Preface
This manual provides detailed information regarding the product, including installation, application, troubleshooting, precautions, and maintenance of iMars series grid-tied solar inverters. It does not contain all information about the photovoltaic system. Please read this manual carefully and adhere to all safety precautions during moving, installation, operation, and maintenance to ensure correct use and high performance of the inverter.
The use of iMars series grid-tied solar inverters must comply with local laws and regulations concerning grid-tied power generation.
This manual should be kept accessible at all times. All rights reserved. The contents of this document are subject to change without notice. Data deviations may occur due to product improvements; detailed information will align with the final product.
1. Safety Precautions
iMars series grid-tied solar inverters are designed and tested strictly in accordance with relevant international safety standards. As an electrical and electronic device, all relevant safety regulations must be strictly complied with during installation, operation, and maintenance. Incorrect use or misuse may result in:
- Injury to the life and personal safety of the operator or other people.
- Damage to the inverter or other property belonging to the operator or other people.
To avoid personal injury and damage, please strictly observe the following safety precautions. This chapter describes various warning symbols and provides safety instructions for installation, operation, maintenance, and use of the iMars series grid-tied solar inverters.
1.1 Icons
This manual uses icons to highlight physical and property safety information to prevent device damage and physical injury. The icons used are:
| Icons | Name | Instruction | Abbreviation |
|---|---|---|---|
| Danger | Serious physical injury or even death may occur if not follow the relative requirements | ||
| Warning | Physical injury or damage to the devices may occur if not follow the relative requirements | ||
| Do not | Damage may occur if not follow the relative requirements | ||
| Hot sides | Sides of the device may become hot. Do not touch. | ||
| Note | Physical hurt may occur if not follow the relative requirements | Note |
1.2 Safety Guidelines
- Upon receipt, check for any visible damage to the package or inverter. If damage is suspected, contact the shipping company and local dealer before installation.
- Only qualified electricians are permitted to operate on the inverter.
- Do not perform any wiring, inspection, or component changes while power is applied.
- This product can cause residual current in the external protective earth conductor. If a residual current-operated protective (RCD) or monitoring (RCM) device is used for protection against direct or indirect contact, only a Type B RCD or RCM is allowed on the supply side.
- Ensure no electromagnetic interference from other electrical and electronic equipment at the installation site.
- Do not modify the inverter without authorization.
- All electrical installations must comply with national or local laws and standards.
- The temperature of individual parts or the inverter enclosure (especially the heat sink) may become hot during normal operation. There is a risk of burns. Do not touch.
- Do not open the inverter cover without authorization. Electrical parts and components inside the inverter are electrostatic. Take precautions to avoid electrostatic discharge during operation.
- The inverter must be reliably grounded.
- Ensure that DC and AC side circuit breakers have been disconnected and wait at least 5 minutes before wiring and checking.
Note: Technical personnel performing installation, wiring, commissioning, maintenance, troubleshooting, and replacement of iMars series grid-tied solar inverters must meet the following requirements:
- Operators need professional training.
- Operators must read this manual completely and master related safety precautions.
- Operators need to be familiar with relevant safety regulations for electrical systems.
- Operators need to be fully familiar with the composition and operating principle of the entire grid-tied photovoltaic power generation system and related standards of the countries/regions where the project is located.
- Operators must wear personal protective equipment.
1.2.1 Delivery and Installation
- Keep the package and unit complete, dry, and clean during storage and delivery.
- Please remove and install the inverter with two or more people, as the inverter is heavy.
- Remove and install the inverter with appropriate tools to ensure safe and normal operation and avoid physical injury or death. Personnel should also use mechanical protective measures, such as protective shoes and work clothes.
- Only qualified electricians are allowed to install the inverter.
1.2.2 Grid-tied Operation
- Do not put or install the inverter on or close to combustible materials.
- Keep the installation site away from children and other public places.
- Remove metal jewelry (rings, bracelets) before installation and electrical connection to avoid electric shock.
- Cover solar modules with light-tight materials. Exposed to sunlight, solar modules will output dangerous voltage.
- The inverter input voltage must not exceed the maximum input voltage; otherwise, inverter damage may occur.
- The positive and negative poles of solar modules cannot be grounded, as this may cause irrecoverable damage.
- Ensure proper grounding of the inverter; improper connection or no grounding may cause the inverter to stop.
- Ensure reliable installation and electrical connection.
- When photovoltaic generator cells are exposed to light (even if dim), the generator supplies DC voltage to the inverter.
Note: iMars series grid-tied solar inverters are only for crystalline silicon solar modules.
1.2.3 Maintenance and Inspection
- Only qualified electricians are allowed to perform maintenance, inspection, and component replacement of the inverter.
- Contact the local dealer or supplier for maintenance.
- To prevent unauthorized personnel from entering the maintenance area, temporary warning labels must be placed, and a fence used for isolation.
- Firstly, disconnect all power supplies from the grid to the inverter before any maintenance, then disconnect the breakers and wait for at least 5 minutes until the inverter is discharged.
- Follow electrostatic protection norms and take correct protective measures due to electrostatic sensitive circuits and devices in the inverter.
- Do not use parts and components not provided by the manufacturer during maintenance.
- Restart the inverter after resolving any fault or problem that may affect its safety and performance.
- Do not touch any metal conductive part of the grid or inverter, as this may cause electric shock, physical injury, death, or fire. Observe all warning icons and instructions related to "electric shock."
1.2.4 What to do after scrapping
Do not dispose of the inverter with household waste. The user is responsible for sending it to a designated organization for recycling and disposal.
2. Product Overview
This chapter describes the appearance, packaging accessories, nameplate, technical parameters, and other information of iMars series grid-tied solar inverters.
2.1 Solar Grid-tied Power Generation System
2.1.1 Application
The photovoltaic grid-tied power generation system consists of solar modules, a grid-tied inverter, metering devices, and the public grid. The grid-tied solar inverter is the core component, converting DC electric energy from solar modules into sinusoidal AC energy with the same frequency and phase as the public grid, which is then fed into the grid.
iMars series grid-tied solar inverters are only applied in solar grid-tied power generation systems where DC input is composed solely of crystalline silicon solar modules whose negative and positive poles are not grounded.
- The recommended solar modules need to comply with IEC61730 Class A rating.
- iMars series grid-tied solar inverters are only for crystalline silicon solar modules.
2.1.2 Supported Grid Connection Structure
iMars series grid-tied solar inverters support TN-S, TN-C, TN-C-S, and TT grid connections. When applied to TT connection, the N-to-PE voltage should be less than 30V.
2.2 Product Appearance
| No. | Name | Instruction |
|---|---|---|
| 1 | Cover | |
| 2 | Operational panel | LED indicators |
| 3 | DC switch | On-off of the DC input (optional) |
| 4 | DC input port | For the connection of solar modules |
| 5 | AC terminal | For the connection of AC output |
| 6 | Communication port | RS485 and EXT communication port |
| 7 | Cooling chamber | |
| 8 | Radiator | |
| 9 | Name plate | For rated parameters and safety precautions of the inverter |
2.3 Nameplate
The nameplate provides essential information about the inverter:
- Trademark and product type
- Model and important technical parameters
- Certification system of the inverter confirming
- Serial number, company name, and country of origin.
2.4 Product Models
| Product name | Model | Rated output power |
|---|---|---|
| Single-phase (L, N, PE) | ||
| Single-phase grid-tied solar inverter | iMars MG750TL | 750 |
| Single-phase grid-tied solar inverter | iMars MG1KTL | 1000 |
| Single-phase grid-tied solar inverter | iMars MG1K5TL | 1500 |
| Single-phase grid-tied solar inverter | iMars MG2KTL | 2000 |
| Single-phase grid-tied solar inverter | iMars MG3KTL | 3000 |
| Single-phase grid-tied solar inverter | iMars MG4KTL | 3680 |
| Single-phase grid-tied solar inverter | iMars MG4K6TL | 4200 |
| Single-phase grid-tied solar inverter | iMars MG5KTL | 4600 |
| Single-phase grid-tied solar inverter | iMars MG3KTL-2M | 3000 |
| Single-phase grid-tied solar inverter | iMars MG4KTL-2M | 3680 |
| Single-phase grid-tied solar inverter | iMars MG4K6TL-2M | 4200 |
| Single-phase grid-tied solar inverter | iMars MG5KTL-2M | 4600 |
Note: Refer to the product specifications in chapter 9 for detailed information.
2.5 Dimensions and Weight
| Model | H (mm) | W (mm) | D (mm) | Net weight (kg) |
|---|---|---|---|---|
| MG750TL/MG1KTL/MG1K5TL/MG2KTL/MG3KTL | 280 | 300 | 138 | 9.5 |
| MG4KTL/MG4K6TL/MG5KTL | 365 | 360 | 150 | 15 |
| MG3KTL-2M/MG4KTL-2M/MG4K6TL-2M/MG5KTL-2M | 420 | 360 | 150 | 17 |
Package Dimensions and Gross Weight
| Model | H (mm) | W (mm) | D (mm) | Gross weight (kg) | Packaging Material |
|---|---|---|---|---|---|
| MG750TL/MG1KTL/MG1K5TL/MG2KTL/MG3KTL | 411 | 418 | 251 | 11 | Paper |
| MG4KTL/MG4K6TL | 518 | 480 | 284 | 17 | Paper |
| MG3KTL-2M/MG4KTL-2M/MG4K6TL-2M/MG5KTL-2M | 573 | 480 | 284 | 19 | Paper |
3. Storage
If the inverter is not put into use immediately, its storage should meet the following requirements:
- Do not remove the outer packing.
- The inverter needs to be stored in a clean and dry place, protected from dust and water vapor.
- The storage temperature should be kept between -40°C and +70°C, and the relative humidity between 5%RH and 95%RH.
- Stacking of inverters is recommended according to the number of stacking layers in the original shipment. Place the inverter carefully during stacking to avoid personal injury or equipment damage caused by falling.
- Keep away from chemically corrosive substances that may corrode the inverter.
- Periodic inspections are required. If damage from worms or rats, or packaging damage is found, the packaging materials must be replaced promptly.
After long-term storage, inverters need to be inspected and tested by qualified personnel before use.
4. Installation
This chapter describes how to install the inverter and connect it to the grid-tied solar system (including connections between solar modules, public grid, and inverter). Read this chapter carefully and ensure all installation requirements are met before installation. Only qualified electricians are allowed to install the inverter.
4.1 Unpacking Inspection
Inspect the order information and nameplate to ensure the product matches the order and that there is no damage to the package. If any problems are found, contact the supplier as soon as possible. If not used immediately, store the inverter in its package, protected from humidity and dust.
After unpacking, check the following:
- Ensure no damage to the inverter unit.
- Ensure the operation manual, port, and installation accessories are in the package.
- Ensure no damage or loss to the items in the package.
- Ensure the information on the order matches that on the nameplate.
Packing List:
| No. | Name | Quantity |
|---|---|---|
| 1 | MG750TL/MG1KTL/MG1K5TL/MG2KTL/MG3KTL/MG4KTL/MG4K6TL/MG5KTL/MG3KTL-2M/MG4KTL-2M/MG4K6TL-2M/MG5KTL-2M inverter | 1 |
| 2 | Installation bracket | 1 |
| 3 | Operation manual | 1 |
| 4 | Hexagon assembling bolt M5*20 | 2 |
| 5 | Expansion bolts M6*60 | 3pcs (for MG750TL-MG3KTL), 4pcs (for MG4KTL-MG5KTL-2M) |
| 6 | DC connector | 1 pair (for MG750TL-MG3KTL), 2 pairs (for MG4KTL-MG5KTL-2M) |
| 7 | AC connector | 1 |
4.2 Before Installation
4.2.1 Installation Tools
| No. | Installation tools | Instruction |
|---|---|---|
| 1 | Marking pen | Mark the installation hole |
| 2 | Electrodrill | Drill in the bracket or wall |
| 3 | Hammer | Hammer on the expansion bolts |
| 4 | Monkey wrench | Fix the installation bracket |
| 5 | Allen driver | Fasten the screws, remove and install AC wiring box |
| 6 | Straight screwdriver | For AC wiring |
| 7 | Megger | Measuring insulation performance and impedance |
| 8 | Multimeter | Check the circuit and AC and DC voltage |
| 9 | Electric iron | Weld communications cable |
| 10 | Wire crimper | Crimp DC terminals |
4.2.2 Installation Place
Select the installation place based on the following considerations:
- Height from ground level should be enough to ensure that display and status LEDs are easy to read.
- Select a well-ventilated place sheltered from direct sun radiation and rain.
- Allow sufficient space around the inverter to enable easy installation and removal from the mounting surface.
- The environment temperature is between -25°C and 60°C.
- The installation position keeps away from the interface of other electrical devices.
- The inverter needs to be installed on a firm and sturdy surface, such as a wall or metal bracket.
- The installation surface should be perpendicular to the horizontal line.
- The installation should ensure that the inverter is reliably grounded, and the material of the grounded metal conductor should be consistent with the metal material reserved for the grounding of the inverter.
Ensure there is sufficient space for heat-releasing. Generally, the following space requirements should be met:
| Minimum clearance | |
|---|---|
| Lateral | 200mm |
| Top | 450mm |
| Bottom | 450mm |
Warning: Do not remove any part or component of the inverter unintentionally; otherwise, damage to the device and physical injury may occur.
4.2.3 Connection Cables
Select connection cables according to the table below:
| Model | DC side | AC side | ||
|---|---|---|---|---|
| Cross-section (length ≤50m) mm² | Cross-section (length >50m) mm² | Mini cross-section mm² (L) | Mini cross-section mm² (N/PE) | |
| MG750TL/MG1KTL/MG1K5TL/MG2KTL/MG3KTL | 4 | 4 | 4 | |
| MG4KTL/MG4K6TL/MG5KTL/MG3KTL-2M/MG4KTL-2M/MG4K6TL-2M/MG5KTL-2M | 4 | 4 | 6 | |
4.2.4 Miniature Circuit Breakers
It is strongly recommended to install circuit breakers or fuses at the DC input and AC output to ensure safe installation and operation.
- To protect the PCE, user, and installer, external DC and AC circuit breakers shall be equipped at the end-use application.
- Wiring shall comply with local electrical codes. Choose proper cables for power input and output lines. Input and output cables shall be PV private cables suitable for outdoor use.
Breaker Specifications:
| Model | DC input | AC output |
|---|---|---|
| Recommended DC breakers (optional for length >100m) | Recommended AC breakers | |
| MG750TL/MG1KTL/MG1K5TL | DC500V, C10A, 2P | AC240V, C10A, 2P |
| MG2KTL | DC500V, C16A, 2P | AC240V, C16A, 2P |
| MG3KTL/MG3KTL-2M | DC500V, C16A, 2P | AC240V, C20A, 2P |
| MG4KTL/MG4KTL-2M | DC600V, C20A, 2P | AC240V, C25A, 2P |
| MG4K6TL/MG5KTL/MG4K6TL-2M/MG5KTL-2M | DC600V, C25A, 2P | AC240V, C32A, 2P |
4.3 Mechanical Installation
Since the installation place can be made of different construction materials, the inverter can be installed by various mounting methods. Taking a typical concrete wall environment as an example, this manual describes how to install the inverter. The inverter should be mounted in a vertical position, 90° to the horizontal line.
4.3.1 Installation of Single-phase Inverter
Installation steps:
- First, take the installation bracket from the package.
- Place the installation bracket at the appropriate height and position on the wall, mark the hole locations according to the fixing holes, drill holes to a depth of about 70mm, and mount the bracket according to the arrow sign.
- Lift the inverter to suspend it on the installation bracket using M8 hex socket cap screws.
- Finally, fasten M5 hex socket cap screws connecting the inverter with the bracket and tighten the screws to 2 Nm. For firm installation, operators must not release the device until the inverter is firmly installed on the bracket.
4.4 Electrical Installation
This section describes detailed electrical installation and related safety instructions.
- Improper operation during the wiring process can cause fatal injury to the operator or irrecoverable damage to the inverter. Only qualified personnel can perform the wiring work.
- All electrical installations must comply with local and national electrical codes.
- All cables must be firmly attached, undamaged, properly insulated, and adequately dimensioned.
- It is not allowed to close the AC and DC breakers before the inverter is electrically connected.
- Read and follow the instructions provided in this section while observing all safety warnings.
- Always note the rated voltage and current defined in this manual. Never exceed the limits.
4.4.1 Connection of Solar Modules
Connection steps:
- Lightning, short-circuit, and other protection measures that meet local electrical safety laws and regulations are needed before the AC connection.
- Connect the output cables of solar modules to the DC connector as shown in Figure 4.7. Loosen the nut of the connector and remove about 15mm of the DC cable's isolation layer. Insert it into the connector and press until you hear a lock sound. Finally, tighten the nut to a torque of 2.5-3 Nm. The wiring of the negative pole is the same as that of the positive pole. Ensure the poles of solar modules are well connected with the connectors.
- After the DC connector is connected, use a multimeter to measure the voltage of the DC input string, verify the polarity of the DC input cable, and ensure that the voltage of each string is within the allowable range of the inverter.
- Only qualified cables under local electrical safety laws and regulations are allowed to connect.
- The solar modules connected with the inverter must be the configured ones, not unauthorized connecting devices. Otherwise, device damage, unstable operation, or fire may occur.
- Connect the DC connector with the inverter and ensure it is tightly fastened.
- Insert a screwdriver into the hole of the connector to remove it from the inverter.
- Unclench the pressed cover with a screwdriver to remove the cables from the connector.
4.4.2 AC Connection
Connection steps for single-phase inverter:
- Before connecting the single-phase AC grid cable to the inverter, take lightning and short-circuit protection measures in accordance with local electrical safety codes.
- As shown in Figure 4.9, connect and fasten L, N, and PE conductors of the single-phase common grid to the AC terminal, tightening to 0.5 Nm. Assemble the terminal, tightening to 2.5-3 Nm, and then connect the terminal to the AC port of the inverter.
- Fix and connect the DC output cables of the PV board with the matched DC connectors, and then connect the connectors to the DC port of the inverter.
- Only qualified cables under local electrical safety laws and regulations are allowed to connect.
- Only with the permission of the local electric power company can the inverter be connected to the utility grid.
5. Operation
This chapter describes the detailed operation of the inverter, including inspection before operation, grid-tied operation, stopping, and daily maintenance.
5.1 Inspection Before Operation
Perform the following checks before operation:
- Ensure the installation site meets the requirements mentioned in section 4.2.2 for easy installation, removal, operation, and maintenance.
- Ensure the mechanical installation meets the requirements mentioned in section 4.3.
- Ensure the electrical installation meets the requirements mentioned in section 4.4.
- Ensure all switches are "off".
- Ensure the voltage meets the requirements mentioned in chapter 9.
- Ensure all electrical safety precautions are clearly identified at the installation site.
Warning: Perform the above checks before any operation if the system or inverter needs to be installed, refitted, or maintained.
5.2 Grid-tied Operation
- When powering on the inverter for the first time, refer to section 6.5 to complete grid certification choice.
- Keep the inverter powered on for at least 30 minutes to charge the internal clock battery.
To start the inverter:
- Ensure the requirements mentioned in section 5.1 are met.
- Switch on the breakers at the AC side.
- Switch on the integrated DC switch.
- Switch on the switch on the DC side.
- Observe the LED indicators and information displayed on the screen. Refer to chapter 6 for detailed information.
- Run: Green indicator blinks, others off: the inverter is powered on and in self-inspection.
- Run: Green indicator on, others off: the inverter is in power generation after self-inspection (successful commissioning).
- "Warn" or "Fault" indicators are on or blinking: the inverter is powered on, but a fault occurs. Refer to section 6.3 for detailed information, then stop as mentioned in section 5.3. Settle the problems as described in chapter 8. If all faults are resolved, proceed as mentioned in chapter 5.
5.3 Stopping
Stop the inverter as follows if maintenance, inspection, or troubleshooting is required:
- Switch off the breakers at the AC side.
- Switch off the integrated DC switch.
- Switch off the switch on the DC side.
- Wait at least 5 minutes until the internal parts and components are discharged. Then stop the inverter.
5.4 Daily Maintenance
The inverter can perform power generation, start, and stop automatically even with day/night shifts and seasonal changes. To prolong its service life, daily maintenance and inspection are necessary, following the instructions in this manual.
5.4.1 Regular Maintenance
| Maintenance contents | Maintenance methods | Maintenance cycle |
|---|---|---|
| Store the operation data | Use real-time monitoring software to read inverter running data, regularly back up all inverter running data and stats. Check the monitoring software and inverter LCD screen to make sure the parameters are set correctly. | Once each quarter |
| Check inverter operation status | Check to make sure the inverter installation is solid, no damage or deformation. When inverter running, check to make sure the sound and variables are normal. When inverter running, use thermal imager to check whether the case cooling is normal. | Every six months |
| Clean the surface | Check the ambient humidity and dust around inverter, clean the inverter when necessary. See Section 5.4.2. | Every six months |
| Check electrical connection | Check the cable connection and inverter terminals, make sure they are connected reliably, not loose, and no damage, insulation reliable. | Every six months |
| Check the security features | Check the off-on feature of inverter: use monitoring software or LCD and keyboard on the inverter, do "off" and "on" operation, to confirm its off-on feature intact. At the same time, make sure monitoring software can normally communicate with the inverter. Check the warning label on or around the inverter, if necessary replaced. | Every six months |
5.4.2 Maintenance Guide (Clean the Inverter)
Cleaning procedure:
- Disconnect the input and output switches.
- Wait ten minutes.
- Use a soft brush or a vacuum cleaner to clean the surface and the inlet and outlet of the inverter.
- Repeat Section 5.1 operating content.
- Restart the inverter.
6. Display Panel
This chapter describes the panel display and how to operate it, including the LCD display, LED indicators, and operation panel.
6.1 LED Indicators
There are three LED indicators on the panel:
- "Run", operation indicator, green;
- "Warn" recoverable fault indicator, yellow;
- "Fault" unrecoverable fault indicator, red.
The inverter state includes 6 states: stand-by, self-inspection, power generation, recoverable fault, and unrecoverable fault. LED indicators are on, off, or blinking. Refer to Table 6-1 for detailed states.
- ☐: LED indicator is off;
- (green), (yellow), (red): LED indicator is blinking at every 0.25S or 0.5S;
- (Green), (yellow), (red): LED indicator is on.
Inverter State and LED Indicators:
| Inverter state | LED indicators | Description |
|---|---|---|
| Stand-by | ☐ Run, ☐ Warn, ☐ Fault | No power on. All indicators off. |
| Self-inspection | ☑ Run, ☐ Warn, ☐ Fault | Green indicator blinks in every 0.25s, others off. Power on and ready for self-inspection. |
| Power generation | ☑ Run, ☐ Warn, ☐ Fault | Green indicator keeps on, others off. Grid-tied power generation. |
| ● Run, ● Warn, ☐ Fault | (1) Grid-tied power generation, but clock fault (A007); (2) Grid-tied power generation, but DC input fault (A001 or E001); (3) Grid-tied power generation, but fan fault (E006 or E012); Green and yellow indicator keeps on, others off. | |
| Recoverable fault | ☐ Run, ● Warn, ☐ Fault | Inverter stand-by. The public grid fault (A001, A003, A004, A005 or A006); Yellow indicator blinks in every 0.5s, others off. |
| Unrecoverable fault | ☐ Run, ☐ Warn, ☑ Fault | Hardware or software fault (E003, E004, E005, E008, E009, E011, E013 or E015). De-couple the inverter from the system before maintenance. Red indicator blinks in every 0.5s, others off. |
| ☐ Run, ☐ Warn, ☑ Fault | Current-leakage or unqualified output power energy of the inverter (E007, E010, E014, E017, E018 or E020). De-couple the inverter from the system before maintenance. Red indicator keeps on, others off. | |
| Artificial turned off | ● Run, ● Warn, ● Fault | Stop after the communication or panel command. All indicators are on. |
Note: Please refer to chapter 5 and 7 for detailed fault information and troubleshooting.
6.2 Operation Panel
There are 4 buttons on the panel:
- "ESC": exit and return;
- "^" (Up arrow): back to the front page and data increasing;
- "V" (Down arrow): to the next page and data decreasing;
- "ENT": enter.
The machine can be turned on and off by pressing "ESC" and "ENT" simultaneously (about 3 seconds) for quick start-up and stop.
6.3 LCD Screen
All information is displayed on the LCD screen. The background illumination of the LCD screen will turn off after 15 seconds of no button operation to save power, but it can be reactivated by pressing any button. Press "ENT" to enter the main interface if the background illumination is on. All parameters can be viewed and set on the interface.
There are main interface and menu interfaces on the LCD screen. The main interface is the default after power on, while menu interfaces are used to view and set parameters or perform other manual operations, such as viewing monitoring parameters, history records, system information, statistics, fault information, and setting the displayed language, time, communication address, password, and factory defaults.
The main interface of the LCD screen displays the following:
- The curve displays the power changing at the current day.
- The words on the screen display the current key parameters of the inverter. Three lines of words are displayed at a time, but if the inverter is in operation or stand-by state, the words are rolling forward every 3s. The user can press "^" or "V" to look up the information freely.
- 5 states of the inverter are displayed on the screen.
- If the inverter is in fault or warning state, up to 8 corresponding fault codes can be displayed on the screen.
6.4 Functions Operation
Most parameters can be viewed and set through the LCD screen and operation panel.
6.4.1 Monitoring Parameters
Press "^" and "V" in the main interface to select "Monit Param", then press "ENT" to view the parameters shown in Figure 6.4. Navigate through pages using "^" and "V", and return using "ESC".
6.4.2 History
Press "^" and "V" in the main interface to select "History", then press "ENT" to view the parameters shown in Figure 6.5.
There are 32 history records in total. Press "^" and "V" to review the history record and press "ESC" to exit. The numbers on the top right indicate the serial number of the record, and the numbers in the second line display the date when faults occurred and were settled. If the color of the third line illuminates, a fault is active; otherwise, the fault is resolved.
6.4.3 Statistics
Press "^" and "V" in the main interface to select "Statistics", then press "ENT" to view the parameters shown in Figure 6.6.
The information in Table 6-2 can be viewed in the statistical menu.
Statistic Information:
| Content | Detailed |
|---|---|
| Lifetime | Total operation time, total power produced, total power saved, total CO₂ reduction in lifetime |
| Day statistics | Total power produced, total power saved, peak power and total CO₂ reduction in current day |
6.4.4 Parameter Settings
Press "^" and "V" in the main interface to select "Setup Menu", then press "ENT" to view the parameters shown in Figure 6.7. Parameters can be set in this interface.
Parameters Setting:
| Setting item | LCD display | Instruction |
|---|---|---|
| RS485 Address | RS485 Address 001 | Enter the interface and edit data using "^" or "V". Press "ENT" again for the next bit. After editing three bits, press "ENT" to save and "ESC" to exit. |
| User password | User Password 0000 | Enter the interface and edit data using "^" or "V". Press "ENT" again for the next bit. After editing four bits, press "ENT" to save and "ESC" to exit. |
| Setup Cash | Setup Cash Type: EUR Val/kWh: 00.50€/1 kWh | Enter the interface and edit currency type and cash using "^" or "V". Press "ENT" again for the next line. After editing four bits, press "ENT" to save and "ESC" to exit. Currency types include EUR, POD, CNY, and USD. |
| Setup Date/Time | Setup Date/Time Date: 2012/01/15 Time: 12:14:30 | Enter the interface and edit date and time using "^" or "V". Press "ENT" again for the next line. After editing four bits, press "ENT" to save and "ESC" to exit. |
| Language | Curr. Language: English English Dutch Chinese German | Enter the interface and edit language using "^" or "V". Press "ENT" again to save and "ESC" to exit. The default language is English. |
| Select Country | Country: Australia German Greece Denmark England Holland Australia | Enter the interface and select country using "^" or "V". Press "ENT" again to save and "ESC" to exit. |
| Setup mode | Setup Model: Independ Independ Parallel | The DC input mode includes "independent" and "parallel". "Independent mode" is the independent MPPT of Track A and Track B; "parallel mode" is the parallel MPPT of Track A and Track B. The default mode is "independent". The input mode setting is invisible if the inverter is in power generation. It is only available during DC power on and AC power off. Press "^" or "V" to select the setting mode and press "ENT" to save the setting or "ESC" to return. If the situation of section 6.4.8 occurs, it is necessary to switch the DC input to "parallel" mode. |
6.4.5 System Information
Press "^" and "V" in the main interface to select "System Information", then press "ENT" to view the parameters shown in Figure 6.8. The system information includes "product model", "serial No.", "software version", and "certificate version".
6.4.6 Faults
Press "^" and "V" in the main interface to review the fault history, then press "ENT" to view the sub-menu shown in Figure 6.10.
There are 8 pieces of fault information in the record. If no faults are present, it will display "No Fault!". Refer to section 6.4.2 for more detailed information.
6.4.7 Inverter Control
Press "^" and "V" in the control interface, then press "ENT" to view the sub-menu shown in Figure 6.11.
Refer to the table below for detailed information:
| Control item | LCD display | Instruction |
|---|---|---|
| On/Off control | On/Off Ctrl ON OFF | Control the "On/Off" through the panel. Press "^" and "V" in the control interface to select the operation. Press "ENT" to ensure the operation and press "ESC" to return. |
| Restart | Restart Press ENT to execute. Press ESC to cancel. | Restart the inverter through the panel. Save all settings and operation records. Press "ENT" to ensure restarting and the inverter will begin to self-inspect or press "ESC" to return. |
| Record clear | Clear all Record: Sure? Press ENT to execute. Press ESC to cancel. | Press "ENT" to ensure clear all records or press "ESC" to return. "Record clear" clears all setting parameters through the panel, restores to factory setting, and saves all history operation records. |
| Restore to factory | Restore to Factory Press ENT to execute. Press ESC to cancel. | "Restore to factory" clears all setting parameters and history operation records through the panel, restores to the factory setting. Press "ENT" to ensure clear or press "ESC" to return. |
6.4.8 Mode Settings
The default mode of the series grid-tied solar inverter is "independent". However, if the current of solar modules are joined into the inverter, it is necessary to switch the mode to "parallel".
- Only when there is more than 100V DC voltage input, the LCD display is working, and the AC switch is off, can you query and modify the inverter DC input mode via the LCD screen and keypad.
6.5 Grid Certification Choice
When powering on the inverter by DC input for the first time or after restoring factory settings, the LCD screen will prompt as follows:
SOLAR INVERTER
Initialing......Waiting
>>>>>>>
After a few seconds, a list of countries will appear on the LCD screen, requiring the user to choose the country of use. Press "^" or "V" to navigate the country, then press "ENT" to complete the setting.
After determining the location, follow the user manual for proper use of the inverter. The user can change the location through the following ways: LCD Screen: MENU → Main Menu: Setup → Setup Menu: Country → Country.
The user can query the grid certification that has been set through the following ways: LCD Screen: MENU → Main Menu: System Info → System Information: Cert. Area → Certificate Area.
Comparison Table: Available Countries and their Grid Certification
| No. | Country | Certification | Remark |
|---|---|---|---|
| 1 | Germany | VDE0126 & AR-N4105 | |
| 2 | UK | G83/G59 | |
| 3 | Australia | AS4777 | |
| 4 | Greece | VDE0126 | |
| 5 | Denmark | TF321 | |
| 6 | Holland | C10/C11 | |
| 7 | China | CQC | |
| 8 | Thailand | PEA | |
| 9 | Other | VDE0126 |
Reference Table: Grid Certification and Grid Voltage and Frequency of Some Countries
| No. | Country | Certification | Single-phase voltage | Grid frequency |
|---|---|---|---|---|
| 1 | Germany | VDE0126 & AR-N4105 | 220~230V | 50Hz |
| 2 | France | |||
| 3 | Greece | |||
| 4 | Turkey | |||
| 5 | Romania | |||
| 6 | Slovakia | |||
| 7 | Portugal | |||
| 8 | Poland | |||
| 9 | Hungary | |||
| 10 | Switzerland | |||
| 11 | Austria | |||
| 12 | UK | G83-2/G59-3 | 240V | 50Hz |
| 13 | Australia | AS4777.2 & AS4777.3 AS/NZS3100 | 230~240V | 50Hz |
| 14 | Singapore | |||
| 15 | New Zealand | |||
| 16 | Belgium | |||
| 17 | Luxembourg | C10/C11 | 220~230V | 50Hz |
| 18 | Holland | |||
| 19 | Denmark | TF3.2.1 | 220~230V | 50Hz |
| 20 | Thailand | PEA | 220V | 50Hz |
| 21 | China | CGC/CF001 | 220V | 50Hz |
| 22 | Italy | ENEL | 230V | 50Hz |
7. Monitoring Communication
This chapter describes the communication connection between the inverter and monitoring systems (industrial master, private computers, smart phones, etc.).
The standard communication mode of iMars grid-tied solar inverter is RS485, which includes "RS485-M" and "RS485-S" ports. The RS485-M ports can communicate with private computers, smart phones, and so on. The system monitoring solution is shown in Figure 7.1.
7.1 Standard Communication
Pins on Inverter Instruction:
| Pin on inverter | Definition |
|---|---|
| 1 | +5VDC |
| 2 | A (RS485+) |
| 3 | B (RS485-) |
| 4 | GND |
Connection steps:
- Weld communication cables to the RS485 terminals of the inverter as shown in Figure 7.4. Ensure the cable corresponds to the pin as shown in Table 7-1 and the welding is tight enough.
- According to Table 7-1, connect the communication connector pinout to the user's device, making sure the connection is correct.
- Please download the monitoring software "iMars WinExpert" and its operation instruction.
8. Troubleshooting
This chapter describes fault alarms and fault codes for quick troubleshooting.
Fault Code Table:
| Fault code | Message | Instruction | Fault analysis |
|---|---|---|---|
| A | |||
| A001 | Input UV | Input undervoltage | PV1 undervoltage, PV2 undervoltage |
| A002 | Bus UV | Bus undervoltage | DC input |
| A003 | Grid UV | AC undervoltage | Low voltage of the public grid |
| A004 | Grid OV | AC overvoltage | High voltage of the public grid |
| A005 | Grid UF | AC underfrequency | Low frequency of the public grid |
| A006 | Grid OF | AC overfrequency | High frequency of the public grid |
| A007 | Clock Fail | Clock alarm | Wrong setting |
| A009 | Cmd Shut | Manual shutdown | Stop by the operation panel or upper PC |
| A011 | Grid Loss | The public grid disconnects. | Check if inverter AC connection is well |
| E | |||
| E001 | Input OV | Input overvoltage | DC input overvoltage |
| E003 | Bus OV | Bus overvoltage | Internal bus voltage |
| E004 | Boost Fail | Voltage-boost fault | Voltage-boost fault of the inverter |
| E005 | Grid OC | AC overcurrent | Internal AC overcurrent |
| E006 | OTP | Overtemperature | Internal overtemperature |
| E007 | Riso Low | Low isolation impedance | Low isolation impedance of the external port system |
| E008 | IGBT drv | IGBT drive protection | IGBT drive protection of the inverter |
| E009 | Int Comm | Internal communication fault | Master-slave DSP communication disabled. Error of master-slave DSP check bit. |
| E010 | ILeek Fail | Huge leakage current | Huge leakage current of the system or inverter |
| E011 | Relay Fault | Relay fault | Internal relay fault |
| E012 | Fan Fail | Fan fault | Internal fan fault |
| E013 | Eeprom | Memory error | Internal memory error |
| E014 | Dc inject | High DC injection | High DC injection during AC output |
| E015 | OutputShort | Output short-circuit | Output short-circuit |
| E018 | Input OC | Input overcurrent | DC input overcurrent |
| E019 | Incnst | Data consistency fault | Inconsistent grid voltage, frequency, leakage current or AC/DC injection |
| E020 | PowerReversed | DC power reversed | DC power reversed |
If any problem occurs, please contact the supplier and provide the following information:
- Model of the inverter:
- Serial No. of the inverter:
- System version: version 1: , version 2: , MCU software version:
- Fault code:
- Fault description:
9. Specifications
Detailed technical parameters for the INVT grid-tied solar inverters are provided below.
Technical Parameters:
| Model | Single-phase | |||||
|---|---|---|---|---|---|---|
| MG750TL | MG1KTL | MG1K5TL | MG2KTL | MG3KTL | ||
| Input (DC) | Max. DC voltage (V) | 400 | 450 | 450 | 500 | 600 |
| Starting voltage (V) | 60 | 80 | 80 | 120 | 120 | |
| MPPT voltage (V) | 50-400 | 70-400 | 80-410 | 100-410 | 120-500 | |
| Operation voltage (V) | 100-320 | 121-360 | 165-360 | 180-360 | 210-400 | |
| MPPT/strings per MPPT | 1/1 | 1/1 | 1/1 | 1/2 | 1/2 | |
| Max. DC power (W) | 900 | 1200 | 1700 | 2200 | 3300 | |
| Max input current (A) | 8x1 | 9x1 | 10x1 | 12x1 | 15x1 | |
| Output (AC) | Max output power | 750 | 1000 | 1500 | 2000 | 3000 |
| Voltage(V)/frequency (Hz) | 180~270Vac, 50Hz(47~51.5Hz)/60Hz(57~61.5Hz) | |||||
| Max. AC current (A) | 3.6 | 4.5 | 6.5 | 9 | 13 | |
| Power factor | ≥0.99 (at rated power) | |||||
| Harmonic distortion | <3% (at rated power) | |||||
| System | Cooling | Natural cooling | ||||
| Maximum efficiency | 96.90% | 97.20% | 97.30% | 97.60% | 97.60% | |
| European efficiency | 96.00% | 96.10% | 96.30% | 96.50% | 96.50% | |
| MPPT efficiency | 99.9% | |||||
| Protection degree | IP65 | |||||
| Power consumption | <1W | |||||
| Isolation mode | Transformerless | |||||
| Protective class | I | |||||
| Overvoltage category | AC:III, PV:II | |||||
| Inverter topology | Non-isolated | |||||
| Pollution degree | 3 | |||||
| Operation temperature | -25°C~+60°C (derate after 45°C) | |||||
| Relative humidity | 4-100%, Condensation | |||||
| Max. altitude (m) | <2000 (derate if the altitude >2000) | |||||
| Displaying | LED/LCD, backlit display | |||||
| System language | English, Chinese, German, Dutch | |||||
| Communication | RS485 (standard); handheld keypad; WiFi (optional) | |||||
| DC terminal | BC03A/BC03B | |||||
| Noise dB(A) | <25 | |||||
| Installation mode | Wall installation | |||||
| Protection | Input overvoltage protection, input overcurrent protection, DC isolation monitoring, DC monitoring, grounding fault current monitoring, grid monitoring, island protection, short circuit protection, overheating protection | |||||
Note: This table provides specifications for various models. The MG5KTL model is specifically covered in this manual.
10. Warranty & Support
The INVT MG5KTL Solar Inverter comes with a 5-year warranty, ensuring reliability and peace of mind for your solar power system.
For comprehensive details regarding the warranty terms, conditions, and support procedures, please refer to the official user manual PDF available for download. This PDF contains in-depth information on all aspects of product support and service.
A detailed user manual in PDF format is available for download. This document provides extensive information on installation, operation, maintenance, and troubleshooting beyond what is covered here. View User Manual (PDF)
11. User Tips
Based on common user inquiries and product information, here are some helpful tips for your INVT MG5KTL inverter:
- Optional Accessories: The WiFi module and CT sensors are typically sold separately and are not included with the main inverter unit. Ensure you purchase these if you require real-time monitoring or zero-export functionality.
- Zero Export Function: If you do not wish to feed power back into the local grid, ensure you utilize the CT (Current Transformer) function. This feature allows the inverter to limit power output to match local consumption.
- PV Panel Compatibility: For the 5000W model, the maximum recommended PV input panel power is 6000W, with a PV input range of 120-550VDC. Always verify your solar panel array specifications against these limits.
- WiFi Connection Troubleshooting: If you encounter issues connecting to WiFi, ensure the distance between your WiFi router and the Stick Logger is under 10 meters. If the network is not found, try shortening the distance, checking your router settings, or manually entering the network ID. Avoid enterprise routers that may restrict WiFi connectivity.
- App Monitoring: For real-time monitoring of inverter data via your smartphone, download the "SOLARMAN" app from the Apple App Store (iOS) or Google Play Store (Android). Follow the in-app instructions for registration and plant creation.