1. Introduction
The ATORCH CW24 is a smart battery capacity tester designed to measure and display various parameters of battery packs, including voltage, current, power, true capacity, battery temperature, and remaining charge/discharge time. It features a digital display, WiFi connectivity for remote monitoring via the Tuya or Smart Life app, and PC software for online testing and data export.
This instrument is suitable for a wide range of applications such as electric vehicles, RVs, cars, emergency power supplies, energy storage systems, and various measuring equipment. It supports all types of battery packs, including lithium, lithium iron phosphate, lead-acid, and nickel-hydrogen batteries, with operating voltages ranging from DC 0V to 420V.

Figure 1: CW24 Tester with Mobile App Interface
2. Package Contents
The package contents vary slightly depending on the current rating model purchased. A typical package includes:
- CW24 Meter (WiFi version) x1
- 300cm Type-C Data Cable x1
- Temperature Probe x1
- USB Power Supply Cable x1
- External Shunt (specific to the current rating, e.g., 30A, 100A, 200A, 500A, or 1000A) x1
3. Setup
3.1. Wiring Instructions
Ensure all connections are secure before powering on the device. If the battery voltage is less than 10V, a separate DC 5V-12V power supply is required for the instrument to operate.
3.1.1. Standard Wiring (Excluding Relay)
This method is for direct measurement without relay control.

Figure 2: Standard Wiring Diagram
- Connect the battery's positive terminal (B+) to the V+ terminal on the shunt.
- Connect the battery's negative terminal (B-) to the V- terminal on the shunt.
- Connect the charger's positive (C+) and output positive (P+) to the C+/P+ terminal on the shunt.
- Connect the charger's negative (C-) and output negative (P-) to the C-/P- terminal on the shunt.
- Connect the load to the appropriate terminals on the shunt.
- Connect the temperature probe to its designated interface on the shunt board.
- Connect the 300cm Type-C cable from the shunt board to the display unit.
- If needed, connect an independent DC 5V-12V power supply to the shunt board.
3.1.2. Relay Wiring Method (for 100V 80A Relay)
This method integrates a relay for control applications.

Figure 3: Relay Wiring Diagram
- Follow steps 1-7 from the Standard Wiring method.
- Connect the relay interface from the shunt board to the relay module.
- Connect the load through the relay as per the relay's instructions.
3.2. 1000A Shunt Assembly Instructions
For the 1000A model, the shunt is heavy and requires assembly to prevent damage to the control panel.

Figure 4: Control Module and 1000A Shunt
- Prepare Components: You will have the control module and the 1000A shunt.
- Remove Shunt Screws: Use a screwdriver to remove the existing screws from the 1000A shunt.
- Align Control Board: Align the screw holes of the control board with the screw holes on the 1000A shunt.
- Secure Control Board: Tighten and fix the two screws onto the control board, securing it to the shunt.
- Connect Display Panel: Install the display panel and splitter according to the provided diagram (connect V@A DATA cables).

Figure 5: Removing Shunt Screws

Figure 6: Aligning Control Board

Figure 7: Securing Control Board
3.3. WiFi Network Setup
The CW24 supports connection to a 2.4GHz WiFi network for remote monitoring via the Smart Life or Tuya app. Ensure Bluetooth and location permissions are enabled on your smartphone during setup.
- Download App: Download and install the