

4.4 Battery Connection

Connect the positive and negative cable of the battery according to the diagram below.

DANGER

  • Before connecting battery, the circuit breaker must be opened to avoid the risk of electric shock and must not be operated with electricity.
  • Make sure that the positive and negative terminals of the battery are connected correctly and not reversed, otherwise the inverter may be damaged.
  • Please check that the cable used is sufficient for the requirements, too thin, poor quality cables are a serious safety hazard.

4.5 PV Connection

Connect the positive and negative wires of both PVs in the cable locations and sequence shown in the diagram below. The positive wire runs through the AFCI unit.

Video 4.5.1: PV Wiring Guide for the POW-SunSmart LVM12K Hybrid Solar Inverter. This video demonstrates how to correctly wire the PV inputs, emphasizing the distinction between positive and negative poles and the proper routing of the positive wire through the AFCI for intelligent arc-fault protection. It also shows how two strings from the same solar array can be connected in parallel at the inverter side, supporting dual MPPT inputs.

DANGER

  • Before connecting PV, the circuit breaker must be opened to avoid the risk of electric shock and must not be operated with electricity.
  • Please make sure that the open circuit voltage of the PV modules in series does not exceed the maximum open-circuit voltage of the inverter (the value is 550V), otherwise the inverter may be damaged.

Transmitter-PLC Device

The APsmart Rapid Shutdown System Transmitter-PLC is part of a rapid shutdown solution when paired with APsmart RSD-D, a PV module rapid shutdown unit. While powered on, the Transmitter-PLC sends a signal to the RSD-D units to keep their PV modules connected and supplying energy. RSD-D units automatically enter rapid shutdown mode when the Transmitter-PLC is switched off and resume energy production when power is restored to the Transmitter-PLC.

4.6 Dry Contact Connection

Use a small screwdriver to push back the direction indicated by the arrow, then insert the communication cable into the dry contact port. (Communication cable diameter 0.2~1.5mm²)

Dry contact port with 3 functions:

  1. RSD power supply
  2. Temperature sampling (reserved)
  3. Generator remote start/stop

4.7 Grounding Connection

Please make sure the grounding terminal connects to the Grounding Busbar.

NOTICE

  • The grounding cable should have a diameter of not less than 4mm² and be as close as possible to the grounding point.

4.8 Inverter Start

After ensuring that the wiring is reliable and the wire sequence is correct, follow the power-on sequence below to start the inverter safely:

  1. Close the circuit breaker of the battery.
  2. Press the rocker switch on the bottom of inverter, the screen and indicators light up to indicate that the inverter has been activated.
  3. Sequential close of the circuit breakers for PV, AC input and AC output.
  4. Install the terminal protection cover in place.
  5. Start the loads one by one in order of power from small to large.

5. Operation

5.1 Operation and Display Panel

The operation and display panel includes 1 LCD screen, 3 indicators, and 4 touchable keys.

Touchable KeysDescription
Enter/exit the setting menu
Go to the next selection
Go to the previous selection
Confirm/Enter the selection in setting menu
IndicatorsColorDescription
AC/INVYellowSteady on: The grid output with load
Flash: The inverter output with load
CHARGEGreenSteady on: Charging is complete
Flash: Charging is underway
FAULTRedFlash: An alarm or fault event occurred

5.2 Display Panel

The display panel provides real-time information through various icons:

IconDescriptionIconDescription
Solar panelLoad
BatteryGrid or Generator
HomeHome page buttonINVERTERInverter is working
HistoryHistory dataSettingSetting
0:0:0Local timeThe buzzer On/Off
Indicators that machine is currently in energy-saving mode.The energy direction
UPSUPS load (connected to inverter load port)HOMEHome load (connected to grid port)

5.3 View Real-Time Data

On the LCD home screen, click the inverter icon, battery icon, mains icon, load icon and photovoltaic icon to view the real-time data of the machine.

System Data

NO.ItemNO.Item
1Machine state11SN code
2MCU1 version12Minor version
3LCD version13Rated power
4MCU2 version14RS485 Address
5Customer ID15External Temperature
6Inverter Temperature16PV Temperature
7Transformer temperature17L1 Voltage
8L1 Current18L2 Voltage
9L2 Current19Positive busbar voltage
10Negative busbar voltage20Total busbar voltage

Battery Data

NO.ItemNO.Item
1SOH6Discharge current
2SOC (Percentage of remaining battery capacity)7BMS protocol
3Battery voltage8Battery type
4Charge current9Battery Charge Status
5Battery power (Battery charging and discharging power)

Grid Data

NO.ItemNO.Item
1L1 Voltage V7L2 Voltage
2L1 Current A8L2 Current
3L1 active power9L2 active power
4L1 apparent power10L2 apparent power
5Frequency11Grid charging current
6Today's on-grid energy

Click on the history button in the menu bar below to access the historical data and view various types of historical data.

Today Data

NO.ItemNO.Item
1Battery charging energy5Grid charging energy
2Battery discharging energy6Load consumption energy from grid
3Solar generated energy7On Grid Energy
4Load consumption energy

History

NO.ItemNO.Item
1PV generation last seven days history4Mains charge energy for last 7 days
2Battery charging energy for last 7 days5Load consumption energy for last 7 days
3Battery discharge for last 7 days6Load consumption from the grid for last 7 days

Energy Statistics

NO.ItemNO.Item
1Total battery charging energy5Total battery discharging energy
2Total solar generated energy6Total load consumption energy
3Total grid charging energy7Total load consumption energy from grid
4Total on grid energy

Historical Faults

This section would display historical fault information if available.

5.4 Setting

Operating instructions: Click on the settings in the menu bar at the bottom of the screen to enter the setup interface, including the basic settings, work mode settings, battery settings, grid settings, advanced settings of the five major setup items.

5.4.1 Basic Setup - Display Setup

Parameter MeaningDescription
LanguageCurrently supported languages include English, Italian, German, Spanish, and Chinese.
RS485 AddressDisplay and current inverter RS485 address, range 1-255
Screen always onSelectable whether the screen is always on or not
BeepYou can choose whether to enable the Beep alarm
Screen brightening timeSetting range 0-60S
Backlight brightness0-100%

5.4.1 Basic Setup - Time Setup

Set the current Year, Month, Day, Hour, Minute, and Second.

5.4.1 Basic Setup - Password Setting

Password is required to access the Grid Settings and Advanced Settings. Default password is "00000". Password setting value range: 0-65535.

5.4.2 Work Mode Setup

Parameter MeaningOptionDescription
Hybrid grid modeOn gridDirect grid connection of excess PV energy.
Limit power to upsUPS load backflow prevention, photovoltaic or battery energy is only for the ups load, excess energy will not be connected to the grid.
PV energy manageLimit power to homeHome load anti-backflow, solar or battery energy is only supplied to the home load, excess energy will not be connected to the grid.
AC CouplingOn-grid inverter connect to the hybrid inverter "GEN port" or Grid side.
First to loadPV power supply logic: load-charge-grid connection
First to chargingPV power supply logic: charge-load-grid connection
First to gridPV power supply logic: load-grid connection-charge
Grid charging enableSelectable grid participation in battery charging
Battery energy manageStandbyThe battery does not discharge, and the battery is discharged only when the working state is off the grid.
Battery to ups loadWhen the PV power is less than the UPS load power, the battery discharge is added.
Battery to home loadThe battery can supply the power to Home load.
Battery to grid sellThe battery can supply the power to grid.
Parallel modeStand-aloneSingle inverter
ParallelThe grid type setting is effective when set to split-phase.
Grid typeSingle PhaseWhen the grid type is single-phase, L1-L2 is Europe voltage, L1-L2 is 230V. Note 1: Parallel operation is not supported when single-phase mode is selected. Note 2: In single-phase mode (230V), it is recommended to connect L1 to the live wire and L2 to the neutral wire for standard wiring practice.
Three PhaseWhen the grid type is three-phase, the phase difference between L1 and L2 is 120° and the output voltage is 120V/208V.
Split PhaseWhen the grid type is split-phase, the phase difference between L1 and L2 is 180°, and the grid voltage is 120V/240V. Please select according to the actual grid type.
Output phase voltageSettable: 100V,105V,110V,115,120V,127V

5.4.2 Work Mode Setup - Peak Shaving

Parameter MeaningDescription
Time charging/discharging enableSelect whether to turn on timed charging and discharging
Start/End TimeSetting the time period for timed charging and discharging
Stop SOCSetting the battery charging cut-off SOC value and the cut-off SOC value for discharging during the timed charging and discharging time period (during BMS communication)
Stop VoltSetting the battery charging cut-off voltage value and discharging cut-off voltage value during the timed charging and discharging time period (when the BMS is not communicating)
Max PowerSetting the battery charging power and discharging power during the timed charging and discharging time period

5.4.3 Battery Setup - Battery Type

Parameter MeaningOptionDescription
Battery chg. curr. limit (Valid for BMS communication)HMIMaximum battery charging current is limited according to the inverter battery charging current setting value.
BMSMaximum battery charging current is limited by the current limit value of the BMS.
InverterMaximum battery charging current is limited by the machine's derating logic.
BMS comm. interfaceDisableBMS does not communicate
RS485BMS RS485 communication function
CANBMS CAN communication function
Battery Temperature CompensationSelect whether to turn on temperature compensation
Battery TypeUSERUser customizable to set all battery parameters
SLDSealed Lead Acid Battery
FLDOpen-ended lead-acid batteries
GELGel lead-acid battery

5.4.3 Battery Setup - BMS Communication Protocol

When the BMS port selection setting item = 485 or CAN, you need to select the corresponding lithium battery manufacturer brand for communication:

  • 1:PACE-PACEEX; 2:RUDA-Ritar; 3:AOGUAN-ALLGRAND BATTERY
  • 4:OULITE-OLITER; 5:CEF-CHANGFENG TECHNOLOGY;
  • 6:XINWANGDA-SUNWODA; 7:DAQIN-DAKING; 8:WOW-SRNE
  • 9:PYL-PYLONTECH; 10:MIT-FOXESS; 11:XIX-XYE;
  • 12:POL-POWMR; 13:GUOX-Gotion; 14:SMK-SMK;
  • 15:VOL-WEILAN; 16:UZE-YUZE

5.4.3 Battery Setup - Battery Parameters

ParameterSealed lead acid battery (SLd)Gel lead acid battery (GEL)Flooded lead acid battery (FLd)User-defined (USER)
Overdisconnect Voltage60V60V60V60V
Boost charging voltage57.6V56.8V57.6V40~60V (can be set)
Undervoltage alarm voltage44V44V44V40~60V (can be set)
Undervoltage disconnect voltage42V42V42V40~60V (can be set)
Discharge limiting voltage40V40V40V40~60V (can be set)
Overdischarge delay time5s5s5s1~30s (can be set)
Enhanced Charge Cycle120min120min120min10~900min (can be set)

5.4.3 Battery Setup - Li-ion Battery Parameters

ParameterTernaryLFPUser-defined (USER)
N13N14L16L15L14
Overdisconnect Voltage60V60V60V60V60V60V
Boost charging voltage53.2V57.6V56.8V53.2V49.2V40~60V (can be set)
Undervoltage alarm voltage43.6V46.8V49.6V46.4V43.2V40~60V (can be set)
Undervoltage disconnect voltage38.8V42V48.8V45.6V42V40~60V (can be set)
Discharge limiting voltage36.4V39.2V46.4V43.6V40.8V40~60V (can be set)
Overdischarge delay time30s30s30s30s30s1~30s (can be set)
Enhanced Charge Cycle120min (can be set)120min (can be set)120min (can be set)120min (can be set)120min (can be set)10~900min (can be set)

5.4.4 On Grid Setup

To enter this setting, you need to enter the password set by the user, the default password is "00000".

Parameter MeaningDescription
Grid StandardAmerica: UL1741&IEEE1547.1-2020, California: RULE21, Hawaii: HECO, Puerto Rico, Columbia: UL1741, Other regions: GNL, Not Initialized
Grid FrequencySelection of local grid frequency, 50Hz/60Hz
CT ratioWhen connecting an external CT, enter the ratio on the CT specification
Sell power MaxOn grid power
Buy power MaxMaximum power drawn from the grid. If the grid charging power + load power exceeds this setting, the machine reduces the charging power. (Setting range: 0 to rated power)
Zero-export powerError calibration power in the case of backflow prevention, recommended setting 20-100W.
On-Grid Reactive PowerSetting range 0-100%, % of reactive power
Reactive power over/under excitedOver indicates 0%-100% / Under indicates -100%-0%
On Grid PFSetting range 0.8-1
Power factor over/under excitedOver indicates 0.8-1 / Under indicates -0.8--1
Parameter MeaningDescription
Enter service enableGrid-connect enable setting (on by default)
Connect Voltage LowGrid-connected low voltage protection voltage
Connect Frequency LowGrid-connected low-frequency protection points
Connect Voltage HighGrid-connected high-voltage protection voltage
Connect Frequency HighGrid-connected high-frequency protection points
Normal connect delay timeGrid normal connection, grid connection delay time
Normal Connect Power Ramp RateNormal grid connection, rate of rise of grid-connected power
Reconnect delay timeGrid down reconnection, grid connection delay time
Reconnect Power Ramp RateGrid disconnection and reconnection, rate of rise of grid-connected power
Parameter MeaningDescription
LV1Class 1 undervoltage protection point
LF1Class 1 underfrequency protection point
LV2Class 2 undervoltage protection point
LF2Class 2 underfrequency protection point
LV3Class 3 undervoltage protection point
HV1Class 1 overvoltage protection point
HF1Class 1 overfrequency protection point
HV2Class 2 overvoltage protection point
HF2Class 2 overfrequency protection point
TimeProtection Response Time

5.4.4 On Grid Setup - Other

Parameter MeaningDescription
Frequency Droop (F-P) enableAdjustment of inverter output power according to grid frequency
Volt -Watt (V-P) curve enableAdjustment of the inverter active power according to the set grid voltage
Volt-Var (V-Q) curve enableAdjustment of the inverter reactive power according to the set grid voltage
Watt-Var (P-Q) curve enableAdjustment of the inverter reactive power according to the set active power
Watt-PF (P-PF) curve enableAdjustment of the power factor of the inverter according to the set active power
LVRT/HVRT enableAdjustment of grid HV ride-through / LV ride-through values
Reactive power percentage enableWhen this function is enabled, the inverter will adjust its reactive power according to the configured reactive power percentage.
Discharge PF enableWhen this function is enabled, the inverter will adjust its power factor during battery discharge according to the configured active power.
Charge PF enableWhen this function is enabled, the inverter will adjust its power factor during battery charging according to the configured active power.

5.4.5 Advance Setup - Generator

Parameter MeaningDescription
Max charging current by gen.Maximum battery charging current during generator charging
Generator rate powerSetting the power of the generator up to the rated power of the inverter
Generator charging enableSetting whether the generator is charged or not
Generator work modeWhen connect the Generator, select "Generator input"
When connect the Micro inverter, select "Micro inverter input"
When connect the load to the GEN port, select "smart load"
Grid always to smart load enableEnable the grid supply power to smart load

5.4.5 Advance Setup - Other

Parameter MeaningDescription
PE-N connect enableEnable automatic switching of PE-N connections
PV Riso check enableEnable PV insulation impedance detection
AFCI check enableTurn on AFCI check
Leakage curr. protection enableEnable leakage current protection
BMS comm. error stopAfter turning on, the inverter output turns off when the machine reports 58 communication faults
Power saving modeAfter turning on the energy-saving mode, if the load is empty or less than 25W, the inverter output will be shut down after a delay of 5min; when the load is more than 40W, the inverter will start automatically.
CT auto detect enableAutomatically detect the CT, the result will report to "CT manual setting"
CT manual settingAccording to the CT installation, select the CT direction
Arc fault clearClear the AFCI fault
Load typeAccording to the load that you have connected, select the load type
Inverter current limiting coefficientWhen the inverter soft start, adjust the current coefficient (This setting doesn't recommend to be changed by the customer)

5.4.5 Advance Setup - Restart Inverter

Parameter MeaningDescription
Restore to factory settingReset all inverter settings to factory setting
Restart InverterRestart the inverter

5.5 Time-Slot Charging/Discharging Function

The POW-SunSmart series is equipped with a time-slot charging and discharging function, which allows users to set different charging and discharging periods according to the local peak and valley tariffs, so that the utility power and PV energy can be used rationally.

When the utility price is expensive, the battery inverter can be used to supply power to the load; When the utility price is cheap, the utility can be used to supply and charge the load, which can maximize the user's savings in electricity costs.

The users can turn on/off the time-sharing charging/discharging function in the Setup menu parameters Segmented Charging Enable and Segmented Discharging Enable, and set the charging and discharging time periods in the parameters Timed Utility Charging Start/Stop Settings and Timed Battery Discharging Start/Stop Settings. Below is a case example to help users understand the function.

NOTICE

Before using this function for the first time, please set the local time and date, and then users can set the corresponding time slots according to the local peak and valley tariff charges.

6. Communication

6.1 Overview

No.PortNo.PortNo.Port
4WIFI port7CAN port20Dry contact
5RS485 port18Parallel port A21USB-B port
6External CT port19Parallel port B26USB-A port

6.2 USB-B Port

The user can read and modify device parameters through this port by using the host software. Please contact us for the host software installation package if you require one.

6.3 WIFI Port

The WIFI port is used to connect to the Wi-Fi/GPRS data acquisition module, which allows users to view the operating status and parameters of the inverter through the cell phone APP.

NOTICE

  • The Wi-Fi/GPRS data acquisition module needs to be purchased separately.

6.4 RS485 Port

The RS485 port is used to connect to the BMS of Li-ion battery.

6.5 CAN Port

The CAN port is used to connect to the BMS of Li-ion battery.

NOTICE

  • If you need the inverter to communicate with the lithium battery BMS, please contact us for the communication protocol or to upgrade the inverter to the corresponding software program.

6.6 External CT Port

  1. Length of CT Output Line Wrap: 4m
  2. Normally The CT direction is "to inverter"

6.7 Dry Contact

Dry contact port with 3 functions:

  1. RSD power supply
  2. Temperature sampling (reserved)
  3. Generator remote start/stop

NOTICE

  • If you need to use the remote start/stop function of the generator with dry contact, ensure that the generator has ATS and supports remote start/stop.

7. Fault and Remedy (Troubleshooting)

7.1 Fault Code

Fault codeFault nameDoes it Affect the outputsDescription
01BatVoltLowYesBattery undervoltage alarm
02BatOverCurrSwYesBattery discharge average current over-current (software protection).
03BatOpenYesBattery not-connected alarm
04BatLowEodYesBattery undervoltage stop discharging alarm
05BatOverCurrHwYesBattery overcurrent (hardware protection)
06BatOverVoltYesBattery overvoltage protection
07BusOverVoltHwYesBusbar overvoltage (hardware protection)
08BusOverVoltSwYesBusbar overvoltage (software protection)
09PvVoltHighYesPV input overvoltage protection
10PvBoostOCSWNoBoost circuit overcurrent (software protection)
11PvBoostOCHWNoBoost circuit overcurrent (hardware protection)
12HESCommErrYesMaster-slave HES communication failure
13OverloadBypassYesBypass overload protection
14OverloadInverterYesInverter overload protection
15AcOverCurrHwYesInverter over-current hardware protection
16AuxDSpReqOffPWMYesRequesting a shutdown fault from the chip
17InvShortYesInverter short-circuit protection
18BussoftfailedYesBusbar soft start failure
19OverTemperMpptNoMPPT heat sink over-temperature protection
20OverTemperInvYesInverter AC output with load or AC charging radiator over-temperature protection.
21FanFailYesFan blockage or failure fault
22EEPROMYesMemory failure
23ModelNumErrYesModel setting error
24BusdiffYesPositive and negative bus voltage imbalance
25BusShortYesBusbar short circuit
26RlyshortYesInverter AC output backfeed to bypass AC output
28LinePhaseErrYesUtility input phase fault
29BusVoltLowYesLow bus voltage protection
30BatCapacityLow1YesAlarm given when battery capacity rate is lower than 10% (setting BMS to enable validity).
31BatCapacityLow2NoAlarm given when battery capacity rate is lower than 5% (setting BMS to enable validity).
32BatCapacityLowStopYesInverter stops when battery capacity is low (setting BMS to enable validity).
34CanCommFaultYesCAN communication fault in parallel operation.
35ParaAddrErrYesParallel ID (communication address) setting error
37ParaShareCurrErrYesParallel current sharing fault
38ParaBattVoltDiffYesLarge battery voltage difference in parallel mode
39ParaAcSrcDiffYesInconsistent mains input source in parallel mode
40ParaHwSynErrYesHardware synchronization signal error in parallel mode
41InvDcVoltErrYesInverter DC voltage error
42SysFwVersionDiffYesInconsistent system firmware version in parallel mode
43ParaLineContErrYesParallel line connection error in parallel mode
44Serial number errorYesNo serial number set at factory
45Error setting of split-phase modeYesItem "Parallel" setting error
49Grid over voltageYes
50Grid under voltageYes
51Grid over FrequencyYes
52Grid under FrequencyYesSelects the local corresponding grid standard.
53Grid lossYes
54Grid DC current overYes
55Grid standard uninitializedYes
56Low insulation resistance faultNoPV1+, PV2+ and PV- abnormally low impedance to ground.
57Leakage current overload faultYesSystem leakage current exceeds limit.
58BMSComErrNoBMS communication failure
60BMSUnderTemNoBMS alarm battery low temperature.
61BMSOverTemYesBMS alarm battery over-temperature. (Effective after successful BMS communication)
62BMSOverCurYesBMS alarm battery over-current. (Effective after successful BMS communication)
63BMSUnderVoltNoBMS alarm low battery. (Effective after successful BMS communication)

7.2 Troubleshooting Table

Fault codeFaultsRemedy
DisplayNo display on the screenCheck if the battery switch or PV switch is closed; whether the switch is in the "ON" state; press any button on the screen to exit the screen sleep mode.
[06]Battery overvoltage protectionCheck that the battery voltage does not exceed the preset value. If it does, discharge the battery until the voltage falls below the battery over-voltage recovery point.
[01] [04]Battery undervoltage protectionCharge the battery until it returns to the low voltage disconnection recovery voltage.
[21]Fan failureCheck if the fan is not turning or blocked by foreign object.
[19] [20]Heat sink over temperature protectionWhen the temperature of the device is cooled below the recovery temperature, normal charge and discharge control is resumed.
[13] [14]Bypass overload protection, inverter overload protection1. Reduce the use of power equipment.
2. Restart the unit to resume load output.
[17]Inverter short-circuit protection1. Check the load connection carefully and clear the short-circuit fault points.
2. Re-power up to resume load output.
[09]PV overvoltageUse a multimeter to check if the PV input voltage exceeds the maximum allowable input voltage rated.
[03]Battery disconnected alarmCheck if the battery is not connected or if the battery circuit breaker is not closed.
[40] [43]Parallel connection faultCheck if the parallel line is not connected well, such as loose or wrong connection.
[35]Parallel ID setting errorCheck whether the setting of parallel ID number is repeated.
[37]Parallel current sharing faultCheck if the parallel current sharing line is not connected well, such as loose or wrong connection.
[39]Inconsistent AC input source in parallel modeCheck whether the parallel AC inputs are from the same input interface.
[42]Inconsistent system firmware version in parallel modeCheck whether the software version of each inverter is consistent.
[44]Serial number errorIncorrect device serial number setting.
[45]Parallel mode errorThere is a device in the parallel system with the wrong parallel mode setting.
[49]High grid voltageCheck that the grid voltage is within the normal range, if the grid voltage is abnormal, wait until the grid voltage is restored.
[50]Low grid voltageCheck that the grid voltage is within the normal range, if the grid voltage is abnormal, wait until the grid voltage is restored.
[51]High grid frequencyCheck that the grid frequency is within the normal range, if the grid frequency is abnormal, wait until the grid frequency is restored.
[52]Low grid frequencyCheck that the grid frequency is within the normal range, if the grid frequency is abnormal, wait until the grid frequency is restored.
[53]Grid unconnectedCheck if the grid is correctly connected, e.g. if the switch is closed and if the grid is disconnected.
[54]Grid-connected current with DC component overPower down and restart the device, if it continues to report faults, contact the manufacturer after sales.
[55]Grid standard not setSetting standards for grid integration
[56]Low insulation resistance faultCheck that the system is well grounded and that the PV modules and cables are not worn
[57]Leakage current overload faultCheck that the system is well grounded and that the loads are not operating abnormally.
58BMSComErrNoBMS communication failure
60BMSUnderTemNoBMS alarm battery low temperature.
61BMSOverTemYesBMS alarm battery over-temperature. (Effective after successful BMS communication)
62BMSOverCurYesBMS alarm battery over-current. (Effective after successful BMS communication)
63BMSUnderVoltNoBMS alarm low battery. (Effective after successful BMS communication)

NOTICE

  • If you encounter a fault with the product that cannot be solved by the methods in the table above, please contact our after-sales service for technical support and do not disassemble the equipment yourself.

8. Protection and Maintenance

8.1 Protection Features

No.Protection FeatureInstruction
1PV current-limiting protectionWhen the charge current or power of the configured PV array exceeds the rated current and power of the inverter, it will charge at the rated current and power.
2PV input over-voltageIf the PV voltage exceeds the maximum value allowed by the hardware, the machine will report a fault and stop the PV boost to output a sinusoidal AC wave.
3PV night reverse current protectionAt night, the battery is prevented from discharging through the PV module because the battery voltage is greater than the voltage of PV module.
4Utility input overvoltage protectionWhen the mains voltage exceeds 140Vac, the mains charging will be stopped and the output will be inverted.
5AC input under-voltage protectionWhen the mains voltage falls below 90Vac, the mains charging will be stopped and the output will be inverted.
6Battery over-voltage protectionWhen the battery voltage reaches the over-voltage cut-off point, the PV and the utility will automatically stop charging to prevent the battery from being overcharged and damaged.
7Battery under-voltage protectionWhen the battery voltage reaches the under-voltage cut-off point, the inverter will automatically stop the battery discharge to prevent damage from over-discharging the battery.
8Battery over-current protectionAfter a period when the battery current exceeds that allowed by the hardware, the machine will switch off the output and stop discharging the battery.
9AC output short-circuit protectionWhen a short-circuit fault occurs at the load output for more than 200ms, the output AC voltage will be turned off
10Heat sink over-temperature protectionWhen the internal temperature of the inverter is too high, the inverter will stop charging and discharging; when the temperature returns to normal, the inverter will resume charging and discharging.
11Inverter over-load protectionAfter triggering the overload protection the inverter will resume output after 3 minutes, 5 consecutive overloads will switch off the output until the inverter is restarted.
12AC output reversePrevents AC back flow from the battery inverter to the bypass AC input.
13Bypass over-current protectionBuilt-in AC input over-current protection circuit breaker.
14Bypass phase inconsistency protectionWhen the phase of the bypass input and the phase of the inverter split do not match, the inverter disables switching to the bypass output to prevent the load from dropping out or short-circuiting when switching to the bypass.

8.2 Maintenance

To maintain optimum and long-lasting working performance, we recommend that the following items are checked twice a year:

  1. Ensure that the airflow around the inverter is not blocked and remove any dirt or debris from the radiator.
  2. Check that all exposed conductors are not damaged by sunlight, friction with other surrounding objects, dry rot, insect or rodent damage, etc. The conductors need to be repaired or replaced if necessary.
  3. Verify that the indications and displays are consistent with the operation of the equipment, note any faults or incorrect displays and take corrective action if necessary.
  4. Check all terminals for signs of corrosion, insulation damage, high temperatures or burning/discoloration and tighten terminal screws.
  5. Check for dirt, nesting insects and corrosion, clean as required, Clean the insect screen regularly.
  6. If the lightning arrester has failed, replace the failed arrester in time to prevent lightning damage to the inverter or other equipment of the user.

DANGER

  • Before conducting any inspection or operation, please ensure the inverter is disconnected from all power sources and that the capacitor is fully discharged to avoid the risk of electric shock.

Our company will not be held responsible for damage due to the following reasons:

  1. Damage caused by improper use or use in the wrong location.
  2. Photovoltaic modules with an open circuit voltage exceeding the maximum permissible voltage.
  3. Damage caused by the operating temperature exceeding the restricted operating temperature range.
  4. Dismantling and repair of the inverter by unauthorized persons.
  5. Damage caused by force majeure: damage during transport or handling of the inverter.

9. Specifications (Parameter Table)

ModelPOW-SunSmart LVM8KPOW-SunSmart LVM10KPOW-SunSmart LVM12KSettable

Inverter Output

Rated Output Power8800W10000W@240V 12000W
@208V 10400W
Max. Peak Power2 times rated power
Rated Output Voltage120/240Vac (Split-phase); 120/208V (Three-phase)√
Output Voltage Error@240V 36.6A
@208V 42.3A
@240V 41.7A
@208V 48.1A
50A
Load Capacity of Motors5HP6HP6HP√
Rated AC Frequency50/60Hz√
WaveformPure Sine Wave
Parallel Capacity6

Battery

Battery TypeLi-ion / Lead-Acid / User Defined√
Rated Battery Voltage48Vdc
Voltage Range40-60Vdc√
Max. PV Charging Current200A√
Max. Grid Charging Current120A√
Max. Generator Charging Current60A√
Max. Hybrid Charging Current200A√

PV Input

Num. of MPP Trackers2
Max. PV Array Power5500W/5500W5500W/5500W6600W/6600W
Max. Input Current25A/25A
Max. Voltage of Open Circuit550Vdc/550Vdc
MPPT Voltage Range125-450Vdc/125-450Vdc

Grid / Generator Input

Input Voltage Range90-140Vac
Frequency Range50/60Hz
Bypass Phase Current63A

Efficiency

MPPT Tracking Efficiency99.9%
Max Efficiency97.5%
CEC Efficiency96.5%

Basic Data

Dimensions750*440*240mm
Weight42kg
Protection DegreeIP65
Operating Temperature Range-25~60℃, >45°C derated
Noise<60dB
Cooling MethodHeat sink + intelligent fan cooling

Communication

Communication PortRS485 / CAN / USB / Dry contact√
External Modules (Optional)Wi-Fi / GPRS√

Certified Specifications

Safety StandardsUL1741&IEEE1547.1-2020, CEC, RULE 21, HECO
EMCFCC 15 class B
RoHSYes

10. Appendix: Parallel Connection

10.1 Parallel Operation

  1. Up to six units can be connected in parallel.
  2. When using the parallel operation function, the following connecting lines (package accessories) shall be firmly and reliably connected.

10.2 Precautions for Connecting the Parallel Connecting Lines

Warning:

  1. PV wiring: In parallel connection, the PV array of each inverter must be independent, and the PV array of PV1 and PV2 for one inverter must also be independent.
  2. Battery wiring: In single-phase or three-phase parallel connection, all solar storage inverters must be connected to the same battery, with BAT+ connected to BAT+ and BAT- to BAT-, and before power on and start-up, it is necessary to check and ensure correct connection, wiring length, and cable size, so as to avoid the abnormal operation of parallel system output caused by wrong connection.
  3. LOAD wiring: When connecting the parallel machine, all the inverse control integrated machine must be connected to L and L, N and N line connected, PE and PE connected, and ensure that the power on and off before connecting correctly and the wiring length and wire diameter is the same, to avoid connecting incorrectly caused by the output of the parallel system does not work properly. When connecting three-phase parallel machines, all inverse control integrated machines must be connected N to N wire and PE to PE. The L lines of all machines in the same phase need to be connected together, but the L lines of AC outputs of different phases cannot be connected together. Other precautions are the same as single-phase connection of parallel machines.
  4. GRID wiring: Parallel connection in single phase: ensure L-to-L, N-to-N and PE-to-PE connection for all solar storage inverters, and that the connection is correct with the same wiring length and line diameter before power on, so as to avoid the abnormal operation of parallel system output caused by wrong connection. Meanwhile, it is not allowed to have multiple different AC source inputs to avoid damage to the external equipment of the inverter. The consistency and uniqueness of AC source input shall be ensured. Parallel connection in three-phase: ensure N-to-N and PE-to-PE connection for all solar storage inverters. The L lines of all inverters connected to the same phase need to be connected together. But L lines of different phases cannot be joined together. Other connection precautions are the same as parallel connection in single phase.
  5. Wiring of parallel communication line: Our parallel communication cable is a shielded 10Pin network connection cable, which can be used for single-phase or three-phase parallel connection. Each machine must be connected with one out and one in. This means that the machine "Parallel_A" is connected to the machine to be parallelized "Parallel_B", and that the machine "Parallel_A" is not allowed to connect to the "Parallel_B". "Parallel_B" or "Parallel_A" is connected to the machine to be parallelized "Parallel_A". At the same time, the parallel communication cable of each machine should be fastened with 10Pin network connection cable to avoid disconnection or poor contact of the parallel communication cable, which may cause abnormal operation or damage to the system output.
  6. Before and after connecting the system, please check the following system wiring diagrams in detail to ensure that all wiring is correct and reliable before powering on.
  7. After the system is correctly wired, powered on, and in normal operation, if a new inverter needs to be connected, make sure to disconnect the battery input, PV input, AC input and AC output, and that all solar storage inverters are powered off before reconnecting into the system.

10.3 Split-Phase Parallel Connection

Setting for each inverter: Select "Parallel" for parallel mode, select "Split Phase" for grid type, when "120V" is selected for output phase voltage, the output L1-L2 voltage is 240V, L1-N voltage is 120V, L2-N voltage is 120V.

10.3.1 Two Inverters in Parallel

Diagrams for two inverters connected in parallel are available in the full user manual.

10.3.2 Three Inverters in Parallel

Diagrams for three inverters connected in parallel are available in the full user manual.

10.3.3 Four Inverters in Parallel

Diagrams for four inverters connected in parallel are available in the full user manual.

10.3.4 Five Inverters in Parallel

Diagrams for five inverters connected in parallel are available in the full user manual.

10.3.5 Six Inverters in Parallel

Diagrams for six inverters connected in parallel are available in the full user manual.

10.4 Three-Phase Parallel Connection

10.4.1 (1) 2 inverters connected in parallel to form a three-phase output (three-phase unbalanced)

P1 machine setting: Parallel mode select "Three phase A", grid type select "Three Phase", when output phase voltage select "120V, the output L1-L2 voltage is 208V, L1-N voltage is 120V, L2-N voltage is 120V.

P2 machine setting: Parallel mode select "Three phase B", grid type select "Three Phase", when output phase voltage select "120V, the output L1-L2 voltage is 208V, L1-N voltage is 120V, L2-N voltage is 120V.

10.4.2 (2) 3 or 6 inverters in parallel to form a three-phase output (three-phase balanced)

P1 machine setting: Parallel mode select "Three phase A", grid type select "Three Phase", when output phase voltage select "120V, the output L1-L2 voltage is 208V, L1-N voltage is 120V, L2-N voltage is 120V.

P2 machine setting: Parallel mode select "Three phase B", grid type select "Three Phase", when output phase voltage select "120V, the output L1-L2 voltage is 208V, L1-N voltage is 120V, L2-N voltage is 120V.

P3 machine setting: Parallel mode select "Three phase C", grid type select "Three Phase", when output phase voltage select "120V, the output L1-L2 voltage is 208V, L1-N voltage is 120V, L2-N voltage is 120V.

11. User Tips

Based on available information, no specific user tips were identified from reviews or Q&A that are not already covered in the main manual sections.

12. Warranty and Support

For technical support, warranty information, or any inquiries regarding your PowMr POW-SunSmart LVM12K Hybrid Solar Inverter, please contact Shenzhen Hehejin Industrial Co., Ltd. using the details below:

  • Tel/Fax: +86755-28219903
  • Email: support@powmr.com
  • Web: www.powmr.com
  • Address: Henggang Street, Longgang District, Shenzhen, Guangdong, China
Documents and downloads

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.