1. Introduction
This manual describes the assembly, installation, operation, and troubleshooting of the PowMr 10.2KW Hybrid Solar Inverter. Please read this manual carefully before installation and operation. Keep this manual for future reference.
1.1 Features
- Pure sine wave inverter.
- Configurable input voltage range for home appliances and personal computers via LCD setting.
- Configurable battery charging current based on applications via LCD setting.
- Configurable AC/Solar Charger priority via LCD setting.
- Compatible with mains voltage or generator power.
- Auto restart while AC is recovering.
- Overload/Over temperature/short circuit protection.
- Smart battery charger design for optimized battery performance.
- Cold start function.
- Dual AC output.
- Built-in Lithium battery automatic activation.
- Applicable for household appliances, farm tools, factory equipment, commercial load, industrial machinery.
- Suitable for Asia, Europe, Africa, and North America (220-240VAC drivers).
1.2 Basic System Architecture
The PowMr 10.2KW Hybrid Solar Inverter is designed to provide uninterruptible power support. A complete running system typically includes the inverter/charger, a generator or utility connection, PV modules, and external battery packs.

2. Safety Instructions
WARNING: This chapter contains important safety and operating instructions. Read and keep this manual for future reference.
- Before using the unit, read all instructions and cautionary markings on the unit, the batteries, and all appropriate sections of this manual.
- CAUTION – To reduce risk of injury, charge only deep-cycle lead acid type rechargeable batteries. Other types of batteries may burst, causing personal injury and damage.
- Do not disassemble the unit. Take it to a qualified service center when service or repair is required. Incorrect re-assembly may result in a risk of electric shock or fire.
- To reduce risk of electric shock, disconnect all wirings before attempting any maintenance or cleaning. Turning off the unit will not reduce this risk.
- CAUTION – Only qualified personnel can install this device with battery.
- NEVER charge a frozen battery.
- For optimum operation of this inverter/charger, please follow required specifications to select appropriate cable size. It's very important to correctly operate this inverter/charger.
- Be very cautious when working with metal tools on or around batteries. A potential risk exists to drop a tool to spark or short circuit batteries or other electrical parts and could cause an explosion.
- Please strictly follow installation procedure when you want to disconnect AC or DC terminals. Please refer to the INSTALLATION section of this manual for details.
- One piece of 150A fuse is provided as over-current protection for the battery supply.
- GROUNDING INSTRUCTIONS – This inverter/charger should be connected to a permanent grounded wiring system. Be sure to comply with local requirements and regulations to install this inverter.
- NEVER cause AC output and DC input short circuited. Do NOT connect to the mains when DC input short circuits.
- Warning!! Only qualified service persons are able to service this device. If errors still persist after following troubleshooting table, please send this inverter/charger back to local dealer or service center for maintenance.
3. Installation
3.1 Unpacking and Inspection
Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should have received the following items inside the package:
- The unit x 1
- User manual x 1
- Ring terminal x 1
- MC4 terminal head x2
3.2 Product Overview


3.3 Preparation
Before connecting all lines, remove the screws under the machine and remove the bottom cover plate.
3.4 Mounting the Unit
Consider the following points before selecting where to install:
- Do not mount the inverter on flammable construction materials.
- Mount on a solid surface.
- Install this inverter at eye level in order to allow the LCD display to be read at all times.
- For proper air circulation to dissipate heat, allow a clearance of approximately 20 cm to the side and approximately 50 cm above and below the unit.
- The ambient temperature should be between 0°C and 55°C to ensure optimal operation.
- The recommended installation position is to be adhered to the wall vertically.
- Make sure that other objects and surfaces are left with enough space from the machine to ensure adequate heat dissipation and that there is enough room to remove the wires.
SUITABLE FOR MOUNTING ON CONCRETE OR OTHER NON-COMBUSTIBLE SURFACE ONLY.
Install the unit by screwing two screws. It's recommended to use M4 or M5 screws.
3.5 Battery Connection
CAUTION:
For safety operation and regulation compliance, it's requested to install a separate DC over-current protector or disconnect device between battery and inverter. It may not be requested to have a disconnect device in some applications, however, it's still requested to have over-current protection installed. Please refer to typical amperage in below table as required fuse or breaker size.
WARNING! All wiring must be performed by a qualified personnel.
WARNING! It's very important for system safety and efficient operation to use appropriate cable for battery connection. To reduce risk of injury, please use the proper recommended cable as below.
Recommended battery cable size:
| Model | Wire Size | Cable (mm²) | Torque value (max) |
|---|---|---|---|
| 8.2KW/10.2KW | 1 x 2AWG | 25 | 2 Nm |
Please follow below steps to implement battery connection:
- Remove insulation sleeve 18 mm for positive and negative conductors.
- Suggest to put bootlace ferrules on the end of positive and negative wires with a proper crimping tool.
- Connect all battery packs as shown in the diagram below.

4. Insert the battery wires flatly into battery connectors of inverter and make sure the bolts are tightened with torque of 2 Nm in clockwise direction. Make sure polarity at both the battery and the inverter/charger is correctly connected and conductors are tightly screwed into the battery terminals. Recommended tool: #2 Pozi Screwdriver.
WARNING: Shock Hazard. Installation must be performed with care due to high battery voltage in series.
CAUTION!! Before making the final DC connection or closing DC breaker/disconnector, be sure positive (+) must be connected to positive (+) and negative (-) must be connected to negative (-).
3.6 AC Input/Output Connection
CAUTION!!
Before connecting to AC input power source, please install a separate AC breaker between inverter and AC input power source. This will ensure the inverter can be securely disconnected during maintenance and fully protected from over current of AC input. The recommended spec of AC breaker is 63A for 8.2KW/10.2KW.
CAUTION!!
There are two terminal blocks with "IN" and "OUT" markings. Please do NOT mis-connect input and output connectors.
WARNING! All wiring must be performed by a qualified personnel.
WARNING! It's very important for system safety and efficient operation to use appropriate cable for AC input connection. To reduce risk of injury, please use the proper recommended cable size as below.
Suggested cable requirement for AC wires:
| Model | Gauge | Cable (mm²) | Torque Value |
|---|---|---|---|
| 8.2KW/10.2KW | 10 AWG | 6 | 1.2 Nm |
Please follow below steps to implement AC input/output connection:
- Before making AC input/output connection, be sure to open DC protector or disconnector first.
- Remove insulation sleeve 10mm for six conductors. And shorten phase L and neutral conductor N 3 mm.
- Insert AC input wires according to polarities indicated on terminal block and tighten the terminal screws. Be sure to connect PE protective conductor (yellow-green) first.
- Ground (yellow-green)
- L - LINE (brown or black)
- N - Neutral (blue)
WARNING: Be sure that AC power source is disconnected before attempting to hardwire it to the unit.
4. Then, insert AC output wires according to polarities indicated on terminal block and tighten terminal screws.
- L - LINE (brown or black)
- N - Neutral (blue)
5. Make sure the wires are securely connected.
3.7 PV Connection
CAUTION:
Before connecting to PV modules, please install separately a DC circuit breaker between inverter and PV modules.
WARNING! It's very important for system safety and efficient operation to use appropriate cable for PV module connection. To reduce risk of injury, please use the proper recommended cable size as below.
Suggested cable requirement for PV wires:
| Model | Wire Size | Cable (mm²) | Torque value (max) |
|---|---|---|---|
| 8.2KW/10.2KW | 1 x 10AWG | 6 | 1.2 Nm |
PV Module Selection:
When selecting proper PV modules, please be sure to consider below parameters:
- Open circuit Voltage (Voc) of PV modules not exceeds max. PV array open circuit voltage of inverter.
- Open circuit Voltage (Voc) of PV modules should be higher than min. battery voltage.
| INVERTER MODEL | 8.2KW/10.2KW |
|---|---|
| Max. PV Array Open Circuit Voltage | 500Vdc |
| PV Array MPPT Voltage Range | 90Vdc~450Vdc |
Take 250Wp PV module as an example. After considering above two parameters, the recommended module configurations are listed as below table.
| Solar Panel Spec. (reference) | SOLAR INPUT (Min in serial: 6 pcs, max. in serial: 13 pcs) | Q'ty of panels | Total input power |
|---|---|---|---|
| 250Wp, Vmp: 30.1Vdc, Imp: 8.3A, Voc: 37.7Vdc, Isc: 8.4A, Cells: 60 | 6 pcs in serial | 6 pcs | 1500W |
| 8 pcs in serial | 8 pcs | 2000W | |
| 12 pcs in serial | 12 pcs | 3000W | |
| 13 pcs in serial | 13 pcs | 3250W | |
| 12 pieces in serial and 3 sets in parallel | 36 pcs | 8200W | |
| 10 pieces in serial and 4 sets in parallel | 40 pcs | 10200W |
PV Module Wire Connection
Step 1: Check the input voltage of PV array modules. The acceptable input voltage of the inverter is 120VDC - 500VDC. Please make sure that the maximum current load of each PV input connector is 10A.
CAUTION: Exceeding the maximum input voltage can destroy the unit!! Check the system before wire connection.
Step 2: Disconnect the DC circuit breaker.
Step 3: Assemble provided PV connectors with PV modules by following the steps below.
Components for PV connectors and Tools:
| Female connector housing | Male terminal |
|---|---|
| Female terminal | Crimping tool and spanner |
| Male connector housing |
Cable preparation and connector assembly process:
Strip one cable 8 mm on both end sides and be careful NOT to nick conductors.
Insert striped cable into female terminal and crimp female terminal as shown in charts. Insert assembled cable into female connector housing as shown in charts. Insert striped cable into male terminal and crimp male terminal as shown in charts. Insert assembled cable into male connector housing as shown in charts.
Then, use spanner to screw pressure dome tightly to female connector and male connector as shown in the diagram. Step 4: Check correct polarity of connection cable from PV modules and PV input connectors. Then, connect positive pole (+) of connection cable to positive pole (+) of PV input connector. Connect negative pole (-) of connection cable to negative pole (-) of PV input connector.
3.8 Final Assembly
After connecting all wirings, please put the bottom cover back by screwing two screws as shown below.
3.9 Communication Connection
The inverter supports various communication methods:
- Wi-Fi cloud communication (option): Use the supplied communication cable to connect to the inverter and Wi-Fi module. Download the APP from the APP store and refer to the "Wi-Fi Plug Quick Installation Guideline" to set up the network and register. The inverter status will be shown by mobile phone APP or computer webpage.
- GPRS cloud communication (option): Use the supplied communication cable to connect to the inverter and GPRS module, then apply external power to the GPRS module. Download the APP from the APP store and refer to the "GPRS RTU Quick Installation Guideline" to set up the network and register. The inverter status will be shown by mobile phone APP or computer webpage.
- Battery communication: The communication between the battery and the inverter can be realized through the battery communication interface, allowing the inverter and the lithium battery to exchange information (Baud rate: 9600).
- Lithium battery and inverter connection: Use power cables and communication cables for lithium batteries and inverters to connect. Note: For lithium battery and inverter positive and negative positions, check for correct installation. The RJ45 connector of the communication cable connects to the BMS port of the inverter, and the other RJ45 connector connects to the RS485 port of the lithium battery. Before connecting, make sure that the lithium battery and inverter are turned off. (It is recommended to install a circuit breaker for the power cables of the lithium battery and the inverter battery interface. Otherwise, a spark may occur.)
Lithium battery communication cable interface:
The RJ45 connects to the BMS port on the inverter. The RJ45 connects to the RS485 port of the lithium battery.
Lithium battery connection diagram:
In order to communicate with the lithium battery BMS, you should press the "ENTER" button for a long time, and set the battery type as "LIB-485" in program 05. Then select the matching battery protocol in Program 43.
| Program | Description | Setting |
|---|---|---|
| 05 | Battery type | AGM (default): 05 AGn Flooded: 05 FLd User Defined: 05 USE LIB: 05 LIB |
| 43 | Lithium battery protocol | PYLON: 43 PYL PACE: 43 PAC |
CAUTION: When the battery type is set to "LIB-485", the setting items 12, 13 and 29 are displayed in percentage.
CAUTION: When the battery type is set to "LIB-485", the user cannot modify the maximum charging current. When communication fails, the inverter will cut off the output.
4. Operation
4.1 Power ON/OFF
Once the unit has been properly installed and the batteries are connected well, simply press the On/Off switch (located on the button of the case) to turn on the unit.
4.2 Operation and Display Panel
The operation and display panel, shown in the chart below, is on the front panel of the inverter. It includes three indicators, four function keys, and an LCD display, indicating the operating status and input/output power information.

LED Indicator:
| LED Indicator | Color | State | Messages |
|---|---|---|---|
| INV/AC | Green | Solid On Flashing | Output is powered by utility in Line mode. Output is powered by battery or PV in battery mode. |
| CHG | Green | Solid On Flashing | Battery is fully charged. Battery is charging. |
| FAULT | Red | Solid On Flashing | Fault occurs in the inverter. Warning condition occurs in the inverter. |
Function Keys:
| Function Key | Description |
|---|---|
| ESC | To exit setting mode |
| UP | To go to previous selection |
| DOWN | To go to next selection |
| ENTER | To confirm the selection in setting mode or enter setting mode |
4.3 LCD Display Icons
The LCD display information will be switched in turns by pressing "UP" or "DOWN" key. The selectable information is switched as below order: input voltage, input frequency, PV voltage, charging current, charging power, battery voltage, output voltage, output frequency, load percentage, load in Watt, load in VA, load in Watt, DC discharging current, main CPU Version.
Input Source Information:
| Icon | Function description |
|---|---|
| GRID | Indicates the AC input. |
| SOLAR | Indicates the PV input. |
| KW V Hz A | Indicate input voltage, input frequency, PV voltage, charger current (if PV in charging for 10.2KW models), charger power, battery voltage. |
Configuration Program and Fault Information:
| Icon | Function description |
|---|---|
| 8.8.8 | Indicates the setting programs. |
| ERROR | Indicates the warning and fault codes. |
| 8.8.8 (flashing) | Warning: flashing with warning code. |
| 8.8.8 (lighting) | Fault: lighting with fault code. |
Output Information:
| Icon | Function description |
|---|---|
| KW VA % | Indicate output voltage, output frequency, load percent, load in VA, load in Watt and discharging current. |
Battery Information:
| Icon | Function description |
|---|---|
| BATTERY | Indicates battery status. |
Load Information:
| Icon | Function description |
|---|---|
| OVER LOAD | Indicates overload. |
Mode Operation Information:
| Icon | Function description |
|---|---|
| Mains connection | Indicates unit connects to the mains. |
| PV panel connection | Indicates unit connects to the PV panel. |
| AC BYPASS | Indicates load is supplied by utility power. |
| Utility charger circuit | Indicates the utility charger circuit is working. |
| DC/AC inverter circuit | Indicates the DC/AC inverter circuit is working. |
Mute Operation:
| Icon | Function description |
|---|---|
| Mute | Indicates unit alarm is disabled. |
4.4 LCD Setting
After pressing and holding the ENTER button for 3 seconds, the unit will enter setting mode. Press "UP" or "DOWN" button to select setting programs. Then, press "ENTER" button to confirm the selection or ESC button to exit.
Setting Programs:
| Program | Description | Selectable option | Description |
|---|---|---|---|
| 00 | Exit setting mode | 00 GOE 00 GOK | One-button restore setting options |
| 01 | Output source priority: To configure load power source priority | 01 U56 (Utility first) 01 S06 (Solar first - default) 01 SBU (SBU priority) 01 MKS (MKS priority) | Utility will provide power to the loads as first priority. Solar and battery energy will provide power to the loads only when utility power is not available. Solar energy provides power to the loads as first priority. If solar energy is not sufficient to power all connected loads, utility will supply power to the loads at the same time. Battery provides power to the loads only when any one condition happens: Solar energy and utility is not available. Solar energy is not sufficient and utility is not available. Solar energy provides power to the loads as first priority. If solar energy is not sufficient to power all connected loads, battery energy will supply power to the loads at the same time. Utility provides power to the loads only when battery voltage drops to either low-level warning voltage or the setting point in program 12. Solar energy provides power to the loads as first priority, if solar energy is not sufficient to power all connected loads, utility energy will supply power to the loads at the same time. The battery only supplies energy to the load as a backup power. |
| 02 | Maximum charging current: To configure total charging current for solar and utility chargers. (Max. charging current = utility charging current + solar charging current) | 10A, 20A, 30A, 40A, 50A, 60A, 70A, 80A, 90A, 100A (default), 110A, 120A, 130A, 140A, 150A, 160A | Sets the maximum charging current. |
| 03 | AC input voltage range | 03 APL (Appliances - default) 03 UPS (UPS) | If selected, acceptable AC input voltage range will be within 90-280VAC. If selected, acceptable AC input voltage range will be within 170-280VAC. |
| 05 | Battery type | 05 AGn (AGM - default) 05 FLd (Flooded) 05 USE (User-Defined) 05 LIB (LIB-485) | Selects the battery type. If "User-Defined" is selected, battery charge voltage and low DC cut-off voltage can be set up in program 26, 27 and 29. |
| 06 | Auto restart when overload occurs | 06 Ltd (Restart disable - default) 06 LHE (Restart enable) | Enables or disables auto restart on overload. |
| 07 | Auto restart when over temperature occurs | 07 tEd (Restart disable - default) 07 EYE (Restart enable) | Enables or disables auto restart on over temperature. |
| 09 | Output frequency | 09 50Hz (50Hz - default) 09 60Hz (60Hz) | Sets the output frequency. |
| 10 | Output voltage | 10 220V (220V) 10 230V (230V - default) 10 240V (240V) | Sets the output voltage. |
| 11 | Maximum utility charging current | 2A, 10A, 20A, 30A, 40A, 50A, 60A, 70A, 80A (default), 90A, 100A, 110A, 120A, 130A, 140A | Sets the maximum charging current from utility. Note: If setting value in program 02 is smaller than that in program 11, the inverter will apply charging current from program 02 for utility charger. |
| 12 | Setting voltage point back to utility source when selecting "SBU priority" or "Solar first" in program 01. | Available options in 8.2KW/10.2KW model: 42V, 43V, 44V, 45V, 46V (default), 47V, 48V, 49V, 50V, 51V | Sets the battery voltage threshold for switching back to utility. |
| 13 | Setting voltage point back to battery mode when selecting "SBU priority" or "Solar first" in program 01. | Available options in 8.2KW/10.2KW model: Battery fully charged, 48V, 49V, 50V, 51V, 52V, 53V, 54V (default), 55V, 56V, 57V, 58V | Sets the battery voltage threshold for switching back to battery mode. |
| 18 | Alarm control | 18 60n (Alarm on - default) 18 60F (Alarm off) | When the buzzer beeps for more than 90 seconds without action, it will automatically turn off. |
| 19 | Auto return to default display screen | 19 ESP (Return to default display screen - default) 19 LEP (Stay at latest screen) | If selected, no matter how users switch display screen, it will automatically return to default display screen (Input voltage/output voltage) after no button is pressed for 1 minute. If selected, the display screen will stay at latest screen user finally switches. |
| 20 | Backlight control | 20 LON (Backlight on - default) 20 LOF (Backlight off) | Turns the LCD backlight on or off. |
| 22 | Beeps while primary source is interrupted | 22 AON (Alarm on - default) 22 AOF (Alarm off) | Enables or disables the buzzer when the primary source is interrupted. |
| 23 | Overload bypass: When enabled, the unit will transfer to line mode if overload occurs in battery mode. | 23 bYd (Bypass disable - default) 23 bYE (Bypass enable) | Enables or disables overload bypass. |
| 25 | Record Fault code | 25 FEN (Record enable - default) 25 FAS (Record disable) | Enables or disables fault code recording. |
| 26 | Bulk charging voltage (C.V voltage) | C 26 56.4V (8.2KW/10.2KW default setting: 56.4V) | If self-defined is selected in program 5, this program can be set up. Setting range is from 48.0V to 61.0V for 8.2KW/10.2KW model. Increment of each click is 0.1V. |
| 27 | Floating charging voltage | FLU 27 54.0V (8.2KW/10.2KW default setting: 54.0V) | If self-defined is selected in program 5, this program can be set up. Setting range is from 48.0V to 61.0V for 8.2KW/10.2KW model. Increment of each click is 0.1V. |
| 29 | Low DC cut-off voltage | COY 29 40.0V (8.2KW/10.2KW default setting: 40.0V) | If self-defined is selected in program 5, this program can be set up. Setting range is from 40.0V to 48.0V for 8.2KW/10.2KW model. Increment of each click is 0.1V. Low DC cut-off voltage will be fixed to setting value no matter what percentage of load is connected. |
| 30 | Battery equalization | 30 EEN (Battery equalization - default) 30 EdS (Battery equalization disable) | If "Flooded" or "User-Defined" is selected in program 05, this program can be set up. |
| 31 | Battery equalization voltage | EU 31 58.4V (8.2KW/10.2KW default setting: 58.4V) | Setting range is from 48.0V to 61.0V for 8.2KW/10.2KW model. Increment of each click is 0.1V. |
| 33 | Battery equalized time | 33 60 (60min - default) | Setting range is from 5min to 900min. Increment of each click is 5min. |
| 34 | Battery equalized timeout | 34 120 (120min - default) | Setting range is from 5min to 900 min. Increment of each click is 5 min. |
| 35 | Equalization interval | 35 30d (30days - default) | Setting range is from 0 to 90 days. Increment of each click is 1 day. |
| 36 | Equalization activated immediately | 36 AEN (Enable) 36 AdS (Disable - default) | If equalization function is enabled in program 30, this program can be set up. If "Enable" is selected in this program, it's to activate battery equalization immediately and LCD main page will show "E9". If "Disable" is selected, it will cancel equalization function until next activated equalization time arrives based on program 35. At this time, "E9" will not be shown in LCD main page. |
| 37 | GRID-tie operation | 37 OFF (Off grid - default) 37 HYd (Hybrid) | Inverter operates only in off-grid mode. Solar energy provides power to the loads as first priority and charging second. Inverter operates hybrid mode. Solar energy provides power to the loads as first priority and charging second. Excess energy feed to grid. |
| 38 | GRID-tie current | 38 10A (10A) | Increment of each click is 2A. |
| 39 | Led pattern light | 39 LOF (Led pattern off) 39 LON (Led pattern on - default) | Turns the LED pattern light on or off. |
| 41 | Dual output | 41 L2F (disable - default) 41 L20 (use) | Enables or disables dual output. |
| 42 | Enter the dual output functional voltage point | 42 44.0 (8.2KW/10.2KW default setting: 44.0V) | Setting range is from 40.0V to 52.0V for 48VDC model. Increment of each click is 0.1V. |
| 43 | Lithium battery protocol | 43 PYL (PYLON - default) 43 PAC (PACE) | Selects the lithium battery protocol. |
| 44 | Delayed grid access | 44 01S (disable) 44 ENA (enable - default) | Enables or disables delayed grid access. |
| 45 | Maximum Second Load | 20%~70% | If the inverter enters the dual output function, the output power of the second channel can be changed to 20%~70% of the rated power. |
4.5 Operating Mode Description
The inverter supports various operating modes, which are displayed on the LCD. When working in Grid-Tie mode, the display will flash every 3 seconds.
RGB Light (option):
- Battery Mode: Red Light
- Utility Mode: Blue Light
- PV Mode: Purple Light
4.6 Battery Equalization Description
Equalization function is added into the charge controller. It reverses the buildup of negative chemical effects like stratification, a condition where acid concentration is greater at the bottom of the battery than at the top. Equalization also helps to remove sulfate crystals that might have built up on the plates. If left unchecked, this condition, called sulfation, will reduce the overall capacity of the battery. Therefore, it's recommended to equalize battery periodically.
How to Apply Equalization Function:
You must enable the battery equalization function in monitoring LCD setting program 30 first. Then, you may apply this function in the device by either one of the following methods:
- Setting equalization interval in program 35.
- Active equalization immediately in program 36.
When to Equalize:
In the float stage, when the setting equalization interval (battery equalization cycle) is arrived, or equalization is active immediately, the controller will start to enter the Equalize stage.
Equalize charging time and timeout:
In the Equalize stage, the controller will supply power to charge the battery as much as possible until the battery voltage raises to the battery equalization voltage. Then, constant-voltage regulation is applied to maintain the battery voltage at the battery equalization voltage. The battery will remain in the Equalize stage until the setting battery equalized time is arrived.
However, in the Equalize stage, when the battery equalized time is expired and the battery voltage doesn't rise to the battery equalization voltage point, the charge controller will extend the battery equalized time until the battery voltage achieves the battery equalization voltage. If the battery voltage is still lower than the battery equalization voltage when the battery equalized timeout setting is over, the charge controller will stop equalization and return to the float stage.
4.7 Mains and Lithium Battery Activation Function
- After 90s of mains power connection to the inverter, the machine is connected to the mains and starts to work.
- The inverter is in lithium battery mode (item 05 is LIP or LIL). After the mains is connected, the battery is not connected, and the mains activation function is automatically enabled.
5. Clearance and Maintenance for Anti-Dust Kit
5.1 Overview
Every inverter is already installed with an anti-dust kit from the factory. The inverter will automatically detect this kit and activate an internal thermal sensor to adjust the internal temperature. This kit also keeps dust from your inverter and increases product reliability in harsh environments.
5.2 Clearance and Maintenance
Step 1: Please loosen the screw in a counterclockwise direction on the top of the inverter.
Step 2: Then, the dustproof case can be removed, and the air filter foam can be taken out as shown in the diagram.
Step 3: Clean the air filter foam and dustproof case. After clearance, re-assemble the dust-kit back to the inverter.
NOTICE: The anti-dust kit should be cleaned from dust every one month.
6. Troubleshooting
6.1 Fault Reference Code
| Fault Code | Fault Event | Icon on |
|---|---|---|
| 01 | Fan is locked when inverter is off. | 01 ERROR |
| 02 | Over temperature | 02 ERROR |
| 03 | Battery voltage is too high | 03 ERROR |
| 04 | Battery voltage is too low | 04 ERROR |
| 05 | Output short circuited or over temperature is detected by internal converter components. | 05 ERROR |
| 06 | Output voltage is too high. | 06 ERROR |
| 07 | Overload time out | 07 ERROR |
| 08 | Bus voltage is too high | 08 ERROR |
| 09 | Bus soft start failed | 09 ERROR |
| 51 | Over current or surge | 51 ERROR |
| 52 | Bus voltage is too low | 52 ERROR |
| 53 | Inverter soft start failed | 53 ERROR |
| 55 | Over DC voltage in AC output | 55 ERROR |
| 57 | Current sensor failed | 57 ERROR |
| 58 | Output voltage is too low | 58 ERROR |
| 59 | PV voltage is over limitation | 59 ERROR |
Battery Fault Code (Lithium Battery Mode):
| Fault Code | Fault Event | Fault Condition |
|---|---|---|
| 02 | The battery temperature is too high Procedure | Lithium battery charging battery temperature ≥65°C. The discharge temperature of the lithium battery is higher than 70°C. |
| 03 | The battery voltage is too high Procedure | Lithium battery maximum single cell voltage >3.65V. Total voltage of lithium battery >54.6V (48V lithium battery). |
| 04 | The battery voltage is too low Procedure | Minimum voltage of a lithium battery cell <2.71V. Lithium battery total voltage <40.4V (48V lithium battery). |
6.2 Warning Indicator
| Warning Code | Warning Event | Audible Alarm | Icon flashing |
|---|---|---|---|
| 01 | Fan is locked when inverter is on. | Beep three times every second | 01 |
| 03 | Battery is over-charged | Beep once every second | 03 |
| 04 | Low battery | Beep once every second | 04 |
| 07 | Overload | Beep once every 0.5 second | 07 |
| 10 | Output power derating | Beep twice every 3 seconds | 10 |
| 15 | PV energy is low. | Beep twice every 3 seconds | 15 |
| E9 | Battery equalization | None | E9 |
| 6P | Battery is not connected | None | 6P |
Added a battery warning code in lithium battery mode:
| Warning code | Warning event | Warning condition |
|---|---|---|
| 04 | The battery voltage is too low | Minimum voltage of a lithium battery cell <2.85V; Lithium battery total voltage <42V (48V lithium battery). |
| 05 | The battery voltage is too high | Lithium battery maximum single cell voltage >3.55V; Total voltage of lithium battery >54V (48V lithium battery). |
| 06 | The battery is low warning | Remaining battery capacity ≤10% |
6.3 Approximate Back-up Time Table
| Model | Load (W) | Backup Time @ 48Vdc 100Ah (min) | Backup Time @ 48Vdc 200Ah (min) |
|---|---|---|---|
| 8.2KW/10.2KW | 500 | 613 | 1288 |
| 1000 | 268 | 613 | |
| 1500 | 158 | 402 | |
| 2000 | 111 | 271 | |
| 2500 | 90 | 215 | |
| 3200 | 76 | 182 | |
| 3500 | 65 | 141 | |
| 4000 | 50 | 112 | |
| 4500 | 44 | 100 | |
| 5000 | 40 | 90 | |
| 6200 | 36 | 80 | |
| 7200 | 32 | 70 | |
| 8200 | 28 | 60 | |
| 9200 | 24 | 50 | |
| 10200 | 20 | 40 |
Note:
- Backup time depends on the quality of the battery, age of battery and type of battery. Specifications of batteries may vary depending on different manufacturers.
- The final interpretation right of this product belongs to the company.
7. Specifications
7.1 Table 1 Line Mode Specifications
| INVERTER MODEL | 8.2KW | 10.2KW |
|---|---|---|
| Input Voltage Waveform | Sinusoidal (utility or generator) | |
| Nominal Input Voltage | 230Vac | |
| Low Loss Voltage | 170Vac±7V (UPS); 90Vac±7V (Appliances) | |
| Low Loss Return Voltage | 180Vac±7V (UPS); 100Vac±7V (Appliances) | |
| High Loss Voltage | 280Vac±7V | |
| High Loss Return Voltage | 270Vac±7V | |
| Max AC Input Voltage | 300Vac | |
| Nominal Input Frequency | 50Hz / 60Hz (Auto detection) | |
| Low Loss Frequency | 40±1Hz | |
| Low Loss Return Frequency | 42±1Hz | |
| High Loss Frequency | 65±1Hz | |
| High Loss Return Frequency | 63±1Hz | |
| Output Short Circuit Protection | Circuit Breaker | |
| Efficiency (Line Mode) | >95% (Rated R load, battery full charged) | |
| Transfer Time | 10ms typical (UPS); 20ms typical (Appliances) | |
7.2 Table 2 Inverter Mode Specifications
| INVERTER MODEL | 8.2KW | 10.2KW |
|---|---|---|
| Rated Output Power | 8.2KW | 10.2KW |
| Output Voltage Waveform | Pure Sine Wave | |
| Output Voltage Regulation | 230Vac±5% | |
| Output Frequency | 50Hz | |
| Peak Efficiency | 93% | |
| Overload Protection | 3s@≥150% load; 5s@101%~150% load | |
| Surge Capacity | 2* rated power for 5 seconds | |
| Nominal DC Input Voltage | 48Vdc | |
| Cold Start Voltage | 46.0Vdc | |
| Low DC Warning Voltage @ load < 50% | 44.0Vdc | |
| Low DC Warning Voltage @ load ≥ 50% | 42.0Vdc | |
| Low DC Warning Return Voltage @ load < 50% | 45.0Vdc | |
| Low DC Warning Return Voltage @ load ≥ 50% | 44.0Vdc | |
| Low DC Cut-off Voltage @ load < 50% | 41.0Vdc | |
| Low DC Cut-off Voltage @ load ≥ 50% | 40.0Vdc | |
| High DC Recovery Voltage | 62Vdc | |
| High DC Cut-off Voltage | 63Vdc | |
| No Load Power Consumption | 70W | 75W |
7.3 Table 3 Two Load Output Power
| INVERTER MODEL | 8.2KW | 10.2KW |
|---|---|---|
| Full Load | 8200W | 10200W |
| Maximum Main Load | 8200W | 10200W |
| Second Load Range | 1640W~5740W | 2040W~7140W |
| Main Load Cut Off Voltage | 52VDC | |
| Main Load Return Voltage | 54VDC | |
7.4 Table 4 Charge Mode Specifications
| Utility Charging Mode | 8.2KW | 10.2KW |
|---|---|---|
| Charging Algorithm | 3-Step | |
| AC Charging Current (Max) | 140Amp | 140Amp |
| Bulk Charging Flooded Battery Voltage | 58.4 | |
| AGM / Gel Battery Voltage | 56.4 | |
| Floating Charging Voltage | 54Vdc | |
MPPT Solar Charging Mode:
| INVERTER MODEL | 8.2KW | 10.2KW |
|---|---|---|
| Max. PV Array Power PV1 Channel | 5400W | 5400W |
| Max. PV Array Power PV2 Channel | 5400W | 5400W |
| IMax.PV PV1 Channel | 18A | |
| IMax.PV PV2 Channel | 18A | |
| Nominal PV Voltage | 360Vdc | |
| PV Array MPPT Voltage Range | 90Vdc~450Vdc | |
| Max. PV Array Open Circuit Voltage | 500Vdc | |
| Max Charging Current (AC charger plus solar charger) | 160Amp | |
7.5 Table 5 Grid-Tie Operation
| INVERTER MODEL | 8.2KW | 10.2KW |
|---|---|---|
| Nominal Output Voltage | 220/230/240 VAC | |
| Feed-in Grid Voltage Range | 195~253VAC | |
| Feed-in Grid Frequency Range | 50±1Hz/60±1Hz | |
| Nominal Output Current | 35.6A | 44.3A |
| Power Factor Range | >0.99 | |
| Maximum Conversion Efficiency (DC/AC) | 98% | |
7.6 Table 6 General Specifications
| INVERTER MODEL | 8.2KW | 10.2KW |
|---|---|---|
| Safety Certification | CE | |
| Operating Temperature Range | -10°C to 50°C | |
| Storage temperature | -15°C~60°C | |
| Humidity | 5% to 95% Relative Humidity (Non-condensing) | |
| Dimension (D*W*H), mm | 500*390*136mm | |
| Net Weight, kg | 14.5 | 14.7 |
8. User Tips
- This inverter supports a wide range of battery types including Lifepo4, Lithium, Flooded, Gel, and Lead-acid batteries, offering flexibility for your energy storage needs.
- The inverter features a built-in Lithium battery automatic activation, simplifying the setup process for compatible batteries.
- Ensure proper cable sizing for both battery and AC connections. This is crucial for safety and efficient operation of your solar power system.
- Regular maintenance of the anti-dust kit is recommended monthly to prevent dust accumulation and ensure product reliability, especially in harsh environments.
- The inverter supports grid-tie operation, allowing you to feed excess solar energy back into the general grid, potentially reducing your electricity bill.
- The output frequency can be configured to either 50Hz or 60Hz, making it adaptable to various regional power standards.
- The unit is designed for use in regions with 220-240VAC drivers, including Asia, Europe, Africa, and North America.
9. Warranty and Support
The PowMr 10.2KW Hybrid Solar Inverter comes with a 1-year warranty.
For further assistance, technical support, or to view the official user manual PDF, please refer to the following resources:
- User Manual (PDF): Download PDF
- Manufacturer Contact:
SHENZHEN HEHEJIN INDUSTRIAL CO.,LTD
Tel/Fax: +86755-28219903
Email: support@powmr.com
Web: www.powmr.com
Address: Henggang Street, Longgang District, Shenzhen, Guangdong, China