1. Introduction
Thank you for purchasing the TOMZN TOQ7e-125/3 Smart ATS Dual Power Automatic Transfer Selector Switch. This device is designed to ensure uninterrupted power supply by automatically switching between a main power source and a standby power source. It features WiFi remote control via the eWeLink app, making it a convenient and reliable solution for household power management.
This manual provides essential information for the correct installation, operation, and maintenance of your ATS. Please read it carefully before use and retain it for future reference.

Figure: TOMZN TOQ7e Series Automatic Transfer Switch
2. Safety Information
⚠ Warning: To avoid danger of suffocation, keep this bag away from babies and children. Do not use this bag in cribs, beds, carriages, or play pens. This bag is not a toy.
This product is designed for electrical systems and should only be installed and serviced by qualified electrical professionals. Improper installation or use can result in electric shock, fire, or other hazards.
- Always disconnect power before installation, maintenance, or inspection.
- Ensure all connections are secure and comply with local electrical codes.
- Do not operate the device if it appears damaged.
- Do not place the device near flammable materials.
- Ensure adequate ventilation during operation.
- Disconnect from power and store properly when not in use for extended periods.

CE Certification and Recycling Information
This device conforms to the following directives:
- Low Voltage Directive 2014/35/EU
- Electromagnetic compatibility Directive 2014/30/EU
- Restriction of the use of certain hazardous substances (RoHS) Directive 2011/65/EU
3. Technical Specifications
The TOMZN TOQ7e-125/3 is a miniature household dual power automatic transfer switch with smart capabilities. Key specifications are detailed below:
| Parameter | Specification |
|---|---|
| Model Number | TOQ7e-125/3 |
| Brand Name | TOMZN |
| Type | Mini Circuit breaker, Automatic Transfer Switch (ATS) |
| Rated Current (le) | 63A, 100A, 125A (selectable options) |
| Insulation Voltage (Ui) | AC690V, 50/60Hz |
| Rated Voltage (Ue) | AC400V, 50/60Hz |
| Rated Working Voltage | 110V/120V AC |
| Frequency | 50/60Hz |
| Classification | PC class (can be manufactured and withstood without short circuit current) |
| Utilization Category | AC-33iB, AC-31B |
| Pole No. | 2P, 3P, 4P (selectable options) |
| Weight (125A, 3P) | 0.8 kg |
| Electrical Life | 2000 times |
| Manual Operation Life | 5000 times |
| Rated Short Circuit Current (Iq) | 50kA |
| Short Circuit Protection Device | RT16-00-63A (fuse) |
| Rated Impulse Withstand Voltage | 8kV |
| Control Circuit Voltage (Us) | AC110V or 220V 50/60Hz (Normal working conditions: 85-110%Us) |
| Auxiliary Circuit | 2 relays, each with two sets of contact converter contact capacity: AC110V or 220V 50/60Hz le=5y |
| Conversion Time of Contactor | <50ms |
| Operation Conversion Time | <50ms |
| Return Conversion Time | <50ms |
| Power Off Time | <50ms |
| Is Smart Device | Yes (eWeLink App, WiFi control) |
| Origin | Mainland China |
| Certification | CE |
| EU LVD Voltage | High voltage: Above 50Vac or 75Vdc |
| High-concerned chemical | None |
Product structure features: Built-in controller, guide rail type, high current capacity, small volume, two-stage type, simple structure, ATS integration. Fast switching speed, low failure rate, convenient maintenance, and reliable performance.
Wiring mode: Front plate wiring.
Conversion modes: Power grid to power grid, power grid to generator, photovoltaic to urban power, automatic switching and self-recovery.
4. Installation and Wiring
4.1 General Installation Conditions
- Ambient Air Temperature: Maximum 40°C, minimum -5°C. Average temperature within 24 hours shall not exceed 35°C.
- Altitude: Installation site altitude should not be higher than 2000m.
- Atmospheric Conditions: At 40°C, relative humidity should not exceed 50%. At -5°C, relative humidity can be higher (e.g., 90% at 25°C).
- Pollution Grade: Conforms to grade 3 specified in IEC/EN60947-6-1, GB/T14048.11.
- Installation Category: Conforms to the category specified in IEC/EN60947-6-1, GB/T14048.11.
- Condensation: Special measures should be taken to deal with occasional condensation on the product surface due to temperature changes.
4.2 Pre-Installation Check
- Ensure that professionals read this manual before installation and wiring.
- Check the integrity of the ATS.
- Open and close the ATS with the operating handle to check the flexibility of the transmission device.
- Detect the load generation and disconnection conditions of common and standby power supplies at each stage.
4.3 Installation Procedure
The ATS can be installed vertically in a control cabinet or distribution cabinet. Ensure the installation distance meets the requirements shown in the dimension diagram (Figure 8) in the full PDF manual.

Figure: Side View of ATS, indicating Load Side
The trademark is located on the front of the product. If installation cannot be carried out according to procedures due to wiring or other reasons, contact support.
For detailed diagrams of overall and installation dimensions, please refer to Figure 8: Overall and installation dimension of 125 (mm) and Figure 9: Correct installation direction of 125 in the complete user manual PDF: TOMZN TOQ7e User Manual (PDF).
4.4 Wiring Instructions
- Detection Control Voltage: 50/60Hz, AC220V.
- The coil in the control circuit cannot be too long.
- The cross-sectional area of copper wire should not be greater than 2.0mm².
- Wire correctly according to the instructions provided in the enclosure.
- This switch requires a zero live wire power supply. Live installation is strictly prohibited!
- The switching principle of this equipment is through the control circuit fire wire to realize electrical work and stop. The device can work normally only if the power supply is zero live wire.
For comprehensive wiring diagrams, including Internal wiring diagram (Fig. 1), Controller wiring diagram (Fig. 2), 125/2P wiring diagram (Fig. 3), 125/3P wiring diagram (Fig. 4), 125/4P wiring diagram (Fig. 5), 125/2P wiring diagram with digital timer (Fig. 6), Special connection mode photovoltaic inverter (Fig. 7), Appliance wiring instruction, Ceiling lamp wiring instruction, One wire wiring instruction, and Correct wiring diagram with circuit breaker, please consult the full PDF user manual: TOMZN TOQ7e User Manual (PDF). Pay close attention to the note that the switch must be powered up by N and L wires.
5. Operation
5.1 Manual/Automatic Operation
The ATS guarantees power generation and power failure performance during circuit operation. However, for manual operation, the performance cannot be guaranteed due to variations in power generation/failure speed or operator actions. Excessive silver alloy loss may occur during manual power generation and power failure.
- For Inspection and Maintenance: When all power supplies are cut off to check and maintain the operating system and contacts, pull the selector switch to the Manual position.
- Normal Operation: Under normal circumstances, keep the selector switch in the Automatic position.
- After Manual Operation: Once manual operation is completed, return the selector switch from the Manual position to the Automatic position.

Figure: Manual/Automatic Selector Switch
5.2 Control Circuit
The ATS becomes active instantly. After conversion, the coil in the control circuit is disconnected by the internal converter. The coil operates normally under a rated voltage of 80%-110%. Low voltage can cause coil heating and even spontaneous combustion.
6. WiFi Connection and Setup Guide (eWeLink App)
The TOMZN TOQ7e-125/3 supports WiFi remote control and smart features through the eWeLink app. Follow these steps to connect and configure your device.
6.1 Pre-requisites
- Your phone must be connected to a 2.4GHz WiFi network. (5GHz WiFi is not supported for initial pairing).
- Your phone's operating system should be Android 5.0/iOS 10.0 or higher.
- You must be able to access and download the eWeLink app from your phone's app store.
- If your router has Mac address filtering enabled, temporarily disable it during the pairing process.

Figure: WiFi Remote Control via eWeLink App
6.2 Adding Device to eWeLink App
- Download eWeLink App: Search for "eWeLink" in your app store and download it.
- Prepare for Pairing:
- Ensure your phone's Wi-Fi is connected to a 2.4GHz network.
- Long press the pairing button on the ATS for more than 5 seconds until the red LED indicator blinks twice quickly and then stays on. This indicates it has entered pairing mode.
- Initiate Pairing in App: Open the eWeLink app, tap the "+" icon at the bottom of the screen, select "WiFi Pairing", and click "Next". The app will automatically scan for devices.
- Select Device and Connect: Click on the discovered device, confirm the relevant information, click "Save", and wait for the device to connect.
- Name Device: After successful addition, you can change the device name (e.g., "living room lamps") and click "Complete".
For visual guidance on the eWeLink app interface for downloading, adding devices, and pairing, please refer to Section 10: WiFi Connection and Setup Guide (pages 15-18) in the complete user manual PDF: TOMZN TOQ7e User Manual (PDF).

Figure: WiFi Smart Dual Power Switch - Source Switching via App
6.3 Scheduling and Timer Functions
The eWeLink app allows you to set schedules, timers, and loop timers for automatic power switching.
Schedule Setup
To set up schedules for automatic ON/OFF actions, navigate to the "Schedule" section within the device control screen in the eWeLink app. You can add new schedules, set specific times, select repeat days, and define the action (ON/OFF). For detailed screenshots, refer to page 19 of the PDF manual.

Figure: Auto-Schedule Power Switching via eWeLink App
Timer Setup
To configure countdown timers, go to the "Timer" section in the eWeLink app. You can add new timers, set the countdown duration, and specify the action (ON/OFF). Visual instructions are available on page 20 of the PDF manual.
Loop Timer Setup
Loop timers enable the device to cycle ON/OFF repeatedly for a set duration. Access this feature under "Loop Timer" in the app. You can configure the loop method, start time, repeat interval, and action. Refer to page 21 of the PDF manual for screenshots.
6.4 Device Settings and Power-on State
You can access various device settings, including the power-on state, which defines the device's behavior after a power outage or being physically turned off. Navigate to the device settings (gear icon) in the app and find "Power-on State" to choose between "ON", "OFF", or "Last state". Detailed screenshots are on page 23 of the PDF manual.
6.5 2.4G Bluetooth Remote Control Pairing
The device supports pairing with a 2.4G wireless stick-on smart wall switch or RM2.4G remote controller. (Note: Power metering devices do not support these features). For visual instructions on pairing and eWeLink Remote setup, refer to pages 23-25 of the PDF manual.
eWeLink Remote Setup
- Open the added device and click the settings icon in the upper right corner.
- Select "eWeLink Remote".
- Follow the prompts for the next step. The LED indicator "flashes once again" means the pairing is successful.
- To add a new remote, complete remote pairing and button learning as per the tutorial in the app.
- Deleting a Remote: If you need to delete an RM2.4G remote control, enter the added interface and delete it.
7. Maintenance and Inspection
Regular maintenance ensures the longevity and reliable performance of your ATS. All maintenance and inspection procedures must be performed by professionals with all power supplies cut off in advance.
7.1 Maintenance Frequency
- First Maintenance: Within 6 months after initial use.
- Regular Maintenance: At least once a year.
- Harsh Conditions: Increase the frequency of maintenance and inspection in harsh installation environments.
7.2 Maintenance and Inspection Items
- Cleanliness: Remove dust and dirt from the device.
- Electrical Contacts: Check for deformation, damage, or burnt metal particles on and around the contact parts. Remove any such particles.
- Contact Surface: Rust, acidification, and dust on the contact surface can lead to poor contact. Operate the device manually many times and measure the contact resistance if necessary.
- Insulation Resistance: If the ATS has been exposed to long-term moisture or suspension, dry it before use. After cleaning, use a 500V megohmmeter to measure the insulation resistance between the normal supply, alternating power supply, load side bar, live parts, and metal plate. The insulation resistance should not be less than 10MΩ.
7.3 Storage
The ATS should be stored in an environment equivalent to normal working conditions, with appropriate dust-proof, moisture-proof, and collision-proof measures.
8. Troubleshooting (eWeLink App & WiFi)
If you encounter issues with your ATS, particularly regarding its smart functions, refer to the following common problems and solutions.
8.1 Device Appears Offline After Successful Addition
After adding the device, it typically takes 1-2 minutes to connect to the network. If it remains offline:
- Check Wi-Fi Indicator Status:
- Blinks quickly once per second: Device is not connected to your Wi-Fi.
- You may have entered an incorrect Wi-Fi password.
- The device might be too far from your router, the signal too weak, or there's interference. Move the device closer to the router.
- The device cannot recognize 5G Wi-Fi. Ensure you are using a 2.4G Wi-Fi network.
- Mac address filtering might be enabled on your router. Disable it.
- If issues persist, try using another phone to open a personal hotspot and attempt to re-add the device.
- Blinks quickly twice per second: Device is connected to Wi-Fi but not to the Internet.
- Confirm your Wi-Fi connection network is stable and normal. Frequent blinking indicates an unstable network, not a product malfunction.
- If the network is normal, power off and restart the device.
- Blinks quickly once per second: Device is not connected to your Wi-Fi.
8.2 Factory Reset
If you need to change to a new network or resolve persistent issues, perform a factory reset:
- Press and hold the pairing button for 5 seconds until the LED indicator blinks twice. This resets the device and enters Bluetooth pairing mode again.

Figure: eWeLink App Interface (for reference)
eWeLink has integrated with mainstream AI platforms. To ensure users can quickly identify compatible platforms/smart speakers, manufacturers may print a "Works with AI" eWeLink logo on packaging or in the user manual. Smart products supporting eWeLink APP need certification from corresponding platforms before using AI voice platform logos.
9. User Tips
- Power Supply Configuration: For a 3-phase system with 1P (127V) + 1P (127V) + 1P NEUTRAL (0V), you would typically need a 3P (Three Pole) ATS model. Ensure the voltage rating matches your system (e.g., 120V AC).
- Professional Installation: Given the high voltage and critical function of this device, professional installation by a certified electrician is highly recommended to ensure safety and compliance with electrical codes.
10. Warranty and Support
For technical support, warranty claims, or any inquiries regarding your TOMZN ATS, please contact the manufacturer directly.
Manufacturer Contact Information:
TOMZN ELECTRIC CO.,LTD.Address: No.11, Xinhe Road, Huabei, Liushi Town, Yueqing City, Zhejiang Province, China
Service Hotline: 4006-020-158
Website: http://www.tomzn.com
A comprehensive user manual with detailed diagrams and app screenshots is available in PDF format. You can download it here: TOMZN TOQ7e User Manual (PDF).